CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND OTHER IMPROVEMENTS AT BACOOR SIDE, ZAPOTE RIVER UPSTREAM, (DAANG HARI TO AMORE BACOOR SIDE), BACOOR, CAVITE
CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND OTHER IMPROVEMENTS AT BACOOR SIDE, ZAPOTE RIVER UPSTREAM, (DAANG HARI TO AMORE BACOOR SIDE), BACOOR, CAVITE is a DPWH-tracked public work in Region IV-A, Region IV-A. Reported contract value: ₱144,782,963.79. Status: Past target date (DPWH On-Going). Contractor on record: E F CHUA CONST INC. Figures trace to dpwh.
Total Contract Cost





