Roads25E00272

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. ANILAO, STA. 000+000-STA. 000+354.06 (RIGHT SIDE), BONGABONG, OR. MINDORO

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. ANILAO, STA. 000+000-STA. 000+354.06 (RIGHT SIDE), BONGABONG, OR. MINDORO is a DPWH-tracked public work in Region IV-B, Region IV-B. Reported contract value: ₱231,173,455.34. Status: Past target date (DPWH On-Going). Contractor on record: ALRIE CONST SERVICES. Figures trace to dpwh.

Region IV-B, Region IV-B
Region: Region IV-B

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2025 GAA. DBM GAA FY2025

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

23 projects · ₱3.0B total · 0 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE, BALETE RIVER, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO

Region IV-B, Region IV-B

2025₱236.1M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. PROPER, TIGUISAN, STA. 000+000-STA. 000+375, BANSUD, OR. MINDORO

Region IV-B, Region IV-B

2025₱231.1M
Past target date (DPWH On-Going)
No sat.

CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, RIGHT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO

Region IV-B, Region IV-B

2025₱230.1M
Past target date (DPWH On-Going)
No sat.

CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, LEFT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO

Region IV-B, Region IV-B

2025₱230.0M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATIION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0051+870-K0051+959, MARINDUQUE

Region IV-B, Region IV-B

2024₱193.0M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0051+959-K0052+000; K0052+400-K0052+448, MARINDUQUE

Region IV-B, Region IV-B

2024₱193.0M
Past target date (DPWH On-Going)
View all 23 projects →

4. Implementation

Contract Amount

₱231,173,455.34

Progress

Past target date (DPWH On-Going)

Start Date

April 6, 2025

Target End

March 31, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.