J SIMEON CONST is listed as a company organization in Philippine public procurement records on this site, with 176 linked DPWH project(s) totaling about ₱9,509,944,314.27. Recorded delivery grade B (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
J SIMEON CONST
BRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 176
- Total value
- ₱9,509,944,314.27
- Published flags
- 5
- Region
- Metro Manila 3rd DEO · National Capital Region
Online presence
Google Maps: J. Simeon ConstructionGoogle Maps, 2026-10-22
174, McArthur Highway, Marulas, Valenzuela, 1440 Metro Manila
Licensed officers (PCAB)
- Jessie King Simeon · Authorized Managing Officer (PCAB license 31867) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for J SIMEON CONST — not an accusation or finding of wrongdoing.
Score: 83.50 / 100 · Projects in sample: 176 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 67/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 67
- lateCompletedProjects
- 44
- onTimeCompletedProjects
- 108
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 173
- pastTargetOngoingProjects
- 21
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 176
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 176
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.5/100 · Weight: 11%
- projects
- 176
- componentScore
- 99.5
- flagsPerProject
- 0.02
- publishedV2Flags
- 3
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 176
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
50 geotagged project(s) — Open full map
- CONSTRUCTION OF LEGISLATIVE AND PEOPLE'S BUILDING VALENZUELA CITY HALL, KARUHATAN, VALENZUELA CITY21OD0133 · ₱334,860,629.87 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, LAON, VEINTE REALES, VALENZUELA CITY (SHFC)24OD0280 · ₱292,243,645.70 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, (DEPED BUILDING) MALINTA, VALENZUELA CITY24OD0281 · ₱219,407,067.94 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (RESSETLEMENT PROGRAM FOR ISFS), VALENZUELA CITY25OD0340 · ₱191,200,130.32 · mapped
- INSTALLATION OF NEW UNIT PUMPS WITH FLOOD GATE AT WAWANG PULO PUMPING STATION WITH CONSTRUCTION OF PUMP HOUSE, BARANGAY WAWANG PULO, VALENZUELA CITY25OD0217 · ₱190,499,759.72 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. PASO DE BLAS, VALENZUELA CITY23OD0231 · ₱190,101,349.62 · mapped
- CONSTRUCTION OF LEGISLATIVE BUILDING & PEOPLES BUILDING (PHASE II) VALENZUELA CITY HALL, BRGY. KARUHATAN, VALENZUELA CITY23OD0229 · ₱157,798,760.73 · mapped
- CONSTRUCTION (COMPLETION) OF PAMANTASAN NG LUNGSOD NG VALENZUELA (SATELLITE BUILDING), BARANGAY MALINTA, VALENZUELA CITY21OD0130 · ₱148,727,315.46 · mapped
- Construction of Slope Protection Structure along C-6 Open Channel, (Phase 3), Taguig City24OB0189 · ₱141,854,632.50 · mapped
- Construction of Slope Protection Structure along C-6 Open Channel, (Phase 1), Taguig City24OB0187 · ₱141,811,101.20 · mapped
- Construction of Slope Protection Structure along C-6 Open Channel, (Phase 2), Taguig City24OB0188 · ₱141,782,110.50 · mapped
- CONSTRUCTION OF LEGISLATIVE BUILDING, BRGY. KARUHATAN, VALENZUELA CITY (PHASE II)25OD0358 · ₱114,563,401.55 · mapped
- CONSTRUCTION OF MULTI-PURPOSE FACILITY, (ANCILLARY/ POWERHOUSE FOR LEGISLATIVE BUILDING), BARANGAY KARUHATAN, VALENZUELA CITY25OD0346 · ₱107,254,649.41 · mapped
- REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG LABANGAN CHANNEL IBA O'ESTE (STA. 01+500 - STA. 02+280, STA. 02+508 - STA. 02+645.20) CALUMPIT, BULACAN20CC0107 · ₱104,966,216.51 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATING STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES: CONSTRUCTION OF BANICA RIVER CONTROL, BRGY. NORTHERN JUNOB, DUMAGUETE CITY23HK0095 · ₱99,000,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE /FACILITIES: CONSTRUCTION OF BANILAD TO CANTIL-E RIVER CONTROL, DUMAGUETE CITY, NEGROS ORIENTAL23HK0097 · ₱99,000,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES: CONSTRUCTION OF BANICA RIVER CONTROL, BRGY. BATINGUEL, DUMAGUETE CITY, NEGROS ORIENTAL23HK0094 · ₱99,000,000.00 · mapped
- CONSTRUCTION OF RIVER PROTECTION STRUCTURE ALONG MALITLIT WATERWAYS (NEAR RIVERBEND HOMES), STA. ROSA CITY, LAGUNA (PHASE 1)24DI0118 · ₱98,998,508.00 · mapped
- CONSTRUCTION OF RIVER PROTECTION STRUCTURE ALONG STA. ROSA RIVER, (NEAR STA. ROSA-BINAN BOUNDARY BRIDGE), STA. ROSA SIDE, STA. ROSA CITY LAGUNA (PHASE 1)25DI0102 · ₱97,134,409.50 · mapped
- REHABILITATION OF FLOOD CONTROL PHASE 1 ALONG BRGY. SANTO DOMINGO, STA. ROSA, LAGUNA25DI0103 · ₱97,121,295.90 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER CONTROL, MAGATAS, SIBULAN, NEGROS ORIENTAL23HK0081 · ₱96,500,000.00 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER CONTROL, BRGY. SAN JOSE, TANJAY CITY, NEGROS ORIENTAL23HK0083 · ₱96,500,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SHORE PROTECTION, BARANGAY LOOC, DUMAGUETE CITY,24HK0108 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF RIVER CONTROL SYSTEM AND REHABILITATION OF WATERWAYS ALONG BALAGTAS RIVER BRGY. PANGINAY BALAGTAS, BULACAN (STA. 15+538 TO STA. 15+742)23CC0546 · ₱96,499,880.39 · mapped
- Construction of Riverbank Protection Structure along Angat River, Barangay Cambaog, Bustos, Bulacan24CC0078 · ₱96,499,726.23 · mapped
- CONSTRUCTION OF PAMANTASAN NG LUNGSOD NG VALENZUELA SATELLITE BUILDING, BRGY. MALINTA, VALENZUELA CITY20OD0212 · ₱96,427,400.54 · mapped
- CONSTRUCTION OF RIVER PROTECTION STRUCTURE NEAR SOUTH LUZON EXPRESSWAY (SLEX) MALITLIT BRIDGE, STA. ROSA CITY, LAGUNA (PHASE II)24DI0117 · ₱96,281,589.00 · mapped
- CONSTRUCTION OF RIVER PROTECTION STRUCTURE NEAR SOUTH LUZON EXPRESSWAY (SLEX) MALITLIT BRIDGE, STA. ROSA CITY, LAGUNA (PHASE 1)24DI0116 · ₱96,277,500.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY MALINTA, VALENZUELA CITY25OD0341 · ₱95,586,088.32 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG C-6 OPEN CHANNEL (PHASE 17), TAGUIG CITY25OB0127 · ₱94,569,609.26 · mapped
- Construction of Slope Protection along C-6 Open Channel (Phase 11), Taguig City24OB0171 · ₱94,569,472.40 · mapped
- CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS B SERRANO ST - K0010 + (-330) - K0010 + 106525OD0034 · ₱94,482,662.95 · mapped
- Construction of Reinforced Concrete Box Culvert along 8th Street, Caloocan City24OD0029 · ₱94,183,044.21 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 10), VALENZUELA CITY24OD0083 · ₱94,085,134.61 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 11), VALENZUELA CITY24OD0084 · ₱94,081,471.09 · mapped
- Constuction of Flood Control Wall along Meycauyan River, Barangay Bignay, Valenzuela City21OD0132 · ₱94,052,821.99 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS MACARTHUR H-WAY - K0013 + 441 - K0013 + 925, K0013 + 941 - K0014 + 363, VALENZUELA CITY22OD0115 · ₱92,069,074.48 · mapped
- CONSTRUCTION OF FLOOD CONTROL RIVER WALL ALONG LEFT BANK OF ISLA CREEK, BRGY. PASOLO, VALENZUELA CITY20OD0039 · ₱90,784,319.60 · mapped
- CONSTRUCTION OF FLOOD CONTROL RIVER WALL ALONG LONGOS CREEK STA. 0+468 TO STA. 0+933, BRGY. MALANDAY, VALENZUELA CITY20OD0076 · ₱90,781,022.28 · mapped
- CONSTRUCTION OF FLOOD CONTROL RIVER WALL ALONG LONGOS CREEK STA.0+000 TO STA. 0+468, BRGY. MALANDAY, VALENZUELA CITY20OD0037 · ₱90,768,063.56 · mapped
- Construction of Slope Protection along Pinagsama River, Taguig City (Phase 4)24OB0216 · ₱90,709,571.71 · mapped
- Construction of Slope Protection along Pinagsama River, Taguig City (Phase 3)24OB0215 · ₱90,685,600.66 · mapped
- Improvement of Flood Control River Wall along Left Bank of Polo River, Barangay Wawang Pulo, Valenzuela City22OD0043 · ₱89,832,638.99 · mapped
- Improvement of Flood Control River Wall along Polo River, Barangay Tagalag, Valenzuela City22OD0042 · ₱89,830,037.30 · mapped
- DREDGING OF MEYCAUAYAN RIVER, WAWANG POLO SIDE, STA. 1+260 TO STA.1+810, VALENZUELA CITY18OD0080 · ₱88,326,681.13 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 3), VALENZUELA CITY23OD0096 · ₱86,850,000.00 · mapped
- CONSTRUCTION OF REVETMENT AT PAOMBONG, PROVINCE OF BULACAN PAOMBONG, BULACAN20CC0108 · ₱84,459,341.54 · mapped
- CONSTRUCTION (COMPLETION) OF OUT PATIENT DEPARTMENT (OPD) WITH SEWERAGE TREATMENT PLANT (STP), BRGY. DALANDANAN, VALENZUELA CITY25OD0177 · ₱82,756,930.27 · mapped
- CONSTRUCTION OF ROAD AND DRAINAGE AT COLOONG, VALENZUELA CITY22OD0199 · ₱80,870,412.81 · mapped
- CONSTRUCTION OF COLOONG ROAD, BARANGAY COLOONG, VALENZUELA CITY22OD0198 · ₱80,820,130.70 · mapped
