| CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD | Flood Control Management Cluster | ₱942.7M | 12% reported progress | R U AQUINO CONST AND DEVELOPMENT CORP FO | 72 | Check in |
| CONSTRUCTION OF GENERAL TRIAS RETARDING BASIN I (RIO GRANDE RIVER) UNDER THE FLOOD RISK MANAGEMENT FOR YLANG-YLANG RIVER AND RIO GRANDE RIVER IN THE PROVINCE OF CAVITE INCLUDING ROW | Flood Control Management Cluster | ₱934.0M | 99% reported progress | R U AQUINO CONST AND DEVELOPMENT CORP FO | 69 | Check in |
| REHABILITATION OF NAPINDAN HYDRAULIC CONTROL STRUCTURES THROUGH DESIGN AND BUILD SCHEME, BRGY. BUTING, PASIG CITY | Flood Control Management Cluster | ₱849.1M | Reported complete | A M ORETA & CO INC 108 | 61 | Check in |
| DESIGN AND BUILD OF COASTAL DIKE AND DRAINAGE IMPROVEMENT, CATBALOGAN CITY, SAMAR | Flood Control Management Cluster | ₱744.4M | 87% reported progress | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 18 | Check in |
| PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 2 AND 3 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER UPSTREAM OF MARIKINA BRIDGE) STA. 14+100 TO STA. 15+450, LEFT BANK, MARIKINA CITY | Flood Control Management Cluster | ₱714.7M | 91% reported progress | MSB VITUG CONST | 66 | Check in |
| PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 6 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 17+450 TO STA. 18+130, LEFT AND RIGHT BANKS, MARIKINA CITY | Flood Control Management Cluster | ₱689.3M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 67 | Check in |
| PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 8 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 18+650 TO STA. 19+350, LEFT AND RIGHT BANKS, MARIKINA CITY | Flood Control Management Cluster | ₱652.3M | 99% reported progress | R U AQUINO CONST AND DEVELOPMENT CORP FO | 67 | Check in |
| ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST FLOODS: IMPROVEMENT OF WATERWAYS/RETARDING PONDS OF PUMPING STATIONS AT WEST OF MANGGAHAN FLOODWAY, C-6 ROAD, WEST MANGGAHAN RD., TAGUIG CITY, METRO MANILA | National Capital Region | ₱596.9M | Reported complete | PREMIUM MEGASTRUCTURES INC | 72 | Check in |
| ORGANIZATIONAL OUTCOME 2 PROTECT LIVES AND PROPERTIES AGAINST FLOOD: CONSTRUCTION OF MAYTUNAS PUMPING STATION AND IMPROVEMENT OF MAYTUNAS CREEK AND ITS VICINITY, MANDALUYONG CITY | National Capital Region | ₱519.4M | 19% reported progress | PREMIUM MEGASTRUCTURES INC | 72 | Check in |
| PROPOSED MANILA BAY REHABILITATION PROGRAM (DREDGING AND DISPOSAL OF SOLID WASTE OR SLUDGE WASTE USING OCEAN-BASED METHODOLOGY INCLUDING CONSTRUCTION/EXTENSION OF THREE (3) DRAINAGE OUTFALLS) | National Capital Region | ₱502.3M | 95% reported progress | MSB VITUG CONST | 70 | Check in |
| CONSTRUCTION OF FLOOD CONTROL PROTECTION DIKE ALONG MUZON RIVER, MALABON, NAVOTAS-OBANDO SECTION, MALABON CITY | National Capital Region | ₱481.7M | Reported complete | FLORDES CONST & TRADING CORP FORMERLY FLO | 81 | Check in |
| CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY, DRAINAGE SYSTEM, CATBALOGAN CITY, INCLUDING ANTIAO RIVER CONTROL, SAMAR PROVINCE | Flood Control Management Cluster | ₱445.3M | Reported complete | MSB VITUG CONST | 18 | Check in |
| LOCAL ROADS AND BRIDGES, LOCAL ROADS CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF BATANGAS ACCESS ZONE - WEST SIDE, BATANGAS CITY, SAN PASCUAL AND BAUAN, BATANGAS | Region IV-A | ₱442.9M | Reported complete | TCSC CORP | 57 | Check in |
| CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY DRAINAGE SYSTEM, CATBALOGAN CITY INCLUDING ANTIAO RIVER CONTROL, SAMAR | Flood Control Management Cluster | ₱438.8M | Reported complete | MSB VITUG CONST | 18 | Check in |
| UPGRADING OF CATMON PUMPING STATION, MALABON CITY | Flood Control Management Cluster | ₱416.4M | Reported complete | E F CHUA CONST INC | 78 | Check in |
| PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 9 - CONSTRUCTION OF MALANDAY PUMPING STATION AND ASSOCIATED WORKS, MARIKINA CITY | Flood Control Management Cluster | ₱399.5M | 95% reported progress | J D LEGASPI CONST | 66 | Check in |
| METRO MANILA FLOOD MANAGEMENT PROJECT, PHASE I, REHABILITATION WORKS FOR BALUT PUMPING STATION | Flood Control Management Cluster | ₱390.9M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 74 | Check in |
| UPGRADING OF TAPAYAN PUMPING STATION, TAGUIG CITY | Flood Control Management Cluster | ₱389.3M | Reported complete | A M ORETA & CO INC 108 | 56 | Check in |
| UPGRADING OF SPINE PUMPING STATION, NAVOTAS CITY | Flood Control Management Cluster | ₱385.0M | Reported complete | A M ORETA & CO INC 108 | 77 | Check in |
| UPGRADING/REHABILITATION OF NORTH NAVOTAS PUMPING STATION AND REPAIR OF NAVOTAS NAVIGATIONAL GATE (PHASE I) | Flood Control Management Cluster | ₱382.4M | Reported complete | E F CHUA CONST INC | 81 | Check in |
| CONSTRUCTION OF SAN ANDRES PUMPING STATION, MANILA (PHASE 2) | National Capital Region | ₱376.8M | 1% reported progress | E F CHUA CONST INC | 68 | Check in |
| REVETMENT WORKS ALONG MARULAS TUNGTONG CREEK DIVERSION CHANNEL, LAS PIÑAS CITY | Flood Control Management Cluster | ₱351.8M | Reported complete | E F CHUA CONST INC | 63 | Check in |
| CONSTRUCTION OF GENERAL TRIAS RETARDING BASIN II (YLANG-YLANG RIVER) UNDER THE FLOOD RISK MANAGEMENT FOR YLANG-YLANG RIVER AND RIO CHICO GRANDE RIVER IN THE PROVINCE OF CAVITE INCLUDING ROW | Flood Control Management Cluster | ₱350.2M | 96% reported progress | MSB VITUG CONST | 69 | Check in |
| SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, SECTION 3.14B, TACLOBAN CITY, LEYTE | Region VIII | ₱313.0M | 0% reported progress | L N R CONST | 17 | Check in |
| SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, SECTION 3.14A, TACLOBAN CITY, LEYTE | Region VIII | ₱313.0M | 0% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 17 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD AND CAUSEWAY, BRGY. CAMBAJAO-BRGY. ALIBAGON, CAJIDIOCAN, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱297.0M | 90% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 44 | Check in |
| 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BURABUD-AN, ABUYOG, LEYTE; 2. CONSTRUCTION OF FLOOD CONTROL STRUCTURE CADAC-AN RIVER, BARANGAY PAGSANG-AN, ABUYOG, LEYTE | Region VIII | ₱294.9M | Reported complete | JUCONS CONST OPC FORMERLY:JUCONS CONST &SUPPLY | 62 | Check in |
| Construction of Casalogan River Control, Casiguran, Aurora | CASIGURAN (AURORA), AURORA | ₱289.5M | Reported complete | DALCON CONST / EGB CONST CORP FORMERLY: EGB CONST | 82 | Check in |
| CONSTRUCTION OF FLOOD CONTROL ALONG ZAPOTE RIVER AND ITS TRIBUTARIES (UPSTREAM), LAS PINAS CITY | Las Piñas-Muntinlupa DEO | ₱289.5M | Reported complete | E F CHUA CONST INC | 57 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG CARMEN PORT, SAN AGUSTIN, ROMBLON | Region IV-B | ₱289.5M | Reported complete | LEGACY CONST CORP FORMERLY: LEGACY CONST | 64 | Check in |
| Construction of Dubduban Flood Control Structure, San Agustin, Tablas Island Romblon | ALCANTARA (ROMBLON), ROMBLON | ₱289.5M | Reported complete | LEGACY CONST CORP FORMERLY: LEGACY CONST | 68 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD AND CAUSEWAY FOR TOURISM ALONG AZAGRA PORT, CAJIDIOCAN, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱289.5M | Reported complete | ST TIMOTHY CONST CORP | 55 | Check in |
| CLUSTER 12: CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, ORIENTAL MINDORO, 12.1: CONST. OF BALITE R/C, BRGY. MALAMIG SECT., STA. 0+000-STA. 0+308.60; 12.2: CONST. OF CAWACAT R/C, TABUK SECT., BULALACAO, STA.0+000-STA. 0+324.3; 1 | Region IV-B | ₱289.5M | 62% reported progress | ST TIMOTHY CONST CORP | 83 | Check in |
| Construction of Road Dike/Esplanade along Pangalaan River (Left Side), Naujan, Oriental Mindoro | NAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱289.5M | Reported complete | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 76 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG CAJIDIOCAN PORT, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱289.5M | Reported complete | ST TIMOTHY CONST CORP | 43 | Check in |
| SUSTAINABLE INFRASTUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY FOR TOURISM ALONG AMBULONG PORT, MAGDIWANG, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱289.5M | Reported complete | ST PIUS CONST AND SUPPLY | 46 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG POBLACION SAN FERNANDO, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱289.5M | Reported complete | ST TIMOTHY CONST CORP | 55 | Check in |
| Construction of River Control Structure along Pagpagoha River, Upstream, Tablas Island, Romblon | SAN ANDRES (ROMBLON), ROMBLON | ₱289.5M | Reported complete | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 79 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG SABLAYAN PORT, ROMBLON, ROMBLON | Region IV-B | ₱289.5M | Reported complete | ST PIUS CONST AND SUPPLY | 62 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES(OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-CONSTRUCTION OF ROAD,MIISI-BONGA-BUYUAN-LIDONG-DARAGA,DARAGA/ | Region V | ₱288.5M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 84 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. TAGUMPAY, PHASE I, NAUJAN, OR. MINDORO | Region IV-B | ₱287.2M | 86% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 82 | Check in |
| RAISING OF FOLDER DIKE INCLUDING SLOPE PROTECTION WORKS (PHASE 4: STA 2+030 TO STA. 2+530, PHASE 5: STA. 5+720 TO STA. 5+200, PHASE 6) BRGY. DAMPALIT, MALABON CITY | Flood Control Management Cluster | ₱284.5M | 99% reported progress | E M CUERPO INC | 81 | Check in |
| CONSTRUCTION OF CUTCUT PUMPING STATION, PASAY CITY (PHASE 1) | South Manila DEO | ₱283.3M | 8% reported progress | E F CHUA CONST INC | 72 | Check in |
| CONSTRUCTION/IMPROVEMENT/UPGRADING OF FLOOD CONTROL ALONG SAN FRANCISCO RIVER, POLANGUI-OAS, ALBAY, POLANGUI, ALBAY 3RD LEGISLATIVE DISTRICT | Region V | ₱281.5M | Reported complete | PHILWORKS CONST | 85 | Check in |
| REHABILITATION OF NORTH NAVOTAS PUMPING STATION AND NAVOTAS NAVIGATION GATE (PHASE 3), NAVOTAS CITY (RE-ADVERTISEMENT) | National Capital Region | ₱281.2M | 65% reported progress | ANORE CONST | 81 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)IMUS-BACOOR LINK ROAD, PACKAGE 2, BACOOR, CAVITE | Region IV-A | ₱280.7M | 11% reported progress | I&E CONST CORP FORMERLY: I&E CONSTR | 64 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)IMUS-BACOOR LINK ROAD, PACKAGE 1, BACOOR, CAVITE | Region IV-A | ₱280.7M | 14% reported progress | I&E CONST CORP FORMERLY: I&E CONSTR | 65 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-REHABILITATION OF REVETMENT ALONG SAN FRANCISCO RIVER, UPSTREAM OF PONSO STEEL BR | Region V | ₱280.3M | Reported complete | PHILWORKS CONST | 87 | Check in |
| SUSTAINABLE INFRASTRUCTURE POJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG UBI RIVER, BRGY. TAGUMPAY, PHASE V, NAUJAN, OR. MINDORO | Region IV-B | ₱280.2M | 91% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 80 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG DULANGAN RIVER, BRGY. EVANGELISTA, PHASE I, NAUJAN, ORIENTAL MINDORO | Region IV-B | ₱280.1M | 78% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 79 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING M,AJOR/STRATEGIC PUBLIC BUILDINGS/FCILITIES- CONST. OF ROAD DIKE ALONG M,AG-ASAWANG TUBIG RIVER, BRGY. TAGUMPAY, PHASE III, NAUJAN, ORIENTAL MINDORO | Region IV-B | ₱280.1M | 89% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 81 | Check in |
| REVETMENT AND DREDGING WORKS ALONG STA. 14+038 TO STA. 16+050 (TULLAHAN RIVER-LEFT BANK) TULLAHAN BRIDGE, BRGY. TALIPAPA-GOOD WILL HOMES I SUBDIVISION, BRGY. SAN BARTOLOME, QUEZON CITY | Flood Control Management Cluster | ₱280.0M | Reported complete | MSB VITUG CONST | 75 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILUITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. INARAWAN, PHASE IV, NAUJAN, OR. MINDORO | Region IV-B | ₱279.9M | 86% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 79 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. TAGUMPAY, PJHASE IV, NAUJAN, ORIENTAL MINDORO | Region IV-B | ₱279.9M | 88% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 81 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRIC | Region V | ₱279.8M | Reported complete | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 86 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD (CIRCUMFERENTIAL ROAD)IN SUPPORT OF AGRIC | Region V | ₱279.8M | Reported complete | G C I CONST AND DEV'T CORP | 86 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES-CONSTRUCTION OF BATO LAKESHORE DIKE ROAD(CIRCUMFERENTIAL ROAD) IN SUPPORT OF AGRIC | Region V | ₱279.8M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 86 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. TAGUMPAY, PHASE II, NAUJAN, OR. MINDORO | Region IV-B | ₱279.7M | 87% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 81 | Check in |
| PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE II | Flood Control Management Cluster | ₱279.6M | Reported complete | NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST | 54 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY.INARAWAN, PHASE II, NAUJAN, OR. MINORTO | Region IV-B | ₱279.4M | 78% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 79 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIP[AG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. INARAWAN, PHASE I, NAUJAN, ORIENTAL MINDORO | Region IV-B | ₱279.4M | 82% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 80 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, BRGY. INARAWAN, PHASE III, NAUJAN, OR. MINDORO | Region IV-B | ₱279.2M | 78% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 79 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIVER, (LEFT SIDE), BRGY. SAMPAGUITA, NAUJAN, OR. MINDORO | Region IV-B | ₱276.2M | 24% reported progress | LE BRON CONST | 73 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (DOWNSTREAM LS), PACKAGE C, NAUJAN, OR. MINDORO | Region IV-B | ₱276.1M | 30% reported progress | ANORE CONST | 72 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, (UPSTREAM), BRGY. MULAWIN-BRGY. DEL PILAR, NAUJAN, | Region IV-B | ₱276.0M | 32% reported progress | HGG BUILDERS | 78 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN SECTION (LS), PACKAGE B, NAUJAN, OR. MINDORO | Region IV-B | ₱276.0M | 24% reported progress | ANORE CONST | 73 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. APITONG SECTION (DOWNSTREAM LS), NAUJAN, OR. MINDORO | Region IV-B | ₱275.8M | 61% reported progress | RAYMAN BUILDERS INC | 78 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DFIKE, PANGALAAN RIVER, DOWNSTREAM (RIGHT SIDE), PACKAGE A, NAUJAN, OR. MINDORO | Region IV-B | ₱275.7M | 79% reported progress | RAYMAN BUILDERS INC | 71 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. APITONG SECTION (UPSTREAM LS), NAUJAN, OR. MINDORO | Region IV-B | ₱275.6M | 60% reported progress | RAYMAN BUILDERS INC | 78 | Check in |
| REHABILITATION OF FLOOD CONTROL, PAGSANGA-AN RIVER, ORMOC CITY | Region VIII | ₱274.3M | 65% reported progress | E M CUERPO INC | 66 | Check in |
| PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE I | Flood Control Management Cluster | ₱271.0M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 56 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 4+780.00 - STATION 5+480, SECTION 5 PHASE 11, BRGY. STA. CRUZ, TANAUAN, LEYTE | Region VIII | ₱265.3M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 26 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 1+900 - STATION 2+550, SECTION 5 PHASE 9, BRGY. SAN JOAQUIN, PALO, LEYTE | Region VIII | ₱263.4M | Reported complete | WTG CONST | 26 | Check in |
| CONSTRUCTION OF DRAINAGE SYSTEM/OUTFALL EXTENSION AT MANILA BAY | National Capital Region | ₱258.6M | 77% reported progress | PREMIUM MEGASTRUCTURES INC | 69 | Check in |
| UPPER MARIKINA RIVER IMPV'T./REVETMENT WALL,MARIKINA CITY 1ST LD (CONTRACT PACKAGE 3) RIVER IMPV'T. | Flood Control Management Cluster | ₱256.8M | Reported complete | E M CUERPO INC | 66 | Check in |
| CONSTRUCTION OF TWO (2) PUMPING STATION ALONG NAVOTAS COASTAL DIKE (PHASE 6), NAVOTAS CITY | Flood Control Management Cluster | ₱250.9M | Reported complete | MSB VITUG CONST | 79 | Check in |
| Construction of Road Dike along Bucayao River (East Side), Sitio Malaya Section, Barangay Tagumpay, Naujan, Oriental Mindoro | NAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱247.5M | Reported complete | ST TIMOTHY CONST CORP | 83 | Check in |
| Construction of Road Dike along Bucayao River (East Side), Sitio Malinao Section, Barangay Tagumpay, Naujan, Oriental Mindoro | NAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱247.5M | Reported complete | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 83 | Check in |
| BASIC INFRASTRUCTURE PROGRAM- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROAD DIKE, BRY. DULANGAN, PTO. GALERA, ORIENTAL MINDORO | Region IV-B | ₱247.5M | 69% reported progress | NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST | 78 | Check in |
| Construction of Road Dike aling Mag-asawang Tubig River, Sampaloc Section, Barangay Sto. Niño, Naujan, Oriental Mindoro | NAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱247.5M | Reported complete | RAYMAN BUILDERS INC | 74 | Check in |
| Construction of Road Dike along Mag-asawang Tubig River, Dayapan Section, Barangay Sto. Niño, Naujan, Oriental Mindoro | NAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱247.5M | Reported complete | RAYMAN BUILDERS INC | 75 | Check in |
| CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD (PROPOSED INTERCEPTOR ALONG TOCTOCAN ROAD, STA. 0+005.324 - STA. 0+484.093), Q.C. | Flood Control Management Cluster | ₱247.1M | 40% reported progress | R U AQUINO CONST AND DEVELOPMENT CORP FO | 72 | Check in |
| Construction of slope protection, road and other improvements along river in Molino III and Barangay Molino VI, Bacoor City, Cavite | CAVITE | ₱244.1M | Reported complete | E F CHUA CONST INC | 60 | Check in |
| CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BALUCTOT RIVER, EAST SIDE, BRGY. SALAWAG, DASMARIÑAS, CAVITE | Region IV-A | ₱241.4M | 90% reported progress | SILVERWOLVES CONST CORP | 58 | Check in |
| CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BALUCTOT RIVER, EAST SIDE, BRGY. PALIPARAN III, DASMARIÑAS, CAVITE (PHASE I) | Region IV-A | ₱241.4M | 92% reported progress | SILVERWOLVES CONST CORP | 58 | Check in |
| UPGRADING OF MAYPAJO PUMPING STATION, CALOOCAN CITY | Flood Control Management Cluster | ₱241.2M | Reported complete | E F CHUA CONST INC | 76 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF GASAN SHORE PROTECTION/BOULEVARD, GASAN, MARINDUQUE | Region IV-B | ₱241.2M | 87% reported progress | SARGASSO CONST | 18 | Check in |
| Construction of Flood Control Structure along Libtangin River, Barangay Mangiliol Section, Gasan, Marinduque | GASAN (MARINDUQUE), MARINDUQUE | ₱241.2M | Reported complete | HGG BUILDERS & SUPPLY | 18 | Check in |
| CONSTRUCTION OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES AND CHANNELIZATION, FATIMA, DULAG, LEYTE 2ND LD, DULAG, LEYTE | Region VIII | ₱241.2M | Reported complete | EZJONES CONST INC | 42 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES ALONG BALETE RIVER, PHASE 2, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | ₱241.2M | 71% reported progress | EIGHT J'S CONST SERVICES | 77 | Check in |
| SUSTAINABLE INFRASTCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLI BUILDINGS/FACILITIES- CONST. OF TABLAS EAST COAST BOULEVARD, SANTA MARIA, TABLAS ISLAND, ROMBLON | Region IV-B | ₱241.2M | Reported complete | LEGACY CONST CORP FORMERLY: LEGACY CONST | 86 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, PHASE 1, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | ₱241.2M | 76% reported progress | NEW RICH GEN CONTRACTOR SERVICES & TRADING CO INC | 77 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE, GLORIA, OR. MINDORIO | Region IV-B | ₱241.2M | 82% reported progress | EIGHT J'S CONST SERVICES | 76 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, BRGY. BALETE - BRGY. PAPANDUNGIN, GLORIA, ORIENTAL MINDORO | Region IV-B | ₱241.2M | 81% reported progress | EIGHT J'S CONST SERVICES | 77 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF MOGPOG SHORE PROTECTION/BOULEVARD, MOGPOG, MARINDUQUE | Region IV-B | ₱241.2M | 74% reported progress | HGG BUILDERS | 3 | Check in |
| Construction of Road Dike/Esplanade along Pangalaan River (Right Side), Naujan, Oriental Mindoro | NAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱241.2M | Reported complete | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 73 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY ALONG BRGY. CARMEN SECTION, SAN AGUSTIN, TABLAS ISLAND, ROMBLON | Region IV-B | ₱241.2M | 87% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 64 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF DUBDUBAN FLOOD CONTROL STRUCTURE (DOWNSTREAM), SAN AGUSTIN, TABLAS ISLAND, ROMBLON | Region IV-B | ₱241.2M | 82% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 68 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF DUBDUBAN FLOOD CONTROL STRUCTURE (UPSTREAM), SAN AGUSTIN, TABLAS ISLAND, ROMBLON | Region IV-B | ₱241.2M | 87% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 68 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF STA. CRUZ SHORE PROTECTION, SANTA CRUZ, MARINDUQUE | Region IV-B | ₱239.9M | 63% reported progress | HGG BUILDERS | 12 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PHASE 1, BRGY. MULAWIN, NAUJAN, OR. MINDORO | Region IV-B | ₱239.3M | 35% reported progress | HGG BUILDERS | 78 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 2+550 - STATION 3+180, SECTION 5 PHASE 10, BRGY. SAN JOAQUIN, PALO, LEYTE | Region VIII | ₱239.0M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 26 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF BUENAVISTA SHORE PROTECTION, BUENAVISTA, MARINDUQUE | Region IV-B | ₱238.9M | 87% reported progress | SARGASSO CONST | 18 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG DULANGAN RIVER, BRGY. CANUBING II (DOWNSTREAM), STA. 000+320-STA. 000+613.90, CALAPAN, OR. MINDORO | Region IV-B | ₱237.0M | 52% reported progress | ADSL CONST & TRADING | 76 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG DULANGAN RIVER, BRGY. CANUBING II, STA. 000+000-STA. 000+305.50, CALAPAN, OR. MINDORO | Region IV-B | ₱236.9M | 38% reported progress | ADSL CONST & TRADING | 76 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY ALONG BRGY. AMBULONG SECTION, MAGDIWANG, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱236.4M | Reported complete | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 47 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM ALONG BANGON RIVER, PHASE 3, BARANGAY SAN JOSE, PALO, LEYTE | Region VIII | ₱236.2M | 20% reported progress | EZJONES CONST INC | 26 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM), PHASE 2, TACLOBAN CITY | Region VIII | ₱236.1M | 31% reported progress | EZJONES CONST INC | 15 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD CONTROL STRUCTURE, BALETE RIVER, BRGY. PAPANDUNGIN, GLORIA, OR. MINDORO | Region IV-B | ₱236.1M | 71% reported progress | ALRIE CONST SERVICES | 78 | Check in |
| CONSTRUCTION OF TWO (2) FLOODGATES ALONG NAVOTAS COASTAL DIKE, NAVOTAS CITY(CONSTRUCTION OF FLOODGATE NO. 1 AND ELECTRICAL WORKS FOR FLOODGATES NO. 1 AND 2) | Flood Control Management Cluster | ₱235.5M | 0% reported progress | PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP | 79 | Check in |
| CONSTRUCTION OF REVETMENT ALONG MALAKING ILOG RIVER, DOWNSTREAM, PHASE 2, SAN JUAN, BATANGAS | Region IV-A | ₱235.2M | 0% reported progress | STRUKTURA TEKNIKA SERVICES CO | 17 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PHASE 2, BRGY. SAN LUIS, NAUJAN, OR. MINDOR | Region IV-B | ₱234.3M | 87% reported progress | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 79 | Check in |
| Construction of Pumping Station along Veinte Reales, Valenzuela City | CITY OF VALENZUELA (METROPOLITAN MANILA), VALENZUELA CITY | ₱234.0M | Reported complete | TOUGHBUILT CONST & TRADING INC / AKN CONST CORP | 81 | Check in |
| CLUSTER 1: 1. CONSTRUCTION OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE A). SITIO BAGANG, BRGY. CABACUNGAN, DULAG, LEYTE 2. CONSTRUCTION (EXTENSION) OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE A), BRGY. FATIMA, DULAG, LEYTE | Region VIII | ₱233.5M | Reported complete | EZJONES CONST INC | 43 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURE PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF TORRIJOS SHORE PROTECTION STRUCTURE, BRGY. POBLACION, TORRIJOS, MARINDUQUE | Region IV-B | ₱232.8M | 89% reported progress | HGG BUILDERS | 2 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF STA. CRUZ SEAWALL, BRGY. MORALES SECTION, STA. CRUZ, MARINDUQUE | Region IV-B | ₱232.8M | 70% reported progress | HGG BUILDERS | 13 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROAD/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SANTA CRUZ SEAWALL, BRGY. TAGUM-BGRY. MORALES SECTION, STA. CRUZ, MARINDUQUE | Region IV-B | ₱232.8M | 91% reported progress | HGG BUILDERS | 13 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF BUENAVISTA SHORE PROTECTION STRUCTURE, BRGY. TUNGIB-LIPATA, BUENAVISTA, MARINDUQUE | Region IV-B | ₱232.7M | 90% reported progress | HGG BUILDERS | 15 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PHASE I, BRGY. SAN LUIS, NAUJAN, OR. MINDOR | Region IV-B | ₱232.4M | 82% reported progress | NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST | 80 | Check in |
| CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG BALITE RIVER, BRGY. PAPANDUNGIN (UPSTREAM-LS), GLORIA, OR. MINDORO | Region IV-B | ₱231.2M | 0% reported progress | GOLDEN J'S CONST SERVICES | 78 | Check in |
| CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF RIVER CAPACITY ENHANCEMENT STRUCTURE ALONG BALITE RIVER, BRGY. PAPANDUNGIN (DOWNSTREAM-LS), GLORIA, OR. MINDORO | Region IV-B | ₱231.0M | 0% reported progress | GOLDEN J'S CONST SERVICES | 78 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BANSUD RIVER, BRGY. CONRAZON, BANSUD, OR. MINDORO | Region IV-B | ₱230.1M | 59% reported progress | LE BRON CONST | 87 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, RIGHT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO | Region IV-B | ₱230.1M | 46% reported progress | ALRIE CONST SERVICES | 76 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERSIDE PROTECTION STRUCTURE, PILI RIVER, UPSTREAM, POBLACION, SAN FERNANDO, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱230.1M | 90% reported progress | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 54 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER DOWNSTREAM, GLORIA, OR. MINDORO | Region IV-B | ₱230.1M | 78% reported progress | JIIK CONST SERVICES | 77 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG PANGALAAN RIVER, BRGY. SAMPAGUITA, PHASE 2, NAUJAN, OR. MINDORO | Region IV-B | ₱230.0M | 25% reported progress | LE BRON CONST | 72 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (DOWNSTREAM, RIGHT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO | Region IV-B | ₱230.0M | 43% reported progress | JIIK CONST SERVICES | 76 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BALETE RIVER, (UPSTREAM, LEFT SIDE), BRGY. BALETE, GLORIA, OR. MINDORO | Region IV-B | ₱230.0M | 45% reported progress | ALRIE CONST SERVICES | 76 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BANSUD RIVER BRGY. CONRAZON (UPSTREAM), BANSUD, OR. MINDORO | Region IV-B | ₱230.0M | 61% reported progress | LE BRON CONST | 87 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, (DOWNSTREAM), BRGY. MULAWIN-BRGY. DEL PILAR, NAUJAN, OR. MINDORO | Region IV-B | ₱230.0M | 34% reported progress | HGG BUILDERS | 78 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN-BRGY. SAMPAGUITA (UPSTREAM), PACKAGE A, NAUJAN, OR. MINDORO | Region IV-B | ₱229.9M | 70% reported progress | RAYMAN BUILDERS INC | 71 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. TIGKAN-BRGY. SAMPAGUITA, PACKAGE B, NAUJAN, OR. MINDORO | Region IV-B | ₱229.9M | 25% reported progress | RAYMAN BUILDERS INC | 71 | Check in |
| FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF RIVERSIDE PROTECTION STRUCTURE, DOWNSTREAM, BRGY. PUNONG, SAN FERNANDO, ROMBLON | Region IV-B | ₱229.8M | 88% reported progress | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 55 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, PANGALAAN RIVER, BRGY. SAMPAGUITA (DOWNSTREAM), NAUJAN, OR. MINDORO | Region IV-B | ₱229.6M | 60% reported progress | RAYMAN BUILDERS INC | 72 | Check in |
| Construction of Basey Tide Embankment, Basey, Samar | SAMAR (WESTERN SAMAR) | ₱227.8M | Reported complete | NORTHERN BUILDERS / RIANNE CONST | 10 | Check in |
| Construction of Basey Tide Embankment, Basey, Samar | SAMAR (WESTERN SAMAR) | ₱227.8M | Reported complete | NORTHERN BUILDERS / RIANNE CONST | 10 | Check in |
| Construction of Basey Tide Embankment, Basey, Samar | SAMAR (WESTERN SAMAR) | ₱227.8M | Reported complete | NORTHERN BUILDERS / RIANNE CONST | 10 | Check in |
| CLUSTER 3: 1. CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.8, BARANGAY SAN ROQUE, TANAUAN, LEYTE; 2. CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.9, BARANGAY SAN ROQUE, TANAUAN, LEYTE | Region VIII | ₱226.2M | Reported complete | EZJONES CONST INC | 27 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND OTHER IMPROVEMENTS AT BARANGAYS TALON 1 TO TALON 3, LAS PINAS CITY | Las Piñas-Muntinlupa DEO | ₱218.3M | 25% reported progress | I&E CONST CORP FORMERLY: I&E CONSTR | 61 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, BOAC RIVER (UPSTREAM-LEFTSIDE), BOAC, MARINDUQUE | Region IV-B | ₱212.6M | 79% reported progress | MONOLITHIC CONST | 10 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BARANGAY BALUD TO BARANGAY STA. ELENA, TANAUAN, LEYTE, LEYTE 1ST LD | Region VIII | ₱212.2M | 94% reported progress | EZJONES CONST INC | 30 | Check in |
| CONSTRUCTION OF REVETMENT WALL ALONG POLO RIVER, VALENZUELA CITY | Metro Manila 3rd DEO | ₱210.6M | Reported complete | JASA GD 2000 CONST CORP FORMERLY:JASA BUILDER'S | 82 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SOUTHERN MINDORO COASTAL ROAD, PINAMALAYAN SECTION, PINAMALAYAN, ORIENTAL MINDORO | Region IV-B | ₱207.5M | 85% reported progress | ANORE CONST | 68 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALOGCOG RIVER (UPSTREAM), BARANGAY CALOGCOG TO BARANGAY MOHON TO BARANGAY ATIPOLO, TANAUAN, LEYTE | Region VIII | ₱207.1M | 27% reported progress | EZJONES CONST INC | 28 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, BRGY. MULAWIN (UPSTREAM), NAUJAN, OR. MINDORO | Region IV-B | ₱204.8M | 87% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 80 | Check in |
| Construction of Flood Control Structure (Naujan Seawall), Baragay Estrella Section, Naujan, Oriental Mindoro | NAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱202.6M | Reported complete | ST TIMOTHY CONST CORP | 59 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SOUTHERN MINDORO COASTAL ROAD, BONGABONG, ORIENTAL MINDORO | Region IV-B | ₱200.1M | 90% reported progress | ANORE CONST | 90 | Check in |
| Construction of Flood Control River Wall (Road Dike) along Veinte Reales Creek (Right Side Bank), Brgy. Veinte Reales, Valenzuela City | CITY OF VALENZUELA (METROPOLITAN MANILA), VALENZUELA CITY | ₱199.7M | Reported complete | E M CUERPO INC / TOUGHBUILT CONST & TRADING INC | 81 | Check in |
| CONSTRUCTION OF FLOOD CONTROL - ABACAN RIVER DIKING AND SLOPE PROTECTION WORKS, MEXICO, PAMPANGA | Flood Control Management Cluster | ₱198.7M | Reported complete | A D GONZALES JR CONST | 28 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM), TACLOBAN CITY, LEYTE | Region VIII | ₱197.5M | 86% reported progress | EZJONES CONST INC | 15 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BRGY. STA. ELENA, TANAUAN, LEYTE | Region VIII | ₱195.6M | 40% reported progress | EZJONES CONST INC | 32 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD CONTROL STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, BRGY. MULAWIN (DOWNSTREAM), NAUJAN, OR. MINDORO | Region IV-B | ₱195.3M | 93% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 79 | Check in |
| CONSTRUCTION OF REVETMENT ALONG MARIBLO CREEK, STA. 0+010.000 TO STA. 0+524.458 (LEFT AND RIGHT RIVER BANK), QUEZON CITY | Flood Control Management Cluster | ₱195.0M | Reported complete | TRIPLE 8 CONST | 71 | Check in |
| LOCAL PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE / PROTECTION WORKS, CONSTRUCTION/REHABILITATION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG JCT. MSR OLD ZIGZAG RD, QUEZON | Quezon 4th DEO | ₱193.0M | Reported complete | KATHA BUILDERS & SUPPLIES INC | 32 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAN ANTONIO, MADRID, SURIGAO DEL SUR | Region XIII | ₱193.0M | Reported complete | EQUI-PARCO CONST CO | 90 | Check in |
| Construction of San Isidro River Control (Downstream) Package 1, San Isidro, Sto. Domingo, Albay | SANTO DOMINGO (LIBOG) (ALBAY), ALBAY | ₱193.0M | Reported complete | TR CONST CORP FOR: TR CONST | 90 | Check in |
| Construction of San Isidro River Control (Downstream) Package 2, San Isidro, Sto. Domingo, Albay | SANTO DOMINGO (LIBOG) (ALBAY), ALBAY | ₱193.0M | Reported complete | TR CONST CORP FOR: TR CONST | 90 | Check in |
| Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Control Structure along Agos River, Infanta, Quezon (Package A) | INFANTA (QUEZON), QUEZON | ₱193.0M | Reported complete | SILVERWOLVES CONST CORP | 32 | Check in |
| Construction of Flood Control Structure along Bongabong River, barangay Lisap, Bongabong, Oriental Mindoro | BONGABONG (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱193.0M | Reported complete | STX ENT | 83 | Check in |
| Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Control Structure along Agos River, Infanta, Quezon (Package B) | INFANTA (QUEZON), QUEZON | ₱193.0M | Reported complete | SILVERWOLVES CONST CORP | 33 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG PANGALAAN RIVER, PHASE 4, BRGY. SAMPAGUITA, NAUJAN, OR. MI | Region IV-B | ₱193.0M | Reported complete | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 71 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON, (PACKAGE I) | Region IV-A | ₱193.0M | 85% reported progress | SILVERWOLVES CONST CORP | 32 | Check in |
| Construction of Road Dike along Mag-asawang Tubig River, Sitio Dike, Barangay Apitong Section, Naujan, Oriental Mindoro | NAUJAN (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱193.0M | Reported complete | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 75 | Check in |
| CONSTRUCTION OF SLOPE PROTECTION AND LINEAR PARKS ALONG TAGUIG RIVER, BRGY. STA. ANA, TAGUIG CITY | National Capital Region | ₱193.0M | Reported complete | A D GONZALES JR CONST | 58 | Check in |
| CONSTRUCTION OF SLOPE PROTECTION AND LINEAR PARKS ALONG TAGUIG RIVER, BRGY. TUKTUKAN, TAGUIG CITY | National Capital Region | ₱193.0M | Reported complete | ALPHA | 59 | Check in |
| BICOL RIVER BASIN WATERSHED MANAGEMENT PROJECT (FLOOD MITIGATION COMPONENT) - GUINOBATAN AND LIGAO FLOOD CONTROL, ALBAY 3RD LD | Region V | ₱193.0M | Reported complete | WCS CONST INC | 83 | Check in |
| CONSTRUCTION OF SLOPE PROTECTION AND LINEAR PARKS ALONG TAGUIG RIVER, BRGY. USUSAN, TAGUIG CITY | National Capital Region | ₱193.0M | Reported complete | PASCAL CONST | 59 | Check in |
| Construction of Flood Control and Bank Protection StructuresLukutang Malaki River at Sitio Anginan, Barangay San Isidro, Rodriguez, Rizal Package 2 | MONTALBAN (RIZAL), RIZAL | ₱193.0M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 70 | Check in |
| REHABILITATION OF PARANAQUE RIVER MOUTH (PHASE I AND PHASE II), BARANGAY DON GALO, PARANAQUE CITY | National Capital Region | ₱193.0M | 99% reported progress | AKN CONST CORP | 65 | Check in |
| Construction of Flood Control Structure, Ligao City, Albay Phase II | CITY OF LIGAO (ALBAY), ALBAY | ₱192.9M | Reported complete | SANRHO BUILDERS INC FOR SANRHO CONST AND SUPPL / SISBRO CONST CORP FORMERLY: SISBRO CONST & SUPPLY | 85 | Check in |
| OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF NASISI RIVER FLOOD MITIGATION STRUCTURE(BRGY. CAVASI AND BRGY. TOMOL | Region V | ₱192.9M | 96% reported progress | MAKAPA CORP | 81 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DIVINUBO, BORONGAN CITY, EASTERN SAMAR | Region VIII | ₱192.9M | 0% reported progress | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 47 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BARANGAY STA. ELENA (UPSTREAM), TANAUAN, LEYTE | Region VIII | ₱192.9M | 89% reported progress | EZJONES CONST INC | 32 | Check in |
| IMPROVEMENT OF BULI CREEK PUMPING STATION ALONG MANGAHAN FLOODWAY, PASIG CITY | Flood Control Management Cluster | ₱192.8M | Reported complete | L R TIQUI BUILDERS INC | 50 | Check in |
| CONSTRUCTION OF RIVERWALL ALONG DAMPALIT RIVER, BRGY. HULONG DUHAT AND BRGY. DAMPALIT, MALABON CITY | Flood Control Management Cluster | ₱192.8M | Reported complete | A L SALAZAR CONST INC | 79 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAGUNA LAKESHORE AT BGRY. SAN, ANTONIO, MUNICIPALITY OF BAY, LAGUNA | Flood Control Management Cluster | ₱192.8M | Reported complete | 11-16 CONST | 24 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN RIVER, BARANGAY CALINGATNAN - SITIO MINAELI, BORONGAN CITY, EASTERN SAMAR | Region VIII | ₱192.7M | 76% reported progress | HGG BUILDERS & SUPPLY | 44 | Check in |
| Construction of Quinale "A" River Flood Mitigation Structure (Polangui and Libon Section), Polangui, Albay | POLANGUI (ALBAY), ALBAY | ₱192.7M | Reported complete | RAMARPLUS INC FORMERLY RAMAR ENT | 85 | Check in |
| CLUSTER 3: 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BINAHAAN RIVER, BINONGTOAN SECTION, TANAUAN, LEYTE; 2. CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BINAHAAN RIVER, GUINGAUAN SECTION, TANAUAN, LEYTE | Region VIII | ₱192.5M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 35 | Check in |
| SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SEAWALL PROTECTION ALONG THE SHORELINES OF BRGY. STO, NIÑO, BARANGAY STA. FE, AND BARANGAY VICTORY, ABUYOG, LEYTE | Region VIII | ₱192.5M | 92% reported progress | JUCONS CONST OPC FORMERLY:JUCONS CONST &SUPPLY | 58 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BATANG - BARANGAY GARAWON, HERNANI, EASTERN SAMAR | Region VIII | ₱192.4M | 85% reported progress | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 30 | Check in |
| CONSTRUCTION OF FLOOD CONTROL AND SLOPE PROTECTION STRUCTURES ALONG LUKUTANG MALAKI RIVER, BARANGAY SAN ISIDRO, RODRIGUEZ, RIZAL PACKAGE 3 | Region IV-A | ₱192.2M | 69% reported progress | PREMIUM MEGASTRUCTURES INC | 71 | Check in |
| Construction of Pantao Storm Surge Protection along Poblacion, Libon, Albay | ALBAY | ₱192.1M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 68 | Check in |
| UPGRADING OF SANTIBAÑEZ PUMPING STATION, PACO, MANILA | Flood Control Management Cluster | ₱192.0M | Reported complete | J D LEGASPI CONST | 70 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY SAN PABLO, TAFT, EASTERN SAMAR | Region VIII | ₱191.9M | 84% reported progress | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 61 | Check in |
| FLOOD CONTROL PROJECT BASED ON FLOOD MASTER PLAN FOR METRO MANILA AND SORROUNDING AREAS, ZAPOTE RIVE | Las Piñas-Muntinlupa DEO | ₱191.4M | Reported complete | J D LEGASPI CONST | 65 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANGON RIVER (UPSTREAM), BARANGAY LIBERTAD, PALO, LEYTE | Region VIII | ₱191.3M | 47% reported progress | LEDA CONST INC | 26 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANGON RIVER (DOWNSTREAM), BARANGAY LIBERTAD, PALO, LEYTE | Region VIII | ₱191.3M | 55% reported progress | LEDA CONST INC | 26 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY HINOLASO, DOLORES, EASTERN SAMAR | Region VIII | ₱190.9M | 67% reported progress | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 73 | Check in |
| Construction of Flood Control, Brgy. Belen, Leyte, Leyte | LEYTE (LEYTE), LEYTE | ₱190.9M | Reported complete | EZJONES CONST INC / JGO BUILDERS | 45 | Check in |
| INSTALLATION OF NEW UNIT PUMPS WITH FLOOD GATE AT WAWANG PULO PUMPING STATION WITH CONSTRUCTION OF PUMP HOUSE, BARANGAY WAWANG PULO, VALENZUELA CITY | Metro Manila 3rd DEO | ₱190.5M | 49% reported progress | J SIMEON CONST | 85 | Check in |
| INSTALLATION OF NEW UNIT PUMPS WITH FLOOD GATE AT COLOONG PUMPING STATION WITH CONSTRUCTION OF PUMP HOUSE AT BARANGAY COLOONG, VALENZUELA CITY | Metro Manila 3rd DEO | ₱190.5M | 29% reported progress | MRB11 CONST CORP FORMERLY:MRB CONS | 85 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARIKINA RIVER, BARANGAY BATASAN HILLS, QUEZON CITY | Quezon City 1st DEO | ₱190.4M | 97% reported progress | A L SALAZAR CONST INC | 68 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT UPPER MARIKINA RIVER FROM BRGY. SAN JOSE GOING TO BRGY. BALITE (PHASE 1), RODRIGUEZ, RIZAL | Flood Control Management Cluster | ₱190.3M | 98% reported progress | 11-16 CONST | 70 | Check in |
| CONSTRUCTION OF FLOOD CONTROL ANDBANK PROTECTION STRUCTURES ALONGLUKUTANG MALAKI RIVER, BARANGAY SANISIDRO, RODRIGUEZ, RIZAL - PACKAGE 1 | Region IV-A | ₱190.1M | 81% reported progress | PREMIUM MEGASTRUCTURES INC | 70 | Check in |
| CONSTRUCTION OF TOLOSA TIDE EMBANKMENT, PHASE 1, BARANGAY TELEGRAFO, TOLOSA, LEYTE | Region VIII | ₱189.4M | 1% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 32 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF ROAD DIKE, BUDIAO, DARAGA, ALBAY (PACKAGE 2), DARAGA, ALBAY ( | Region V | ₱189.2M | 0% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 81 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MIISI GULLY, PAC | Region V | ₱189.1M | 16% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 84 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MIISI GULLY, PAC | Region V | ₱189.1M | 6% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 84 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARIKINA RIVER, BARANGAY BATASAN HILLS, QUEZON CITY | Quezon City 1st DEO | ₱189.1M | 40% reported progress | A L SALAZAR CONST INC | 68 | Check in |