E F CHUA CONST INC is listed as a company organization in Philippine public procurement records on this site, with 205 linked DPWH project(s) totaling about ₱14,107,292,654.00. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
E F CHUA CONST INC
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 205
- Total value
- ₱14,107,292,654.00
- Published flags
- 6
- Region
- Las Piñas-Muntinlupa DEO · National Capital Region
Online presence
Google Maps: EF Chua Construction, Inc.★ 4.3 (9 reviews)Google Maps, 2026-10-22
H2H8+7FC, P. Domingo, St, Makati City, 1207 Metro Manila
Licensed officers (PCAB)
- Gerald Nemesio Gayoso Chua · Authorized Managing Officer (PCAB license 37826) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for E F CHUA CONST INC — not an accusation or finding of wrongdoing.
Score: 79.40 / 100 · Projects in sample: 205 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 60.4/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 60.4
- lateCompletedProjects
- 7
- onTimeCompletedProjects
- 136
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 187
- pastTargetOngoingProjects
- 44
- undatedCompletedProjectsExcluded
- 12
- Termination rate
Component score: 94.1/100 · Weight: 21%
- totalProjects
- 205
- componentScore
- 94.1
- terminatedProjects
- 4
- terminationRatePct
- 2
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 203
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.3/100 · Weight: 11%
- projects
- 205
- componentScore
- 99.3
- flagsPerProject
- 0.02
- publishedV2Flags
- 5
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 205
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 175 geotagged projects (largest by contract value) — Open full map
- UPGRADING OF CATMON PUMPING STATION, MALABON CITY19Z00017 · ₱416,382,958.09 · mapped
- UPGRADING/REHABILITATION OF NORTH NAVOTAS PUMPING STATION AND REPAIR OF NAVOTAS NAVIGATIONAL GATE (PHASE I)20O00094 · ₱382,428,672.32 · mapped
- CONSTRUCTION OF SAN ANDRES PUMPING STATION, MANILA (PHASE 2)25O00113 · ₱376,792,706.58 · mapped
- CONSTRUCTION OF ROAD ALONG RIVER, BRGY. MOLINO 3, MOLINO 6, SAN NICOLAS 1, 2 AND 3, BACOOR CITY, CAVITE22D00113 · ₱369,266,296.13 · mapped
- REVETMENT WORKS ALONG MARULAS TUNGTONG CREEK DIVERSION CHANNEL, LAS PIÑAS CITY21O00116 · ₱351,781,942.30 · mapped
- CONSTRUCTION OF FLOOD CONTROL ALONG ZAPOTE RIVER AND ITS TRIBUTARIES (UPSTREAM), LAS PINAS CITY20OI0122 · ₱289,499,791.64 · mapped
- CONSTRUCTION OF CUTCUT PUMPING STATION, PASAY CITY (PHASE 1)25OH0122 · ₱283,333,436.98 · mapped
- Construction of slope protection, road and other improvements along river in Molino III and Barangay Molino VI, Bacoor City, Cavite21D00079 · ₱244,114,309.50 · mapped
- UPGRADING OF MAYPAJO PUMPING STATION, CALOOCAN CITY22O00062 · ₱241,249,949.46 · mapped
- REHABILITATION AND IMPROVEMENT OF RETARDING POND AT TAPAYAN PUMPING STATION AND TRIBUTARIES, PASIG CITY25O00107 · ₱189,130,984.39 · mapped
- CONSTRUCTION OF REVETMENT WALL OF BACLARAN CHANNEL (PHASE 5) PARAÑAQUE CITY21O00038 · ₱188,252,566.21 · mapped
- UPGRADING OF SAN ANDRES PUMPING STATION, MANILA21O00123 · ₱186,073,017.03 · mapped
- REPLACEMENT OF TWO (2) BOX CULVERT ALONG LONGOS CREEK LEADING TO LONGOS PUMPING STATION AND REHABILITATION OF BOX CULVERT AT P. AQUINO AVE., BRGY. LONGOS, MALABON CITY20O00074 · ₱161,136,754.57 · mapped
- CONSTRUCTION OF SOUTH PINAGKABALIAN PUMPING STATION (PHASE 3), MALABON CITY25O00034 · ₱157,146,803.96 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND OTHER IMPROVEMENTS AT BACOOR SIDE, ZAPOTE RIVER UPSTREAM, (DAANG HARI TO AMORE BACOOR SIDE), BACOOR, CAVITE24D00224 · ₱144,782,963.79 · mapped
- Construction of South Pinagkabalian Pumping Station (Phase 2), Malabon City24O00023 · ₱144,747,339.90 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF ABUCAY PUMPING STATION (PHASE 2), MANILA24O00024 · ₱143,599,720.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. AND INSTALLATION OF PUMP AND ITS FACILITIES & APPURTENANCES AT BAC III DRIVE, PASAY25OH0043 · ₱143,085,276.01 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONSTRUCTION - MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION/UPGRADING OF EDSA PUMPING STATION, PASAY CITY25OH0051 · ₱143,085,002.30 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND OTHER IMPROVEMENTS AT LAS PINAS SIDE, ZAPOTE RIVER UPSTREAM, (DAANG HARI-AMORE), LAS PINAS CITY24OI0078 · ₱140,867,271.74 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES, LAGUNA LAKE (FROM BAUTISTA ST., TO MONTILLANO ST.) BRGY. BAYANAN AND BRGY. ALABANG, MUNTINLUPA CITY19O00038 · ₱140,043,604.66 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG LAGUNA DE BAY, STA. 0+000 TO STA. 0+179.00 AND STA. 0+000-B TO STA. 0+239.80-B TUNASAN AND BRGY. POBLACION, MUNTINLUPA CITY20O00070 · ₱139,550,468.07 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG LAGUNA DE BAY, STA. 0+000 TO STA. 0+339.80 AND STA. 0+000-B - STA. 0+331.80-B ALABANG AND BRGY. CUPANG, MUNTINLUPA CITY20O00071 · ₱139,425,324.03 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BALIHATAR - MARULAS CREEK, LAS PINAS CITY24OI0026 · ₱138,942,204.75 · mapped
- Construction of Dampalit Pumping Station (Phase 2), Malabon City23OA0082 · ₱134,190,886.80 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ROAD AND OTHER IMPROVEMENTS, BRGY. SAN NICOLAS 3-BRGY. SAN NICOLAS 1, BACOOR, CAVITE24D00230 · ₱133,203,617.53 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG ZAPOTE RIVER (UPSTREAM), LAS PINAS CITY19OI0155 · ₱115,716,539.13 · mapped
- REHABILITATION OF ROAD ALONG CHINO ROCES AVENUE (INCLUDING SIDEWALK AND DRIVEWAY), BARANGAY PIO DEL PILAR,MAKATI CITY, METRO MANILA24OC0082 · ₱115,236,000.00 · mapped
- FLOOD CONTROL PROJECTS BAS3ED ON FLOOD MASTER PLAN FOR METRO MANILA AND SURROUNDING AREAS, LAS PINAS RIVER IMPROVEMENT INCLUDING ROW (REVETMENT WORKS ALONG MARULAS-TUNGTONG CREEK DIVERSION CHANNEL (DPWH: KAYBUBOY CREEK TRIBUTARY)STA. 1+100 TO STA. 1+400,16O00047 · ₱114,864,618.79 · mapped
- PROPOSED CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ALABANG RIVER AND LAGUNA DE BAY, STA. 0+000 TO STA. 0+195 AND STA. 0+080-B, BRGY. ALABANG AND BRGY. CUPANG, MUNTINLUPA CITY19O00050 · ₱112,843,029.68 · mapped
- UPGRADING OF TAPAYAN PUMPING STATION, (UPGRADING OF POWER SUPPLY SYSTEM AND OTHER RELATED STRUCTURES), TAGUIG CITY22Z00025 · ₱102,294,462.84 · mapped
- CONSTRUCTION OF SLOPE PROTECTION / FLOOD CONTROL STRUCTURES AT BARANGAY TALON 2, LAS PINAS CITY25OI0074 · ₱101,867,324.37 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ZAPOTE RIVER UPSTREAM AND ITS TRIBUTARIES, LAS PINAS CITY25OI0079 · ₱98,564,620.58 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES, ROAD AND OTHER IMPROVEMENTS IN PALICO 4, IMUS, CAVITE23D00157 · ₱96,512,377.82 · mapped
- CONSTRUCTION OF DRAINAGE MAIN OF FINLANDIA OF SOUTH SUPER HIGHWAY TOWARDS ESTERO DE TRIPA DE GALLINA AND ITS VICINITY, BARANGAY SAN ISIDRO,MAKATI CITY, METRO MANILA24OC0039 · ₱96,499,978.09 · mapped
- Construction of Slope Protection (River Drive), Molino 3 to San Nicolas 1 (Section) Phase 2, Bacoor City, Cavite22D00085 · ₱96,499,256.16 · mapped
- CONSTRUCTION OF REVETMENT WALL/SHEET PILING OF BACLARAN CHANNEL (PHASE III), PARAÑAQUE CITY22O00060 · ₱96,498,502.06 · mapped
- CONSTRUCTION OF REVETMENT WALL/SHEET PILING OF BACLARAN CHANNEL (PHASE II), PARAÑAQUE CITY22O00059 · ₱96,493,657.95 · mapped
- CONSTRUCTION OF REVETMENT WALL/SHEET PILING OF BACLARAN CHANNEL (PHASE IV), PARAÑAQUE CITY22O00061 · ₱96,458,893.47 · mapped
- UPGRADING OF LONGOS PUMPING STATIONS 1 & 2, BRGY. LOGOS, MALABON CITY17O00020 · ₱96,422,308.52 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG ZAPOTE RIVER TRIBUTARIES, LAS PINAS CITY19OI0062 · ₱96,398,455.25 · mapped
- UPGRADING OF ABUCAY PUMPING STATION, MANILA21O00125 · ₱95,926,567.17 · mapped
- UPGRADING OF LONGOS PUMPING STATIONS 1 AND 2 (PHASE 2), MALABON CITY18O00029 · ₱95,159,516.06 · mapped
- Construction (Completion) of Flood Control Structure along Laguna Lake, Barangay Alabang, Muntinlupa City22OI0051 · ₱92,634,372.43 · mapped
- Construction of Flood Control Structure, Aplaya, Barangay Poblacion, Muntinlupa City22OI0045 · ₱92,570,039.77 · mapped
- CONST./REHAB. OF FLOOD CONTROL STRUCTURES & IMPVT (SLOPE PROTECTION) ALONG ZAPOTE RIVER & ITS TRIBUT17OI0145 · ₱92,204,982.59 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ZAPOTE RIVER, LAS PINAS CITY24OI0043 · ₱91,918,217.64 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES, ROAD AND OTHER IMPROVEMENTS, MOLINO RIVER, BRGY MOLINO 4, BACOOR, CAVITE (PHASE 1)23D00162 · ₱91,697,810.75 · mapped
- Construction of Flood Control Structure along Laguna de Bay, Barangay Putatan, Muntinlupa City22OI0049 · ₱91,568,484.81 · mapped
- Construction (Completion) of Flood Control Structure along Laguna Lake, Barangay Cupang, Muntinlupa City22OI0060 · ₱91,567,097.47 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
