| CONSTRUCTION OF GENERAL TRIAS RETARDING BASIN I (RIO GRANDE RIVER) UNDER THE FLOOD RISK MANAGEMENT FOR YLANG-YLANG RIVER AND RIO GRANDE RIVER IN THE PROVINCE OF CAVITE INCLUDING ROW | Flood Control Management Cluster | ₱934.0M | 99% reported progress | R U AQUINO CONST AND DEVELOPMENT CORP FO | 181 | Check in |
| DESIGN AND BUILD OF COASTAL DIKE AND DRAINAGE IMPROVEMENT, CATBALOGAN CITY, SAMAR | Flood Control Management Cluster | ₱744.4M | 87% reported progress | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 37 | Check in |
| CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY, DRAINAGE SYSTEM, CATBALOGAN CITY, INCLUDING ANTIAO RIVER CONTROL, SAMAR PROVINCE | Flood Control Management Cluster | ₱445.3M | Reported complete | MSB VITUG CONST | 37 | Check in |
| LOCAL ROADS AND BRIDGES, LOCAL ROADS CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF BATANGAS ACCESS ZONE - WEST SIDE, BATANGAS CITY, SAN PASCUAL AND BAUAN, BATANGAS | Region IV-A | ₱442.9M | Reported complete | TCSC CORP | 121 | Check in |
| CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY DRAINAGE SYSTEM, CATBALOGAN CITY INCLUDING ANTIAO RIVER CONTROL, SAMAR | Flood Control Management Cluster | ₱438.8M | Reported complete | MSB VITUG CONST | 37 | Check in |
| CONSTRUCTION OF FLOOD CONTROL ALONG SIBALOM RIVER, SIBALOM. ANTIQUE | Region VI | ₱358.0M | 47% reported progress | MAC BUILDERS CORP FORMERLY: MAC BUILDERS DEVELOPMENT CORP | 180 | Check in |
| CONSTRUCTION OF GENERAL TRIAS RETARDING BASIN II (YLANG-YLANG RIVER) UNDER THE FLOOD RISK MANAGEMENT FOR YLANG-YLANG RIVER AND RIO CHICO GRANDE RIVER IN THE PROVINCE OF CAVITE INCLUDING ROW | Flood Control Management Cluster | ₱350.2M | 96% reported progress | MSB VITUG CONST | 186 | Check in |
| CONSTRUCTION OF FLOODGATES NUMBER 3 AND NUMBER 4 ALONG NAVOTAS COASTAL DIKE, NAVOTAS CITY | Flood Control Management Cluster | ₱328.1M | 81% reported progress | PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP | 178 | Check in |
| SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, SECTION 3.14B, TACLOBAN CITY, LEYTE | Region VIII | ₱313.0M | 0% reported progress | L N R CONST | 95 | Check in |
| SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, SECTION 3.14A, TACLOBAN CITY, LEYTE | Region VIII | ₱313.0M | 0% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 95 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD AND CAUSEWAY, BRGY. CAMBAJAO-BRGY. ALIBAGON, CAJIDIOCAN, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱297.0M | 90% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 3 | Check in |
| 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BURABUD-AN, ABUYOG, LEYTE; 2. CONSTRUCTION OF FLOOD CONTROL STRUCTURE CADAC-AN RIVER, BARANGAY PAGSANG-AN, ABUYOG, LEYTE | Region VIII | ₱294.9M | Reported complete | JUCONS CONST OPC FORMERLY:JUCONS CONST &SUPPLY | 154 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE MUMPONG RIVER, TUBAN-BATONG BUHAY, BRGY. TUBAN, SABLAYAN, OCC. MINDORO | Region IV-B | ₱291.8M | 38% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 12 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, MUMPONG RIVER, TUBAN-STA. LUCIA, BRGY. TUBAN, SABLAYAN, OCC. MINDORO | Region IV-B | ₱291.5M | 37% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 11 | Check in |
| CONSTRUCTION OF FLOOD CONTROL ALONG ZAPOTE RIVER AND ITS TRIBUTARIES (UPSTREAM), LAS PINAS CITY | Las Piñas-Muntinlupa DEO | ₱289.5M | Reported complete | E F CHUA CONST INC | 187 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG CARMEN PORT, SAN AGUSTIN, ROMBLON | Region IV-B | ₱289.5M | Reported complete | LEGACY CONST CORP FORMERLY: LEGACY CONST | 19 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG SAN JOSE PORT, ROMBLON | Region IV-B | ₱289.5M | 57% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 45 | Check in |
| Construction of Dubduban Flood Control Structure, San Agustin, Tablas Island Romblon | ALCANTARA (ROMBLON), ROMBLON | ₱289.5M | Reported complete | LEGACY CONST CORP FORMERLY: LEGACY CONST | 14 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MONGPONG, BRGY. STA. LUCIA, SABLAYAN, OCC. MINDORO | Region IV-B | ₱289.5M | Reported complete | LEGACY CONST CORP FORMERLY: LEGACY CONST | 5 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD AND CAUSEWAY FOR TOURISM ALONG AZAGRA PORT, CAJIDIOCAN, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱289.5M | Reported complete | ST TIMOTHY CONST CORP | 8 | Check in |
| Construction of Flood Control Structure (River Training Works) along Mompong River (Downstream), Sablayan, Occidental Mindoro | SABLAYAN (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO | ₱289.5M | Reported complete | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 5 | Check in |
| CLUSTER 12: CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, ORIENTAL MINDORO, 12.1: CONST. OF BALITE R/C, BRGY. MALAMIG SECT., STA. 0+000-STA. 0+308.60; 12.2: CONST. OF CAWACAT R/C, TABUK SECT., BULALACAO, STA.0+000-STA. 0+324.3; 1 | Region IV-B | ₱289.5M | 62% reported progress | ST TIMOTHY CONST CORP | 41 | Check in |
| Construction of Road Dike/Esplanade along Pangalaan River (Left Side), Naujan, Oriental Mindoro | NAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱289.5M | Reported complete | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 67 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG CAJIDIOCAN PORT, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱289.5M | Reported complete | ST TIMOTHY CONST CORP | 3 | Check in |
| Construction of Road Dike/Esplanade along Sitio Anduyanan, Paluan, Occidental Mindoro | PALUAN (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO | ₱289.5M | Reported complete | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 71 | Check in |
| Construction of Paluan Shore Protection and Causeway Development, Sitio Ipol Section, Occidental Mindoro | PALUAN (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO | ₱289.5M | Reported complete | D T RECIO INC | 70 | Check in |
| SUSTAINABLE INFRASTUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY FOR TOURISM ALONG AMBULONG PORT, MAGDIWANG, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱289.5M | Reported complete | ST PIUS CONST AND SUPPLY | 14 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG POBLACION SAN FERNANDO, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱289.5M | Reported complete | ST TIMOTHY CONST CORP | 6 | Check in |
| Construction of River Control Structure along Pagpagoha River, Upstream, Tablas Island, Romblon | SAN ANDRES (ROMBLON), ROMBLON | ₱289.5M | Reported complete | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 7 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG SABLAYAN PORT, ROMBLON, ROMBLON | Region IV-B | ₱289.5M | Reported complete | ST PIUS CONST AND SUPPLY | 9 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES(OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-CONSTRUCTION OF ROAD,MIISI-BONGA-BUYUAN-LIDONG-DARAGA,DARAGA/ | Region V | ₱288.5M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 107 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. TAGUMPAY, PHASE I, NAUJAN, OR. MINDORO | Region IV-B | ₱287.2M | 86% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 58 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG PATRICK RIVER, BRGY. VICTORIA SECTION, PHASE III, SABLAYAN, OCC. MINDORO | Region IV-B | ₱287.1M | 85% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 25 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG RIVER, SITIO KULI-KULI SECTION (RS), ARMADO, STA. 000+234-STA. 000+900, ABRA DE IL | Region IV-B | ₱284.3M | 30% reported progress | D T RECIO INC | 62 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. CENTRAL-BRGY. SAN AGUSTIN, STA. 000+240-STA. 000+735.5 (LEFT SIDE), SAN JOSE, OCC. MIND | Region IV-B | ₱284.2M | 65% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 17 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. BATASAN, STA. 000+000-STA. 000+473.35, SAN JOSE, OCC. MINDORO | Region IV-B | ₱284.2M | 65% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 12 | Check in |
| CONSTRUCTION/IMPROVEMENT/UPGRADING OF FLOOD CONTROL ALONG SAN FRANCISCO RIVER, POLANGUI-OAS, ALBAY, POLANGUI, ALBAY 3RD LEGISLATIVE DISTRICT | Region V | ₱281.5M | Reported complete | PHILWORKS CONST | 115 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)IMUS-BACOOR LINK ROAD, PACKAGE 2, BACOOR, CAVITE | Region IV-A | ₱280.7M | 11% reported progress | I&E CONST CORP FORMERLY: I&E CONSTR | 190 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)IMUS-BACOOR LINK ROAD, PACKAGE 1, BACOOR, CAVITE | Region IV-A | ₱280.7M | 14% reported progress | I&E CONST CORP FORMERLY: I&E CONSTR | 190 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-REHABILITATION OF REVETMENT ALONG SAN FRANCISCO RIVER, UPSTREAM OF PONSO STEEL BR | Region V | ₱280.3M | Reported complete | PHILWORKS CONST | 116 | Check in |
| SUSTAINABLE INFRASTRUCTURE POJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG UBI RIVER, BRGY. TAGUMPAY, PHASE V, NAUJAN, OR. MINDORO | Region IV-B | ₱280.2M | 91% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 61 | Check in |
| SUISTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG PATRICK RIVER, BRGY. VICTORIA SECTION, PHASE I, SABLAYAN, OCC. MINDORO | Region IV-B | ₱280.2M | 84% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 25 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG DULANGAN RIVER, BRGY. EVANGELISTA, PHASE I, NAUJAN, ORIENTAL MINDORO | Region IV-B | ₱280.1M | 78% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 70 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING M,AJOR/STRATEGIC PUBLIC BUILDINGS/FCILITIES- CONST. OF ROAD DIKE ALONG M,AG-ASAWANG TUBIG RIVER, BRGY. TAGUMPAY, PHASE III, NAUJAN, ORIENTAL MINDORO | Region IV-B | ₱280.1M | 89% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 60 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILUITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. INARAWAN, PHASE IV, NAUJAN, OR. MINDORO | Region IV-B | ₱279.9M | 86% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 64 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. TAGUMPAY, PJHASE IV, NAUJAN, ORIENTAL MINDORO | Region IV-B | ₱279.9M | 88% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 61 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRIC | Region V | ₱279.8M | Reported complete | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 121 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD (CIRCUMFERENTIAL ROAD)IN SUPPORT OF AGRIC | Region V | ₱279.8M | Reported complete | G C I CONST AND DEV'T CORP | 120 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRIC | Region V | ₱279.8M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 121 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD DIKE ALONG PATRICK RIVER, BRGY. TAGUMPAY SECTION, PHASE II, SABLAYAN, OCC. MINDORO | Region IV-B | ₱279.7M | 92% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 24 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. TAGUMPAY, PHASE II, NAUJAN, OR. MINDORO | Region IV-B | ₱279.7M | 87% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 60 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG PATRICK RIVER, BRGY. VICTORIA SECTION, PHASE II, SABLAYAN, OCC. MINDORO | Region IV-B | ₱279.6M | 86% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 25 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY.INARAWAN, PHASE II, NAUJAN, OR. MINORTO | Region IV-B | ₱279.4M | 78% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 62 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROADS/BOULEVARD & CAUSEWAY FOR TOURISM ALONG STA. FE PORT, TABLAS ISLAND, ROMBLON | Region IV-B | ₱279.4M | 89% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 34 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP[AG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. INARAWAN, PHASE I, NAUJAN, ORIENTAL MINDORO | Region IV-B | ₱279.4M | 82% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 62 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. INARAWAN, PHASE III, NAUJAN, OR. MINDORO | Region IV-B | ₱279.2M | 78% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 63 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG PATRICK RIVER, BRGY. TAGUMPAY SECTION, PHASE I, SABLAYAN, OCC. MINDORO | Region IV-B | ₱278.8M | 94% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 25 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PATRICK RIVER, SITIO MANAMOK, BRGY. TAGUMPAY, SABLAYAN, OCC. MINDORO | Region IV-B | ₱277.8M | 37% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 25 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PATRICK RIVER, OLD TAGUMPAY, BRGY. TAGUMPAY, SABLAYAN, OCC. MINDORO | Region IV-B | ₱277.5M | 37% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 25 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BRGY. SAN AGUSTIN (UPSTREAM), SAN JOSE, OCC. MINDORO | Region IV-B | ₱276.6M | 61% reported progress | D T RECIO INC | 23 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BRGY. SAN AGUSTIN (DOWNSTREAM), SAN JOSE, OCC. MINDORO | Region IV-B | ₱276.4M | 59% reported progress | D T RECIO INC | 23 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIVER, (LEFT SIDE), BRGY. SAMPAGUITA, NAUJAN, OR. MINDORO | Region IV-B | ₱276.2M | 24% reported progress | LE BRON CONST | 70 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (DOWNSTREAM LS), PACKAGE C, NAUJAN, OR. MINDORO | Region IV-B | ₱276.1M | 30% reported progress | ANORE CONST | 71 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, (UPSTREAM), BRGY. MULAWIN-BRGY. DEL PILAR, NAUJAN, | Region IV-B | ₱276.0M | 32% reported progress | HGG BUILDERS | 67 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (LS), PACKAGE B, NAUJAN, OR. MINDORO | Region IV-B | ₱276.0M | 24% reported progress | ANORE CONST | 71 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. APITONG SECTION (DOWNSTREAM LS), NAUJAN, OR. MINDORO | Region IV-B | ₱275.8M | 61% reported progress | RAYMAN BUILDERS INC | 64 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BRGY. ADELA (DOWNSTREAM), RIZAL, OCC.MINDORO | Region IV-B | ₱275.8M | 60% reported progress | D T RECIO INC | 24 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DFIKE, PANGALAAN RIVER, DOWNSTREAM (RIGHT SIDE), PACKAGE A, NAUJAN, OR. MINDORO | Region IV-B | ₱275.7M | 79% reported progress | RAYMAN BUILDERS INC | 72 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. APITONG SECTION (UPSTREAM LS), NAUJAN, OR. MINDORO | Region IV-B | ₱275.6M | 60% reported progress | RAYMAN BUILDERS INC | 64 | Check in |
| REHABILITATION OF FLOOD CONTROL, PAGSANGA-AN RIVER, ORMOC CITY | Region VIII | ₱274.3M | 65% reported progress | E M CUERPO INC | 120 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 4+780.00 - STATION 5+480, SECTION 5 PHASE 11, BRGY. STA. CRUZ, TANAUAN, LEYTE | Region VIII | ₱265.3M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 107 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 1+900 - STATION 2+550, SECTION 5 PHASE 9, BRGY. SAN JOAQUIN, PALO, LEYTE | Region VIII | ₱263.4M | Reported complete | WTG CONST | 105 | Check in |
| WIDENING OF BRIDGE - SIBALOM BR. (B00123PN) ALONG ILOILO - ANTIQUE RD | Region VI | ₱259.4M | Reported complete | ADVANCED FOUNDATION CONST SYSTEMS CORP | 187 | Check in |
| Construction of Road Dike along Bucayao River (East Side), Sitio Malaya Section, Barangay Tagumpay, Naujan, Oriental Mindoro | NAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱247.5M | Reported complete | ST TIMOTHY CONST CORP | 59 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRUCTURE, TINGARAY RIVER, UPSTREAM R/S, BRGY. POBLACION, FERROL, ROMBLON | Region IV-B | ₱247.5M | 93% reported progress | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 15 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRTUCTURE, TINGARAY | Region IV-B | ₱247.5M | 94% reported progress | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 15 | Check in |
| Construction of Road Dike along Bucayao River (East Side), Sitio Malinao Section, Barangay Tagumpay, Naujan, Oriental Mindoro | NAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱247.5M | Reported complete | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 58 | Check in |
| BASIC INFRASTRUCTURE PROGRAM- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROAD DIKE, BRY. DULANGAN, PTO. GALERA, ORIENTAL MINDORO | Region IV-B | ₱247.5M | 69% reported progress | NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST | 87 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF LIGAYA-STA. LUCIA COASTAL ROAD (STA. LUCIA SECTION), SABLAYAN, OCC. MINDORO | Region IV-B | ₱247.5M | 79% reported progress | ANORE CONST | 2 | Check in |
| Construction of Road Dike aling Mag-asawang Tubig River, Sampaloc Section, Barangay Sto. Niño, Naujan, Oriental Mindoro | NAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱247.5M | Reported complete | RAYMAN BUILDERS INC | 68 | Check in |
| Construction of Road Dike along Mag-asawang Tubig River, Dayapan Section, Barangay Sto. Niño, Naujan, Oriental Mindoro | NAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱247.5M | Reported complete | RAYMAN BUILDERS INC | 68 | Check in |
| Construction of slope protection, road and other improvements along river in Molino III and Barangay Molino VI, Bacoor City, Cavite | CAVITE | ₱244.1M | Reported complete | E F CHUA CONST INC | 187 | Check in |
| CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BALUCTOT RIVER, EAST SIDE, BRGY. SALAWAG, DASMARIÑAS, CAVITE | Region IV-A | ₱241.4M | 90% reported progress | SILVERWOLVES CONST CORP | 180 | Check in |
| CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BALUCTOT RIVER, EAST SIDE, BRGY. PALIPARAN III, DASMARIÑAS, CAVITE (PHASE I) | Region IV-A | ₱241.4M | 92% reported progress | SILVERWOLVES CONST CORP | 179 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BAAO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRIC | Region V | ₱241.2M | 90% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 131 | Check in |
| Construction of Baao Lakeshore Dike Road (Circumferential Road) in Support of Agriculture and Fishing Industry (Package 3), Baao, Camarines Sur | BAAO (CAMARINES SUR), CAMARINES SUR | ₱241.2M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 132 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF GASAN SHORE PROTECTION/BOULEVARD, GASAN, MARINDUQUE | Region IV-B | ₱241.2M | 87% reported progress | SARGASSO CONST | 91 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONSTRUCTION OF TUGDAN CAUSEWAY, ALCANTARA, TABLAS ISLAND, ROMBLON | Region IV-B | ₱241.2M | Reported complete | LEGACY CONST CORP FORMERLY: LEGACY CONST | 14 | Check in |
| Construction of Flood Control Structure along Libtangin River, Barangay Mangiliol Section, Gasan, Marinduque | GASAN (MARINDUQUE), MARINDUQUE | ₱241.2M | Reported complete | HGG BUILDERS & SUPPLY | 91 | Check in |
| CONSTRUCTION OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES AND CHANNELIZATION, FATIMA, DULAG, LEYTE 2ND LD, DULAG, LEYTE | Region VIII | ₱241.2M | Reported complete | EZJONES CONST INC | 128 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES ALONG BALETE RIVER, PHASE 2, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | ₱241.2M | 71% reported progress | EIGHT J'S CONST SERVICES | 41 | Check in |
| SUSTAINABLE INFRASTCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLI BUILDINGS/FACILITIES- CONST. OF TABLAS EAST COAST BOULEVARD, SANTA MARIA, TABLAS ISLAND, ROMBLON | Region IV-B | ₱241.2M | Reported complete | LEGACY CONST CORP FORMERLY: LEGACY CONST | 6 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, PHASE 1, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | ₱241.2M | 76% reported progress | NEW RICH GEN CONTRACTOR SERVICES & TRADING CO INC | 41 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE, GLORIA, OR. MINDORIO | Region IV-B | ₱241.2M | 82% reported progress | EIGHT J'S CONST SERVICES | 41 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE - BRGY. PAPANDUNGIN, GLORIA, ORIENTAL MINDORO | Region IV-B | ₱241.2M | 81% reported progress | EIGHT J'S CONST SERVICES | 41 | Check in |
| Construction of Flood Control Structure along Abra de Ilog River, Sitio Kuli-Kuli Section, Armado, Abra de Ilog, Occidental Mindoro | ABRA DE ILOG (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO | ₱241.2M | Reported complete | GOLDEN J'S CONST SERVICES | 62 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG PAGBAHAN RIVER, PHASE 1, BRGY. SAN VICENTE, SANTA CRUZ, OC | Region IV-B | ₱241.2M | Reported complete | SILVERWOLVES CONST CORP | 51 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF MOGPOG SHORE PROTECTION/BOULEVARD, MOGPOG, MARINDUQUE | Region IV-B | ₱241.2M | 74% reported progress | HGG BUILDERS | 111 | Check in |
| Construction of Road Dike/Esplanade along Pangalaan River (Right Side), Naujan, Oriental Mindoro | NAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱241.2M | Reported complete | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 69 | Check in |
| Construction of Road Dike/Esplanade along Sitio Katanlawan, Paluan, Occidental Mindoro | PALUAN (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO | ₱241.2M | Reported complete | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 70 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG PAGBAHAN RIVER, PHASE 2, BRGY. SAN VICENTE, SANTA CRUZ, OC | Region IV-B | ₱241.2M | Reported complete | SILVERWOLVES CONST CORP | 51 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURE PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF RIVER CONTROL STRUCTURE ALONG MAYHA-TULAY RIVER, ODIONGAN, ROMBLON | Region IV-B | ₱241.2M | 83% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 10 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY ALONG BRGY. CARMEN SECTION, SAN AGUSTIN, TABLAS ISLAND, ROMBLON | Region IV-B | ₱241.2M | 87% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 20 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONSTRUCTION OF COASTAL ROAD, PHASE 2, STA. FE, TABLAS ISLAND, ROMBLON | Region IV-B | ₱241.2M | 93% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 34 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITH MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG RIVER, PERLAS SECTION, WAWA, ABRA DE ILOG, OCC. MINDORO | Region IV-B | ₱241.2M | 83% reported progress | ST TIMOTHY CONST CORP | 81 | Check in |
| Construction of Paluan Shore Protection and Causeway Development, Sitio Malugao Section, Occidental Mindoro | PALUAN (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO | ₱241.2M | Reported complete | D T RECIO INC | 70 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF DUBDUBAN FLOOD CONTROL STRUCTURE (DOWNSTREAM), SAN AGUSTIN, TABLAS ISLAND, ROMBLON | Region IV-B | ₱241.2M | 82% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 14 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF DUBDUBAN FLOOD CONTROL STRUCTURE (UPSTREAM), SAN AGUSTIN, TABLAS ISLAND, ROMBLON | Region IV-B | ₱241.2M | 87% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 14 | Check in |
| Construction of Flood Control Structure along Abra de Ilog River, Cabacao Section, Abra de Ilog, Occidental Mindoro | ABRA DE ILOG (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO | ₱241.2M | Reported complete | GOLDEN J'S CONST SERVICES | 65 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF STA. CRUZ SHORE PROTECTION, SANTA CRUZ, MARINDUQUE | Region IV-B | ₱239.9M | 63% reported progress | HGG BUILDERS | 110 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PHASE 1, BRGY. MULAWIN, NAUJAN, OR. MINDORO | Region IV-B | ₱239.3M | 35% reported progress | HGG BUILDERS | 67 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 2+550 - STATION 3+180, SECTION 5 PHASE 10, BRGY. SAN JOAQUIN, PALO, LEYTE | Region VIII | ₱239.0M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 105 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF BUENAVISTA SHORE PROTECTION, BUENAVISTA, MARINDUQUE | Region IV-B | ₱238.9M | 87% reported progress | SARGASSO CONST | 86 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ILVITA RIVERBANK PROTECTION WORKS ALONG AMNAY RIVER (DOWNSTREAM), SABLAYAN, OCC. MINDORO | Region IV-B | ₱238.3M | 80% reported progress | ANORE CONST | 28 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG DULANGAN RIVER, BRGY. CANUBING II (DOWNSTREAM), STA. 000+320-STA. 000+613.90, CALAPAN, OR. MINDORO | Region IV-B | ₱237.0M | 52% reported progress | ADSL CONST & TRADING | 73 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADFE ALONG PATRICK RIVER (UPSTREAM), BRGY. SAN FRANCISCO-BRGY. PAETAN SECTION, STA. 000+668.34-STA. 001+000 ( | Region IV-B | ₱236.9M | 9% reported progress | SILVERWOLVES CONST CORP | 26 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG DULANGAN RIVER, BRGY. CANUBING II, STA. 000+000-STA. 000+305.50, CALAPAN, OR. MINDORO | Region IV-B | ₱236.9M | 38% reported progress | ADSL CONST & TRADING | 73 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG PATRICK RIVER (UPSTREAM), BRGY. PAETAN-BRGY. TAGUMPAY, STA.01+010-STA. 001+335.99 (LEFT SIDE), SAB | Region IV-B | ₱236.9M | 64% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 26 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF RIVERBANK PROTECTION WORKS ALONG LABANGAN RIVER (UPSTREAM), BRGY. MURTHA, STA. 000+000-STA. 000+465.82, SAN JOSE, OCC. MINDOR | Region IV-B | ₱236.9M | 71% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 20 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC B UILDINGS/FACILITIES- CONST. OF RIVERBANK PROTECTION WORKS ALONG LABANGAN RIVER (DOWNSTREAM), BRGY. MURTHA, STA. 000+480-STA. 000+921.80, SAN JOSE, OCC. MIN | Region IV-B | ₱236.9M | 71% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 21 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG PATRICK RIVER (DOWNSTREAM), BRGY. PAETAN-BRG. TAGUMPAY, STA. 001+345-STA. 001+639.06 (LEFT SIDE), S | Region IV-B | ₱236.9M | 62% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 26 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY ALONG BRGY. AMBULONG SECTION, MAGDIWANG, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱236.4M | Reported complete | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 14 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM ALONG BANGON RIVER, PHASE 3, BARANGAY SAN JOSE, PALO, LEYTE | Region VIII | ₱236.2M | 20% reported progress | EZJONES CONST INC | 103 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM), PHASE 2, TACLOBAN CITY | Region VIII | ₱236.1M | 31% reported progress | EZJONES CONST INC | 87 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE, BALETE RIVER, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | ₱236.1M | 71% reported progress | ALRIE CONST SERVICES | 41 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SEAWALL WITH FLOOD CONTROL DIKE, BARANGAY BATAN, | Region V | ₱235.9M | 77% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 114 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BAAO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRIC | Region V | ₱235.7M | 87% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 132 | Check in |
| CLUSTER II-ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-II-A: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DRAINAGE, BATO, CATANDUANES; II-B: CONSTRUCT | Catanduanes DEO | ₱235.3M | 0% reported progress | G C I CONST AND DEV'T CORP | 158 | Check in |
| CONSTRUCTION OF REVETMENT ALONG MALAKING ILOG RIVER, DOWNSTREAM, PHASE 2, SAN JUAN, BATANGAS | Region IV-A | ₱235.2M | 0% reported progress | STRUKTURA TEKNIKA SERVICES CO | 137 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PHASE 2, BRGY. SAN LUIS, NAUJAN, OR. MINDOR | Region IV-B | ₱234.3M | 87% reported progress | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 65 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY PAGSANGAHAN, BA | Region V | ₱234.0M | 89% reported progress | NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST | 190 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY MATOOGTOOG AND BARANGAY | Region V | ₱234.0M | 84% reported progress | BRENTMIN ROOFING ENT | 188 | Check in |
| CLUSTER 1: 1. CONSTRUCTION OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE A). SITIO BAGANG, BRGY. CABACUNGAN, DULAG, LEYTE 2. CONSTRUCTION (EXTENSION) OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE A), BRGY. FATIMA, DULAG, LEYTE | Region VIII | ₱233.5M | Reported complete | EZJONES CONST INC | 128 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD DIKE/ESPLANADE ALONG BUSUANGA RIVER, BRGY. AGUAS, RIZAL, OCC. MINDO | Region IV-B | ₱232.8M | 88% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 12 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG BUSUANGA RIVER, BRGY. PITOGO, RIZAL, OCC. MINDOR | Region IV-B | ₱232.8M | 82% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 14 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURE PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF TORRIJOS SHORE PROTECTION STRUCTURE, BRGY. POBLACION, TORRIJOS, MARINDUQUE | Region IV-B | ₱232.8M | 89% reported progress | HGG BUILDERS | 95 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF STA. CRUZ SEAWALL, BRGY. MORALES SECTION, STA. CRUZ, MARINDUQUE | Region IV-B | ₱232.8M | 70% reported progress | HGG BUILDERS | 111 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROAD/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SANTA CRUZ SEAWALL, BRGY. TAGUM-BGRY. MORALES SECTION, STA. CRUZ, MARINDUQUE | Region IV-B | ₱232.8M | 91% reported progress | HGG BUILDERS | 110 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF BUENAVISTA SHORE PROTECTION STRUCTURE, BRGY. TUNGIB-LIPATA, BUENAVISTA, MARINDUQUE | Region IV-B | ₱232.7M | 90% reported progress | HGG BUILDERS | 82 | Check in |
| FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG, SITIO KALINYAWAN SECTION, SAN VICENTE, ABRA DE ILOG, OCC. MINDORO | Region IV-B | ₱232.6M | 72% reported progress | ANORE CONST | 72 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. SAN PEDRO (DOWNSTREAM), SAN JOSE, OC | Region IV-B | ₱232.4M | 90% reported progress | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 23 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PHASE I, BRGY. SAN LUIS, NAUJAN, OR. MINDOR | Region IV-B | ₱232.4M | 82% reported progress | NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST | 65 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. ADELA, SAN JOSE, OCC. MINDORO | Region IV-B | ₱232.4M | 85% reported progress | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 24 | Check in |
| CONSTRUCTION OF FLOODGATES NUMBER 5 AND NUMBER 6 ALONG NAVOTAS COASTAL DIKE, NAVOTAS CITY | Flood Control Management Cluster | ₱231.6M | 82% reported progress | HALREY CONST INC | 178 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, BONGABONG RIVER, BRGY. LISAP-BRGY. BATANGAN (UPSTREAM), STA. 000+330-STA. 000+649.50, BONGABONG, OR. MINDOR | Region IV-B | ₱231.5M | 28% reported progress | JJPR CONST SERVICES | 11 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES, MOMPONG RIVER, BRGY. SANTA LUCIA (UPSTREAM-RS), SABLAYAN, OCC. MINDORO | Region IV-B | ₱231.3M | 30% reported progress | ANORE CONST | 6 | Check in |
| CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG BALITE RIVER, BRGY. PAPANDUNGIN (UPSTREAM-LS), GLORIA, OR. MINDORO | Region IV-B | ₱231.2M | 0% reported progress | GOLDEN J'S CONST SERVICES | 41 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, BONGABONG RIVER, BRGY. LISAP-BRGY. BATANGAN (DOWNSTREAM), STA. 000+680-STA. 000+995.85, BONGABONG, O. | Region IV-B | ₱231.1M | 45% reported progress | JIIK CONST SERVICES | 11 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE WITH ESPLANADE ALONG POLA RIVER, BRGY. LUMANGBAYAN SECTION (UPSTREAM/LS), STA. CRUZ, OCC. MINDORO | Region IV-B | ₱231.1M | 60% reported progress | D T RECIO INC | 38 | Check in |
| CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG BALITE RIVER, BRGY. PAPANDUNGIN (DOWNSTREAM-LS), GLORIA, OR. MINDORO | Region IV-B | ₱231.0M | 0% reported progress | GOLDEN J'S CONST SERVICES | 41 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE WITH ESPLANADE ALONG POLA RIVER, BRGY. LUMANGBAYAN SECTION (DOWNSTREAM/LS), STA. CRUZ, OCC. MINDORO | Region IV-B | ₱231.0M | 60% reported progress | D T RECIO INC | 38 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, MOMPONG RIVER,BRGY. STA. LUCIA, SABLAYAN, OCC. MINDORO | Region IV-B | ₱230.2M | 61% reported progress | ANORE CONST | 5 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BANSUD RIVER, BRGY. CONRAZON, BANSUD, OR. MINDORO | Region IV-B | ₱230.1M | 59% reported progress | LE BRON CONST | 31 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, RIGHT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO | Region IV-B | ₱230.1M | 46% reported progress | ALRIE CONST SERVICES | 41 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERSIDE PROTECTION STRUCTURE, PILI RIVER, UPSTREAM, POBLACION, SAN FERNANDO, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱230.1M | 90% reported progress | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 4 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER DOWNSTREAM, GLORIA, OR. MINDORO | Region IV-B | ₱230.1M | 78% reported progress | JIIK CONST SERVICES | 41 | Check in |
| CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (L/S), PALUAN, OCC. MINDORO | Region IV-B | ₱230.1M | 43% reported progress | ANORE CONST | 69 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIVER, BRGY. SAMPAGUITA, PHASE 2, NAUJAN, OR. MINDORO | Region IV-B | ₱230.0M | 25% reported progress | LE BRON CONST | 71 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (DOWNSTREAM, RIGHT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO | Region IV-B | ₱230.0M | 43% reported progress | JIIK CONST SERVICES | 41 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, LEFT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO | Region IV-B | ₱230.0M | 45% reported progress | ALRIE CONST SERVICES | 41 | Check in |
| CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG PALUAN RIVER, BRGY. SAN JOSE POBLACION (BRGY. 6) SECTION (R/S), PALUAN, OCC. MINDORO | Region IV-B | ₱230.0M | 42% reported progress | ANORE CONST | 69 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BANSUD RIVER BRGY. CONRAZON (UPSTREAM), BANSUD, OR. MINDORO | Region IV-B | ₱230.0M | 61% reported progress | LE BRON CONST | 31 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, (DOWNSTREAM), BRGY. MULAWIN-BRGY. DEL PILAR, NAUJAN, OR. MINDORO | Region IV-B | ₱230.0M | 34% reported progress | HGG BUILDERS | 67 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BONGABONG RIVER, BONGABONG, OR. MINDORO | Region IV-B | ₱229.9M | 42% reported progress | JJPR CONST SERVICES | 11 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN-BRGY. SAMPAGUITA (UPSTREAM), PACKAGE A, NAUJAN, OR. MINDORO | Region IV-B | ₱229.9M | 70% reported progress | RAYMAN BUILDERS INC | 72 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN-BRGY. SAMPAGUITA, PACKAGE B, NAUJAN, OR. MINDORO | Region IV-B | ₱229.9M | 25% reported progress | RAYMAN BUILDERS INC | 72 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BONGABONG RIVER UPSTREAM, BONGABONG, OR. MINDORO | Region IV-B | ₱229.8M | 32% reported progress | JJPR CONST SERVICES | 11 | Check in |
| FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF RIVERSIDE PROTECTION STRUCTURE, DOWNSTREAM, BRGY. PUNONG, SAN FERNANDO, ROMBLON | Region IV-B | ₱229.8M | 88% reported progress | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 1 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. SAMPAGUITA (DOWNSTREAM), NAUJAN, OR. MINDORO | Region IV-B | ₱229.6M | 60% reported progress | RAYMAN BUILDERS INC | 72 | Check in |
| Construction of Basey Tide Embankment, Basey, Samar | SAMAR (WESTERN SAMAR) | ₱227.8M | Reported complete | NORTHERN BUILDERS / RIANNE CONST | 89 | Check in |
| Construction of Basey Tide Embankment, Basey, Samar | SAMAR (WESTERN SAMAR) | ₱227.8M | Reported complete | NORTHERN BUILDERS / RIANNE CONST | 89 | Check in |
| Construction of Basey Tide Embankment, Basey, Samar | SAMAR (WESTERN SAMAR) | ₱227.8M | Reported complete | NORTHERN BUILDERS / RIANNE CONST | 89 | Check in |
| CLUSTER 3: 1. CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.8, BARANGAY SAN ROQUE, TANAUAN, LEYTE; 2. CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.9, BARANGAY SAN ROQUE, TANAUAN, LEYTE | Region VIII | ₱226.2M | Reported complete | EZJONES CONST INC | 109 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP AND BRGY. MALAWAAN (DOWNSTREAM), RIZAL, OCC. MINDORO | Region IV-B | ₱225.6M | 85% reported progress | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 15 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROXAS BY-PASS ROAD, ROXAS, OR. MINDORO | Region IV-B | ₱221.9M | 86% reported progress | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 3 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP (UPSTREAM), RIZAL, OCC. MINDORO | Region IV-B | ₱221.9M | 64% reported progress | D T RECIO INC | 15 | Check in |
| Construction of Road Dike/Esplanade along Patrick River, Sablayan, Occidental Mindoro | SABLAYAN (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO | ₱217.1M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 25 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, BOAC RIVER (UPSTREAM-LEFTSIDE), BOAC, MARINDUQUE | Region IV-B | ₱212.6M | 79% reported progress | MONOLITHIC CONST | 104 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONSTRUCTION OF MANSALAY COASTAL ROAD, DEL MUNDO SECTION, MANSALAY, ORIENTAL MINDORO | Region IV-B | ₱212.3M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 4 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BARANGAY BALUD TO BARANGAY STA. ELENA, TANAUAN, LEYTE, LEYTE 1ST LD | Region VIII | ₱212.2M | 94% reported progress | EZJONES CONST INC | 109 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG CARATAO RIVER, BULALACAO, OR. MINDORO | Region IV-B | ₱209.5M | 9% reported progress | G C I CONST AND DEV'T CORP | 27 | Check in |
| SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA./FACILITIES-CONST. OF ROAD DIKE/ESPLANADE ALONG PATRICK RIVER, BRGY. TAGUMPAY SECT., SABLAYAN, OCC. MINDORO | Region IV-B | ₱209.3M | 94% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 25 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SOUTHERN MINDORO COASTAL ROAD, PINAMALAYAN SECTION, PINAMALAYAN, ORIENTAL MINDORO | Region IV-B | ₱207.5M | 85% reported progress | ANORE CONST | 51 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALOGCOG RIVER (UPSTREAM), BARANGAY CALOGCOG TO BARANGAY MOHON TO BARANGAY ATIPOLO, TANAUAN, LEYTE | Region VIII | ₱207.1M | 27% reported progress | EZJONES CONST INC | 108 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, BRGY. MULAWIN (UPSTREAM), NAUJAN, OR. MINDORO | Region IV-B | ₱204.8M | 87% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 65 | Check in |
| CONSTRUCTION OF SEAWALL/ESPLANADE INCLUDING ACCESS ROAD ALONG BARANGAY COMON - SAN PEDRO COASTAL ROAD LEADING TO SAN JOSE PORT AND BEACHES, RESORTS AND SUNSET VIEWING, SAN JOSE, ANTIQUE | Region VI | ₱204.5M | Reported complete | A M ORETA & CO INC 108 | 185 | Check in |
| Construction of Flood Control Structure along Cavillan River Upstream, Bulalacao, Oriental Mindoro | BULALACAO (SAN PEDRO) (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱202.6M | Reported complete | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 22 | Check in |
| Construction of Flood Control Structure (Naujan Seawall), Baragay Estrella Section, Naujan, Oriental Mindoro | NAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱202.6M | Reported complete | ST TIMOTHY CONST CORP | 80 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SOUTHERN MINDORO COASTAL ROAD, BONGABONG, ORIENTAL MINDORO | Region IV-B | ₱200.1M | 90% reported progress | ANORE CONST | 23 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM), TACLOBAN CITY, LEYTE | Region VIII | ₱197.5M | 86% reported progress | EZJONES CONST INC | 87 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BRGY. STA. ELENA, TANAUAN, LEYTE | Region VIII | ₱195.6M | 40% reported progress | EZJONES CONST INC | 111 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD CONTROL STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, BRGY. MULAWIN (DOWNSTREAM), NAUJAN, OR. MINDORO | Region IV-B | ₱195.3M | 93% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 66 | Check in |
| Construction of Flood Control Structure at Lumintao River, Sitio Lumintao, Barangay Malawaan, Sta. 0+000 - Sta. 0+800, Rizal, Occidental Mindoro | RIZAL (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO | ₱193.7M | Reported complete | ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP / D T RECIO INC | 17 | Check in |
| LOCAL PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE / PROTECTION WORKS, CONSTRUCTION/REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG JCT. MSR OLD ZIGZAG RD, QUEZON | Quezon 4th DEO | ₱193.0M | Reported complete | KATHA BUILDERS & SUPPLIES INC | 163 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF ROAD DIKE ALONG HITOMA RIVER, PHASE II, BARANGAY OBI, CARAMORAN, C | Region V | ₱193.0M | 96% reported progress | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 173 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, HICMING, VIRAC, CATANDUANES, VIRAC, | Region V | ₱193.0M | Reported complete | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 157 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION/IMPROVEMENT OF SEAWALL POBLACION-GOGON, RAPU-RAPU, ALBAY (PHASE 2), RAPU-RAP | Region V | ₱193.0M | 95% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 110 | Check in |
| Construction of San Isidro River Control (Downstream) Package 1, San Isidro, Sto. Domingo, Albay | SANTO DOMINGO (LIBOG) (ALBAY), ALBAY | ₱193.0M | Reported complete | TR CONST CORP FOR: TR CONST | 111 | Check in |
| Construction of San Isidro River Control (Downstream) Package 2, San Isidro, Sto. Domingo, Albay | SANTO DOMINGO (LIBOG) (ALBAY), ALBAY | ₱193.0M | Reported complete | TR CONST CORP FOR: TR CONST | 111 | Check in |
| Construction of Flood Control Structure along Bongabong River, barangay Lisap, Bongabong, Oriental Mindoro | BONGABONG (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱193.0M | Reported complete | STX ENT | 59 | Check in |