EIGHT J'S CONST SERVICES is listed as a company organization in Philippine public procurement records on this site, with 142 linked DPWH project(s) totaling about ₱11,800,608,749.91. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
EIGHT J'S CONST SERVICES
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 142
- Total value
- ₱11,800,608,749.91
- Published flags
- 8
- Region
- North Manila DEO · National Capital Region
Licensed officers (PCAB)
- Josefina Prado Rosario · Authorized Managing Officer (PCAB license 41912) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for EIGHT J'S CONST SERVICES — not an accusation or finding of wrongdoing.
Score: 81.10 / 100 · Projects in sample: 142 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 63.9/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 63.9
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 104
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 136
- pastTargetOngoingProjects
- 29
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 95.8/100 · Weight: 21%
- totalProjects
- 142
- componentScore
- 95.8
- terminatedProjects
- 2
- terminationRatePct
- 1.4
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 140
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 98.9/100 · Weight: 11%
- projects
- 142
- componentScore
- 98.9
- flagsPerProject
- 0.04
- publishedV2Flags
- 5
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 142
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 141 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- ASSET PRESERVATION PROGRAM- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS, MOGPOG-BALANACAN PORT ROAD, K0013+516-K0014+943 (INTERMITTENT SECTIONS), MARINDUQUE24E00077 · ₱289,497,405.08 · mapped
- ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- CALAPAN SOUTH ROAD, K0118+235-K0118+485, ORIENTAL MINDORO24E00182 · ₱241,247,962.68 · mapped
- ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- DR. DAMIAN REYES ROAD (BOAC SIDE) , K0016+556-K0016+912, MARINDUQUE24E00137 · ₱241,247,550.93 · mapped
- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES ALONG BALETE RIVER, PHASE 2, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO24E00186 · ₱241,247,403.26 · mapped
- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE, GLORIA, OR. MINDORIO24E00184 · ₱241,247,109.17 · mapped
- FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE - BRGY. PAPANDUNGIN, GLORIA, ORIENTAL MINDORO24E00183 · ₱241,247,065.81 · mapped
- ASSET PRESERVATION ROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0051+602-K0051+691, MARINDUQUE24E00110 · ₱192,998,796.56 · mapped
- ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- CALAPAN SOUTH ROAD, K0118+495-K0119+430 (INTERMITTENT SECTIONS), OR. MINDORO24E00107 · ₱192,997,528.94 · mapped
- ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0051+691-K0051+781, MARINDUQUE24E00111 · ₱192,997,496.31 · mapped
- ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD- K0051+781-K0051+870, MARINDUQUE24E00029 · ₱192,996,368.18 · mapped
- CONSTRUCTION OF RETENTION BASIN, ESTERO DELA REINA, (PHASE XXXIII), TONDO, MANILA CITY25OE0059 · ₱145,753,969.81 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-LIWASANG BONIFACIO WEST OVERPASS (FLYOVER) (B01348LZ), MANILA CITY25OH0093 · ₱145,235,954.84 · mapped
- Installation of Booster Pump at Estero de Magdalena, Soler Section (Package 2a), Tondo, Manila City24OE0036 · ₱144,748,897.00 · mapped
- Installation of Booster Pump at Estero de Magdalena, La Torre St. (Package 1b), Tondo, Manila City24OE0035 · ₱144,747,306.10 · mapped
- REHABILITATION OF QUIAPO PUMPING STATION, MANILA CITY24OE0199 · ₱144,741,818.86 · mapped
- Installation of Booster Pump at Estero de Magdalena, La Torre St. (Package 1a), Tondo, Manila City24OE0034 · ₱144,719,698.20 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - BUENDIA FLY-OVER (B01562LZ) ALONG ROXAS BLVD-GIL PUYAT FLYOVER25OH0105 · ₱143,157,216.34 · mapped
- CONSTRUCTION OF RETARDING BASIN ALONG ESTERO DE SAN MIGUEL, PHASE I, MANILA CITY25OE0065 · ₱142,233,809.25 · mapped
- REHABILITATION OF DRAINAGE WITHIN ZONE 1 TO 67, MANILA CITY (PHASE 2)25OE0050 · ₱142,216,857.03 · mapped
- INSTALLATION OF PUMP ACCESSORIES ALONG ESTERO DE SAN MIGUEL, MANILA CITY25OE0040 · ₱142,144,438.69 · mapped
- CONSTRUCTION OF RETARDING BASIN ALONG ESTERO DE SAN MIGUEL, PHASE II, MANILA CITY25OE0066 · ₱142,097,669.52 · mapped
- CONSTRUCTION OF RETARDING BASIN AT ESTERO DE QUIAPO (PHASE I), MANILA CITY25OE0062 · ₱141,998,913.00 · mapped
- REHABILITATION OF DRAINAGE WITHIN ZONE 1 TO 67, MANILA CITY25OE0047 · ₱141,964,910.16 · mapped
- REHABILITATION OF DRAINAGE WITHIN ZONE 1 TO 67, PHASE 3, MANILA CITY25OE0048 · ₱141,954,677.80 · mapped
- REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 25-40 (PHASE VI), MANILA CITY25OE0176 · ₱141,854,838.36 · mapped
- REHABILITATION OF ROADS WITH DRAINAGE IMPROVEMENT WITHIN ZONE 25-40 (PHASE III), MANILA CITY25OE0080 · ₱141,854,687.48 · mapped
- CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 9, QUEZON CITY24OG0138 · ₱141,822,244.30 · mapped
- CONSTRUCTION OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG SAN JUAN RIVER, PACKAGE 10, QUEZON CITY24OG0139 · ₱141,821,539.90 · mapped
- REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES: AURORA/KATIPUNAN FLYOVER (B03211LZ) ALONG C-5 (KATIPUNAN/AURORA FLYOVER), QUEZON CITY25OG0063 · ₱141,820,139.00 · mapped
- REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES: KATIPUNAN VIADUCT (NB) ALONG C-5 ROAD, QUEZON CITY25OG0140 · ₱141,765,108.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION OF ESTEROS WITHIN ZONE 68-89, MANILA CITY25OH0064 · ₱114,580,854.93 · mapped
- IMPROVEMENT OF ROAD WITH DRAINAGE AT ZONE 58 TO 62, MANILA CITY23OE0091 · ₱96,499,778.32 · mapped
- Construction of Two (2) Pumping Stations along Navotas Coastal Dike, Phase 5, Navotas City22OA0109 · ₱96,499,715.98 · mapped
- Construction of Two (2) Pumping Stations along Navotas Coastal Dike, Phase 4, Navotas City22OA0108 · ₱96,499,355.46 · mapped
- INSTALLATION OF ROAD SAFETY DEVICES (SOLAR LED STREETLIGHTS) ALONG H. LOPEZ BLVD., MANILA23OE0183 · ₱96,499,096.16 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-IMPROVEMENT OF LAGUSNILAD PUMPING STATION, MANILA CITY PHASE 224OH0073 · ₱96,498,757.85 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SLOPE PROTECTION STRUCTURE ALONG ABRA DE ILOG ROAD, LUCUTAN SECTION (PHASE 2), OCC. MINDORO23E00139 · ₱96,497,870.78 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SLOPE PROTECTION STRUCTURE ALONG ABRA DE ILOG ROAD, SUALIN SECTION (PHASE 1), OCC. MINDORO23E00140 · ₱96,497,744.78 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES /FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURE ALONG ABRA DE ILOG ROAD, LUCUTAN SECTION (PHASE 1), OCC. MINDORO23E00138 · ₱96,497,743.85 · mapped
- REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 13 TO 24, MANILA CITY (PHASE 6)24OE0208 · ₱96,497,705.27 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF SLOPE PROTECTION STRUCTURE ALONG ABRA DE ILOG ROAD, SUALIN SECTION (PHASE 2), OCC. MINDORO23E00141 · ₱96,497,590.88 · mapped
- Installation of Booster Pump at Estero dela Reina, Phase X, Tondo, Manila23OE0191 · ₱96,495,792.90 · mapped
- Rehabilitation of Luneta Pumping Station at Katigbak Parkway, Ermita, Manila City - Phase I24OH0025 · ₱96,492,658.53 · mapped
- Rehabilitation of Luneta Pumping Station at Katigbak Parkway, Ermita, Manila City - Phase II24OH0045 · ₱96,490,816.38 · mapped
- REHABILITATION OF ROAD ALONG BLUEMENTRITT EXT., SAMPALOC, MANILA CITY24OE0232 · ₱96,486,258.06 · mapped
- Installation of Booster Pump along Estero dela Reina, CM Recto Ave., (Phase II), Tondo, Manila23OE0021 · ₱96,452,618.46 · mapped
- INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA (PHASE II), MANILA CITY23OE0215 · ₱96,435,278.81 · mapped
- Construction of Flood Control Structure along Lumintao River going to Sitio Cansaliw, New Dagupan, Sta. 0+000 - Sta. 0+865, Calintaan, Occidental Mindoro23EB0037 · ₱96,424,967.48 · mapped
- INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA (PHASE I), MANILA CITY23OE0214 · ₱96,391,184.75 · mapped
- Installation of Booster Pump including Retarding Basin at Estero de Vitas, Barangay 151, Manila City22OE0005 · ₱96,303,461.75 · mapped
Equipment & capacity
PCAB license
- License no.
- 41912
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Apr 11, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 41912); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
19 evaluations listed across 7 GPPB CPES releases; average final rating 93.4% over 10 rated projects; 19 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jul 2, 2025 | DPWH | ₱192,996,565.00 | Completed | 93.9% | 95.2% | 40th, p. 97 |
| Feb 18, 2025 | DPWH | ₱192,998,796.00 | On-going | 96.0% | — | 39th (rev), p. 61 |
| Nov 27, 2024 | DPWH | ₱144,747,306.00 | Completed | 95.1% | 95.1% | 39th (rev), p. 61 |
| Aug 14, 2024 | DPWH (JV) | ₱232,584,053.00 | On-going | 95.9% | — | 38th, p. 74 |
| May 20, 2024 | DPWH | ₱142,582,974.00 | On-going | 95.5% | — | 38th, p. 74 |
| May 14, 2024 | DPWH | ₱96,424,967.00 | Completed | 96.0% | 92.3% | 38th, p. 74 |
| Dec 10, 2023 | DPWH | ₱96,499,096.00 | Completed | 93.4% | 93.4% | 37th, p. 35 |
| Sep 18, 2023 | DPWH | ₱94,573,295.00 | Final | 93.3% | 93.3% | 36th, p. 66 |
| Sep 18, 2023 | DPWH | ₱93,818,961.00 | Final | 94.2% | 94.2% | 36th, p. 66 |
| Sep 5, 2023 | DPWH | ₱96,425,180.00 | On-going | 89.8% | — | 36th, p. 66 |
| Jun 19, 2023 | DPWH | ₱91,669,837.00 | Final | 92.8% | 95.4% | 36th, p. 66 |
| Oct 19, 2022 | DPWH | ₱96,303,462.00 | On-going | 98.2% | — | 35th, p. 52 |
Showing the 12 most recent of 19.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →