A M ORETA & CO INC 108 is listed as a company organization in Philippine public procurement records on this site, with 36 linked DPWH project(s) totaling about ₱6,588,731,197.40. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
A M ORETA & CO INC 108
CGrade by Love the Philippines based on public DPWH project records. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 36
- Total value
- ₱6,588,731,197.40
- Published flags
- 0
- Region
- Region VI · Region VI
Public Record Grade
A transparent, data-derived summary of reported public records for A M ORETA & CO INC 108 — not an accusation or finding of wrongdoing.
Score: 72.70 / 100 · Projects in sample: 36 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 50/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 50
- lateCompletedProjects
- 4
- onTimeCompletedProjects
- 20
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 34
- pastTargetOngoingProjects
- 10
- undatedCompletedProjectsExcluded
- 1
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 36
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 36
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 36
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 36
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
29 geotagged projects — Open full map
- REHABILITATION OF NAPINDAN HYDRAULIC CONTROL STRUCTURES THROUGH DESIGN AND BUILD SCHEME, BRGY. BUTING, PASIG CITY17Z00011 · ₱849,082,121.32 · mapped
- UPGRADING OF TAPAYAN PUMPING STATION, TAGUIG CITY22O00068 · ₱389,286,169.78 · mapped
- UPGRADING OF SPINE PUMPING STATION, NAVOTAS CITY18Z00031 · ₱385,000,002.58 · mapped
- FLOOD RISK MANGEMENT PROJECT FOR CAGAYAN DE ORO RIVER (FRIMP-CDOR), JICA LOAN NO. PH-P259, CONTRACT PACKAGE 1 (BONBON-KAUSWAGAN)18Z00027 · ₱371,066,673.84 · mapped
- CONSTRUCTION OF GRAVEL ROAD - PANAY EAST-WEST ROAD, INCLUDING BRIDGE AND RROW, ANTIQUE17G00068 · ₱349,796,277.60
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES-PANGLAO-TAGBILARAN CITY OFFSHORE BRIDGE CONNECTOR, STA.1+878.140-STA.2+623.194, BOHOL PROVINC18H00047 · ₱333,517,776.45 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADSGENERAL AGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST ROAD), SILANG - AMADEO SECTION, PACKAGE 1, CAVITE25D00211 · ₱330,992,532.16
- CONSTRUCTION OF ILOILO RIVER NORTH BANK ROAD, SECTION 2, ILOILO CITY, ILOILO21G00135 · ₱289,499,884.96 · mapped
- OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - POBLACION - BAGUNOT BRIDGE, BAGGAO, CAGAYAN24B00072 · ₱218,259,609.04 · mapped
- CONSTRUCTION OF SEAWALL/ESPLANADE INCLUDING ACCESS ROAD ALONG BARANGAY COMON - SAN PEDRO COASTAL ROAD LEADING TO SAN JOSE PORT AND BEACHES, RESORTS AND SUNSET VIEWING, SAN JOSE, ANTIQUE18G00073 · ₱204,491,774.28 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF LEVEL III WATER SYSTEM, MADRIDEJOS, CEBU24H00175 · ₱197,699,842.35 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BACOLOD CITY GENERAL HOSPITAL, BRGY. VISTA ALEGRE, BACOLOD CITY, NEGROS OCCIDENTAL22G00151 · ₱193,000,000.00 · mapped
- CONSTRUCTION OF GRAVEL ROAD - CONSTRUCTION OF PANDAN - IBAJAY ROAD, PANDAN, ANTIQUE19G00055 · ₱192,999,976.10 · mapped
- SAN REMEGIO - BUGO - GEN. FULLON VALDERRAMA ROAD, ANTIQUE18G00062 · ₱182,799,795.23 · mapped
- CONSTRUCTION OF GRAVEL ROAD - SAN REMEGIO - BUGO - GEN. FULLON ROAD17G00071 · ₱172,432,495.01
- PM4-07: ASPHALT OVERLAY OF ILOILO-CAPIZ ROAD (OLD ROUTE) K076+700 K088+814, CAPIZ, REGION VI15Z00041 · ₱159,000,888.88 · mapped
- PANAY EAST-WEST ROAD (ANTIQUE SECTION), ANTIQUE18G00052 · ₱137,455,652.98 · mapped
- PANAY EAST - WEST ROAD (ILOILO SECTION), ILOILO18G00055 · ₱135,625,454.69 · mapped
- ILOILO CIRCUMFERENTIAL ROAD 3 INCL. ROW, ILOILO18G00077 · ₱125,500,017.63 · mapped
- ORGANIZATIONAL OUTCOME 2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS /FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM CONSTRUCTION OF FLOOD CONTROL STRUCTURE/SHORE PROTECTION AT POBLACION, SIQUIJOR20H00033 · ₱123,519,226.19 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE, TALIBON, BOHOL23HC0092 · ₱96,499,999.06 · mapped
- CONSTRUCTION OF FLYOVER - JIBAO-AN FLYOVER, BRGY. JIBAO-AN NORTE, MANDURRIAO, ILOILO CITY20GJ0069 · ₱96,465,479.57 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TALIBON-BIEN UNIDO BRIDGE,24HC0036 · ₱96,386,000.00 · mapped
- OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BASI FLOOD CONTROL SYSTEM, PACKAGE 1, BASI, SOLANA, CAGAYAN24BD0230 · ₱95,535,134.84 · mapped
- OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CENTRO FLOOD CONTROL SYSTEM, PACKAGE 1, CENTRO, SOLANA24BD0229 · ₱95,439,377.91 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITH DESILTING ALONG BUTUANON RIVER, CEBU CITY21HH0164 · ₱95,140,689.00 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT COMBADO RIVER ALONG TOLEDO-TABUELAN-SAN REMEGIO ROAD, BRGY. CANTUOD, BALAMBAN, CEBU21HF0003 · ₱93,604,999.53 · mapped
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS- CONSTRUCTION OF THE TALIBON-BIEN UNIDO BRIDGE, BOHOL21HC0140 · ₱89,800,000.00 · mapped
- CONSTRUCTION OF FLYOVER - CONSTRUCTION OF JIBAO-AN FLYOVER, BRGY. JIBAO-AN, MANDURRIAO, ILOILO CITY19GJ0242 · ₱79,200,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUCAT RIVER, MUNTINLUPA CITY24OI0022 · ₱77,922,820.01 · mapped
- RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - CUPANG BR. (B01825LZ) ALONG PPTA ROAD, MUNTINLUPA CITY24OI0033 · ₱73,390,353.68 · mapped
- MFO-1 NATIONAL ROAD NETWORK SERVICES, ASSET PRESERVATION OF NATIONAL ROADS- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS, MANDAUE CAUSEWAY (OUANO AVE.) (S00386CB)17H00002 · ₱70,036,806.55 · mapped
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, CONSTRUCTION OF NEW PERMANENT BRIDGES, ANAGDONG BR. ALONG APAYAO-ILOCOS NORTE17PB0014 · ₱54,971,879.17
- CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, CONSTRUCTION OF NEW PERMANENT BRIDGES, IGAWE BR. ALONG APAYAO-ILOCOS NORTE ROAD17PB0015 · ₱54,961,115.71
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT GUADALUPE RIVER, BRGY. PAHINA SAN NICOLAS AND PASIL, CEBU CITY17HH0007 · ₱44,050,371.30
- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES ALONG BULACAO RIVER, DOWNSTREAM OF BULACAO BRIDGE, CEBU CITY17HH0006 · ₱34,300,000.00
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
