Flood Control and Drainage25E00165

CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, LEFT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO

CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, LEFT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO is a DPWH-tracked public work in Region IV-B, Region IV-B. Reported contract value: ₱230,007,954.78. Status: Past target date (DPWH On-Going). Contractor on record: ALRIE CONST SERVICES. Figures trace to dpwh.

Region IV-B, Region IV-B
Region: Region IV-B

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2025 GAA. DBM GAA FY2025

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

23 projects · ₱3.0B total · 0 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE, BALETE RIVER, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO

Region IV-B, Region IV-B

2025₱236.1M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. ANILAO, STA. 000+000-STA. 000+354.06 (RIGHT SIDE), BONGABONG, OR. MINDORO

Region IV-B, Region IV-B

2025₱231.2M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. PROPER, TIGUISAN, STA. 000+000-STA. 000+375, BANSUD, OR. MINDORO

Region IV-B, Region IV-B

2025₱231.1M
Past target date (DPWH On-Going)
No sat.

CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, RIGHT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO

Region IV-B, Region IV-B

2025₱230.1M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATIION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0051+870-K0051+959, MARINDUQUE

Region IV-B, Region IV-B

2024₱193.0M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0051+959-K0052+000; K0052+400-K0052+448, MARINDUQUE

Region IV-B, Region IV-B

2024₱193.0M
Past target date (DPWH On-Going)
View all 23 projects →

4. Implementation

Contract Amount

₱230,007,954.78

Progress

Past target date (DPWH On-Going)

Start Date

February 15, 2025

Target End

February 9, 2026

5. Audit