Unprogrammed Appropriations 202424OE0208

REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 13 TO 24, MANILA CITY (PHASE 6)

REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 13 TO 24, MANILA CITY (PHASE 6) is a DPWH-tracked public work in North Manila DEO, National Capital Region. Reported contract value: ₱96,497,705.27. Status: Reported complete (DPWH). Contractor on record: EIGHT J'S CONST SERVICES. Figures trace to dpwh.

North Manila DEO, National Capital Region
Region: National Capital Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱12,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱94,675,161 · EIGHT J'S CONSTRUCTION SERVICES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-07-06 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 13 TO 24, MANILA CITY (PHASE 6)

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱12,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Estero de Binondo, Barangay 281, Manila City
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

North Manila DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction Projects

₱94,675,160.90 · EIGHT J'S CONSTRUCTION SERVICES

Contractor

B

142 projects · ₱11.8B total · 8 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION PROGRAM- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS, MOGPOG-BALANACAN PORT ROAD, K0013+516-K0014+943 (INTERMITTENT SECTIONS), MARINDUQUE

Region IV-B, Region IV-B

2024₱289.5M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- CALAPAN SOUTH ROAD, K0118+235-K0118+485, ORIENTAL MINDORO

Region IV-B, Region IV-B

2024₱241.2M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- DR. DAMIAN REYES ROAD (BOAC SIDE) , K0016+556-K0016+912, MARINDUQUE

Region IV-B, Region IV-B

2024₱241.2M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES ALONG BALETE RIVER, PHASE 2, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO

Region IV-B, Region IV-B

2024₱241.2M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE, GLORIA, OR. MINDORIO

Region IV-B, Region IV-B

2024₱241.2M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE - BRGY. PAPANDUNGIN, GLORIA, ORIENTAL MINDORO

Region IV-B, Region IV-B

2024₱241.2M
Past target date (DPWH On-Going)
View all 142 projects →

4. Implementation

Contract Amount

₱96,497,705.27

Progress

Reported complete (DPWH)

Start Date

January 16, 2025

Target End

June 14, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of ManilaTondo I/IIBarangay 259
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.