Flood Control and Drainage25OE0062

CONSTRUCTION OF RETARDING BASIN AT ESTERO DE QUIAPO (PHASE I), MANILA CITY

CONSTRUCTION OF RETARDING BASIN AT ESTERO DE QUIAPO (PHASE I), MANILA CITY is a DPWH-tracked public work in North Manila DEO, National Capital Region. Reported contract value: ₱141,998,913.00. Status: Past target date (DPWH On-Going). Contractor on record: EIGHT J'S CONST SERVICES. Figures trace to dpwh.

North Manila DEO, National Capital Region
Region: National Capital Region

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱15,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱141,998,913 · EIGHT J'S CONSTRUCTION SERVICES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    45% reported · imagery 2023-07-06 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · NCR, City of Manila, First District

Based on the coordinates published with the DPWH record and NOAH file Metro Manila.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF RETARDING BASIN AT ESTERO DE QUIAPO (PHASE I), MANILA CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Estero de Sunog Apog, Barangay 172, Manila City
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

North Manila DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction Projects

₱141,998,913.00 · EIGHT J'S CONSTRUCTION SERVICES

Award / contract ref: 25OE0062

Contractor

B

142 projects · ₱11.8B total · 8 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION PROGRAM- REHAB./RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS, MOGPOG-BALANACAN PORT ROAD, K0013+516-K0014+943 (INTERMITTENT SECTIONS), MARINDUQUE

Region IV-B, Region IV-B

2024₱289.5M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- CALAPAN SOUTH ROAD, K0118+235-K0118+485, ORIENTAL MINDORO

Region IV-B, Region IV-B

2024₱241.2M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- DR. DAMIAN REYES ROAD (BOAC SIDE) , K0016+556-K0016+912, MARINDUQUE

Region IV-B, Region IV-B

2024₱241.2M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES ALONG BALETE RIVER, PHASE 2, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO

Region IV-B, Region IV-B

2024₱241.2M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE, GLORIA, OR. MINDORIO

Region IV-B, Region IV-B

2024₱241.2M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE - BRGY. PAPANDUNGIN, GLORIA, ORIENTAL MINDORO

Region IV-B, Region IV-B

2024₱241.2M
Past target date (DPWH On-Going)
View all 142 projects →

4. Implementation

Contract Amount

₱141,998,913.00

Progress

Past target date (DPWH On-Going)

Start Date

February 14, 2025

Target End

January 27, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of ManilaQuiapoBarangay 384
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Man-Yi 2024Trami 2024Ewiniar 2024
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.