| CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) ANDDRAINAGE SYSTEMS ALONG THE FOLLOWING RIVERS;A.) CADCADIR RIVER, BRGY. BACSAY CATARAOAN SUR, CLAVERIA, CAGAYANB.) CADCADIR RIVER, BRGYS. UNION AND CADCADIR, CLAVERIA, CAGAYANC.) CABICUNGAN RI | Flood Control Management Cluster | ₱1.45B | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 116 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION B) AT GATTARAN , CAGAYAN | Flood Control Management Cluster | ₱1.10B | Reported complete | RAYMAN BUILDERS INC | 43 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER (SECTION A) AT GATTARAN, CAGAYAN | Flood Control Management Cluster | ₱1.04B | Reported complete | R-II BUILDERS INC | 43 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT IGUIG, CAGAYAN AND AGGUNETAN, LASAM, CAGAYAN | Flood Control Management Cluster | ₱945.5M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 59 | Check in |
| AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 T | Flood Control Management Cluster | ₱941.2M | 69% reported progress | L R TIQUI BUILDERS INC | 99 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG TUGUEGARAO RIVER AT CAGGAY, TUGUEGARAO CITY, CAGAYAN | Flood Control Management Cluster | ₱931.7M | Reported complete | RAYMAN BUILDERS INC | 62 | Check in |
| RIVER IMPROVEMENT WORKS ALONG CAGAYAN RIVER, BUNTUN BRIDGE, TUGUEGARAO AND SOLANA AT STA. 3+950 TO STA. 5+800 AND SLOPE PROTECTION WORKS FOR BUNTUN BRIDGE, RIGHT BANK STA. 0+042 TO STA. 0+410, TUGUEGARAO CITY, CAGAYAN | Flood Control Management Cluster | ₱907.5M | Reported complete | RAYMAN BUILDERS INC | 56 | Check in |
| REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | ₱862.9M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 56 | Check in |
| REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | ₱862.0M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 57 | Check in |
| CONSTRUCTION / ADDITIONAL FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, MUNICIPALITIES OF BUCAY, LANGIDEN, TAYUM, SALLAPADAN, LAGANGILANG, MANABO, AND LA PAZ ABRA | Flood Control Management Cluster | ₱853.1M | Reported complete | RAYMAN BUILDERS INC | 17 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, BRGY. UGUIS AND ALONG TIBANGRAN RIVER, BRGY. BARANGOBONG, MUNICIPALITY OF NUEVA ERA, ILOCOS NORTE | Flood Control Management Cluster | ₱715.1M | 94% reported progress | MSB VITUG CONST | 59 | Check in |
| REHABILITATION OF DIKE SYSTEM ALONG SOLSONA RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | ₱669.3M | Reported complete | E M CUERPO INC | 54 | Check in |
| CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTE | Flood Control Management Cluster | ₱533.8M | 94% reported progress | TOKWING CONST CORP FOR TOKWING CONSTRUC | 49 | Check in |
| FLOOD CONTROL PROJECT-WESTERN RIVER, STO. TOMAS/BUCAO RIVER, ZAMBALES | Flood Control Management Cluster | ₱420.4M | Reported complete | HORAMABI BUILDERS | 115 | Check in |
| CONSTRUCTION OF BANK PROTECTION WORKS ALONG CHICO RIVER AT PIAT. AND TUAO, CAGAYAN | Flood Control Management Cluster | ₱415.9M | 90% reported progress | J D LEGASPI CONST | 31 | Check in |
| FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF FLOOD MITIGATION STRUCTURE, STO. TOMAS RIVER (STA. FE SECTION), SAN MARCELINO, ZAMBALES | Zambales 2nd DEO | ₱386.0M | Reported complete | ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 149 | Check in |
| CONSTRUCTION/REHABILITATION OF BOLO RIVER DAM, BRGY. SAN ISIDRO, DUMALNEG, ILOCOS NORTE | Flood Control Management Cluster | ₱366.6M | Reported complete | TOKWING CONST CORP FOR TOKWING CONSTRUC | 56 | Check in |
| AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE1)-CONSTRUCTION OF PROTECTION WORKS USING GABIONS AND MATTRESSES. BRGY. DORONGAN SAWAT, STA. 2+840 TO STA.3+140 AND STA. 3+140 T0 STA. 3+640, DORONGAN KETAKET, STA 1+592 TO STA. 2+840 MANGATAREM; (PHASE II-A)-R | Flood Control Management Cluster | ₱363.2M | Reported complete | MSB VITUG CONST | 97 | Check in |
| CONSTRUCTION OF GROUNDSILLS ACROSS PASIG-POTRERO RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE, ANGELES-PORAC RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE (GROUNDSILL NO. 1), ANGELES-PORAC, PAMPANGA | Flood Control Management Cluster | ₱309.6M | Reported complete | NORTHERN BUILDERS | 153 | Check in |
| Construction of Camiling-Agno River Floodway, Tarlac, Phase 3 | CAMILING (TARLAC), TARLAC | ₱289.5M | Reported complete | BMK CONST CORP FORMERLY B M K CONST / ROYAL CROWN MONARCH CONST & SUPPLIES CORP | 98 | Check in |
| Construction of Camiling-Agno River Floodway, Tarlac, Phase 4 | CAMILING (TARLAC), TARLAC | ₱289.5M | Reported complete | BMK CONST CORP FORMERLY B M K CONST / ROYAL CROWN MONARCH CONST & SUPPLIES CORP | 97 | Check in |
| FLOOD CONTROL WORKS-SACOBIA-BAMBAN-ABACAN RIVER TRAINING WORKS INCLUDING RIO CHICO RIVER, TARLAC AND NUEVA ECIJA | Flood Control Management Cluster | ₱284.2M | Reported complete | NORTHERN BUILDERS | 149 | Check in |
| Construction of Shoreline Protection (Groins) along Santa Catalina, Ilocos Sur | SANTA CATALINA (ILOCOS SUR), ILOCOS SUR | ₱241.2M | Reported complete | A P B CONST / EGB CONST CORP FORMERLY: EGB CONST | 55 | Check in |
| Construction of Flood Control Mitigation Facilities along Amburayan River Basin at Barangays Bucao West, Bucao East, Lantag, Baritao and Tarangotong, Tagudin, Ilocos Sur | TAGUDIN (ILOCOS SUR), ILOCOS SUR | ₱241.2M | Reported complete | A P B CONST / EGB CONST CORP FORMERLY: EGB CONST | 5 | Check in |
| Construction of Flood Control Structure along Bislak River, Upstream and Downstream, Leftside of Vintar Bridge, Brgy. Abkir-Alviar, Vintar, Ilocos Norte | VINTAR (ILOCOS NORTE), ILOCOS NORTE | ₱211.3M | Reported complete | JOZEN BUILDERS AND CONST SUPPLY CORP / EGB CONST CORP FORMERLY: EGB CONST | 65 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), PAOAY, ILOCOS NORTE (PACKAGE B) | Region I | ₱198.0M | Reported complete | ALPHA | 73 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG QUIAOIT RIVER (CONSTRUCTION OF DIVERSION CHANNEL), BATAC, ILOCOS NORTE (PACKAGE B) | Region I | ₱198.0M | 95% reported progress | KATHA BUILDERS & SUPPLIES INC | 72 | Check in |
| Construction of Camiling-Agno River Floodway Phase 5 | CAMILING (TARLAC), TARLAC | ₱193.0M | Reported complete | BMK CONST CORP FORMERLY B M K CONST / ROYAL CROWN MONARCH CONST & SUPPLIES CORP | 96 | Check in |
| CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF LENGTAN FLOOD CONTROL ALONG CHICO RIVER, SAMOKI, BONTOC, MOUNTAIN PROVINCE | Cordillera Administrative Region | ₱193.0M | 90% reported progress | BALINTUGAN CONST | 32 | Check in |
| Improvement of Sto. Tomas River (Sta. Fe Section) San Marcelino, Zambales Phase 2 | SAN MARCELINO (ZAMBALES), ZAMBALES | ₱193.0M | Reported complete | REPOLMAN CONST CORP FORMERLY: REPOLMAN CONST / THREE W BUILDERS INC | 149 | Check in |
| FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTO TOMAS RIVER, SAN FELIPE, ZAMBALES | Region III | ₱193.0M | 98% reported progress | GLOBALCRETE BUILDERS INC | 138 | Check in |
| Construction of Flood Mitigation Structure along Sinucalan River, Barangay Camantiles, Urdaneta, Pangasinan | CITY OF URDANETA (PANGASINAN), PANGASINAN | ₱193.0M | Reported complete | SILVERWOLVES CONST CORP | 89 | Check in |
| Rehabilitation/Improvement of Samac SWIP, Bugnay SWIP, Bingao SWIP Small Water Impounding Projects Barangays Sta. Asuncion, San Agustin, San Pedro, San Nicolas, Ilocos Norte | SAN NICOLAS (ILOCOS NORTE), ILOCOS NORTE | ₱193.0M | Reported complete | BADOC BUILDERS & SUPPLY INC FORMERLY: BADOC BUILDER & SUPPLY / ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 74 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BORIS RIVER, PACKAGE 2, BARANGAY PARIAN - BARANGAY TORRE 1ST, MANGATAREM, PANGASINAN | Region I | ₱193.0M | 98% reported progress | SILVERWOLVES CONST CORP | 86 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, SIFFU RIVER AT SAN PLACIDO, RO | Region II | ₱191.0M | 88% reported progress | R S K M CONST SERVICES | 81 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, ILAGAN RIVER AT AGGASIAN, ILAG | Region II | ₱190.8M | 93% reported progress | EGB CONST CORP FORMERLY: EGB CONST | 109 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PINTO STA.31+800 - STA. 33+650 (L/S) ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | ₱190.0M | 50% reported progress | DJY CONST | 81 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MNG'T PROGRAM: CONST'N / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: FLOOD CONTROL/URGENT RIVER BANK PROTECTION WORKS, AGASIAN, ILAGAN, ISABELA, STA. 000+000-STA. 1+020 (D | Region II | ₱186.0M | Reported complete | E M CUERPO INC | 142 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF TUGUEGARAO CIRCUMFERENTIAL DIKE ROAD, TUGUEGARA | Region II | ₱183.0M | Reported complete | DOUBLE J1908 CONST | 59 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS FOR CAGAYAN RIVER BASIN, CAGAYAN RIVER AT ALICAOCAO, CA | Region II | ₱182.6M | 72% reported progress | JOMARCANN GEN CONST | 107 | Check in |
| DIKING WITH SLOPE PROTECTION, SACOBIA-BAMBAN RIVER, PAMPANGA AND TARLAC | Flood Control Management Cluster | ₱173.6M | Reported complete | D L CERVANTES CONST CORP FORMERLY: | 148 | Check in |
| CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), ILOCOS NORTE | Region I | ₱173.0M | Reported complete | BADOC BUILDERS | 70 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM AND DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR (PHASE 2) | Region I | ₱157.3M | Reported complete | A I P CONST | 6 | Check in |
| Construction of Flood Control Structure along Abra River, Upstream and Down Stream of Quirino Bridge, Quirino, Ilocos Sur (Phase 1) | QUIRINO (ANGKAKI) (ILOCOS SUR), ILOCOS SUR | ₱157.3M | Reported complete | A I P CONST | 5 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Bambanay, San Juan, LaUnion | SAN JUAN (LA UNION), LA UNION | ₱154.4M | Reported complete | BALINTUGAN CONST | 20 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Bucao, San Gabriel, La Union | SAN GABRIEL (LA UNION), LA UNION | ₱154.4M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 24 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Bacsil, Bacnotan, LaUnion | BACNOTAN (LA UNION), LA UNION | ₱154.4M | Reported complete | RODEKOM GEN CONST AND ENT | 17 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Poblacion, San Gabriel, La Union | SAN GABRIEL (LA UNION), LA UNION | ₱154.4M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 23 | Check in |
| Construction of Flood Control Structure along Baroro River, Barangay Nagsabaran, San Juan, La Union | SAN JUAN (LA UNION), LA UNION | ₱154.4M | Reported complete | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 23 | Check in |
| CONSTRUCTION OF FLOOD CONTROL ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN ISIDRO SECTION (SEGMENT B), TARLAC CITY, TARLAC | Tarlac DEO | ₱148.5M | Reported complete | L R TIQUI BUILDERS INC | 130 | Check in |
| CONSTRUCTION OF FLOOD CONTROL ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN ISIDRO SECTION (SEGMENT A), TARLAC CITY, TARLAC | Tarlac DEO | ₱148.5M | Reported complete | L R TIQUI BUILDERS INC | 130 | Check in |
| CONSTRUCTION OF DALAGUISEN FLOOD CONTROL STRUCTURE, LAGANGILANG, ABRA | Abra DEO | ₱148.5M | 92% reported progress | MG SAMIDAN CONST | 22 | Check in |
| Construction of Salangsang Flood Control Structure, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱148.5M | Reported complete | MG SAMIDAN CONST | 36 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER, MABALACAT CITY, PAMPANGA | Pampanga 3rd DEO | ₱148.5M | Reported complete | M G SALAZAR CONST CORP FOR M G SALAZAR | 150 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER (PHASE III), MABALACAT CITY, PAMPANGA | Pampanga 3rd DEO | ₱148.5M | Reported complete | M G SALAZAR CONST CORP FOR M G SALAZAR | 150 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER (PHASE IV), MABALACAT CITY, PAMPANGA | Pampanga 3rd DEO | ₱148.5M | Reported complete | MCB ZAMORA CONST | 150 | Check in |
| CONSTRUCTION OF FLOOD CONTROL ALONG AGNO RIVER, SITIO DALUPIRIP PROPER, DALUPIRIP, ITOGON, BENGUET | Cordillera Administrative Region | ₱147.6M | 89% reported progress | MG SAMIDAN CONST | 74 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL ALONG AGNO RIVER, SITIO BANAO AND SITIO ADONOT, BARANGAY AMBUKLAO, BOKOD, BENGUET | Cordillera Administrative Region | ₱147.6M | 65% reported progress | UNIVERSAL DE LEON CONST AND AGGREGATES | 65 | Check in |
| CONSTRUCTION OF SABDANG FLOOD CONTROL ALONG BAUANG RIVER BASIN, POBLACION, SABLAN, BENGUET | Benguet 1st DEO | ₱146.7M | Reported complete | MG SAMIDAN CONST | 44 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG SINUCALAN RIVER, PHASE 2, BARANGAY LASIP GRANDE, DAGUPAN CITY, PANGASINAN | Region I | ₱146.6M | 61% reported progress | BET CONST | 71 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG SINUCALAN RIVER, PHASE 2, BARANGAY LASIP CHICO, DAGUPAN CITY, PANGASINAN | Region I | ₱146.6M | 68% reported progress | BET CONST | 70 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTOL-SAN GABRIEL-KAPANGAN ROAD, MALUYO RIVER, BARANGAY MANGAAN, SANTOL LA UNION | Region I | ₱146.3M | 35% reported progress | ST MATTHEW GEN CONTRACTOR | 21 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, DOWNSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR | Region I | ₱145.1M | 91% reported progress | A I P CONST | 3 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, UPSTREAM OF QUIRINO BRIDGE, QUIRINO, ILOCOS SUR | Region I | ₱145.1M | 89% reported progress | A I P CONST | 7 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG AGNO RIVER, BARANGAY PANACOL, AGUILAR, PANGASINAN, PHASE IV | Region I | ₱144.9M | 89% reported progress | ST MATTHEW GEN CONTRACTOR | 77 | Check in |
| Construction of Flood Control and Drainage Structures (FCDS- Package 6) along Magat River, Santa Lucia Section, Bagabag, Nueva Viscaya | BAGABAG (NUEVA VIZCAYA), NUEVA VIZCAYA | ₱144.8M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 87 | Check in |
| Construction of Mega Dike Project along Chico River (Left Bank), Tabuk City, Kalinga | CITY OF TABUK (CAPITAL) (KALINGA), KALINGA | ₱144.8M | Reported complete | JTM CONST / EGB CONST CORP FORMERLY: EGB CONST | 44 | Check in |
| Construction of Flood Control Structure along Tarlac River Left Dike (Segment B), Tarlac | GERONA (TARLAC), TARLAC | ₱144.8M | Reported complete | T2B3 BUILDERS AND SUPPLIES CORP | 122 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Barangay San Jose Sur, Manabo, Abra | MANABO (ABRA), ABRA | ₱144.8M | Reported complete | MG SAMIDAN CONST | 16 | Check in |
| Construction of Flood Control and Drainage Structures (FCDS- Package 8) along Magat River, Baretbet Section, Bagabag, Nueva Viscaya | BAGABAG (NUEVA VIZCAYA), NUEVA VIZCAYA | ₱144.8M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 91 | Check in |
| Construction of Flood Control and Drainage Structures (FCDS- Package 2) along Magat River, Magapuy Section, Bayombong, Nueva Viscaya | BAYOMBONG (CAPITAL) (NUEVA VIZCAYA), NUEVA VIZCAYA | ₱144.8M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 91 | Check in |
| Construction of Flood Control Structure along Tarlac River Right Dike (Segment B), Tarlac | CITY OF TARLAC (CAPITAL) (TARLAC), TARLAC | ₱144.8M | Reported complete | T2B3 BUILDERS AND SUPPLIES CORP | 117 | Check in |
| Construction of Flood Control Structure along Tarlac River Right Dike (Segment A), Tarlac | GERONA (TARLAC), TARLAC | ₱144.8M | Reported complete | T2B3 BUILDERS AND SUPPLIES CORP | 118 | Check in |
| Construction of Pudok Flood Control (Phase 2), Tayum, Abra | TAYUM (ABRA), ABRA | ₱144.8M | Reported complete | MG SAMIDAN CONST | 32 | Check in |
| Construction of Flood Control and Drainage Structures (FCDS- Package 7) along Magat River, Magapuy Section, Bayombong, Nueva Viscaya | BAYOMBONG (CAPITAL) (NUEVA VIZCAYA), NUEVA VIZCAYA | ₱144.8M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 91 | Check in |
| Construction of Flood Control and Drainage Structures (FCDS- Package 3) along Magat River, Baretbet Section, Bagabag, Nueva Viscaya | BAGABAG (NUEVA VIZCAYA), NUEVA VIZCAYA | ₱144.8M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 91 | Check in |
| Construction of Flood Control and Drainage Structures (FCDS- Package 5) along Magat River, Bagahabag Section, Solano, Nueva Viscaya | SOLANO (NUEVA VIZCAYA), NUEVA VIZCAYA | ₱144.8M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 93 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Barangay Ampalioc, Luba, Abra | LUBA (ABRA), ABRA | ₱144.8M | Reported complete | MG SAMIDAN CONST | 9 | Check in |
| Construction of Flood Control Structure along Tarlac River Left Dike (Segment A), Tarlac | CITY OF TARLAC (CAPITAL) (TARLAC), TARLAC | ₱144.8M | Reported complete | T2B3 BUILDERS AND SUPPLIES CORP | 130 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Barangay Lagben, Lagangilang, Abra | LAGANGILANG (ABRA), ABRA | ₱144.8M | Reported complete | MG SAMIDAN CONST | 27 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS) ALONG MATUNO RIVER, MANAMTAM SECTION 3, BAMBANG, NUEVA VIZCAYA | Nueva Vizcaya DEO | ₱144.8M | Reported complete | DALCON CONST | 92 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS) ALONG MATUNO RIVER, STO. DOMINGO SECTION 4, BAMBANG, NUEVA VIZCAYA | Nueva Vizcaya DEO | ₱144.8M | Reported complete | DALCON CONST | 93 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDS) ALONG MAGAT RIVER, PAITAN SECTION 1, BAYOMBONG, NUEVA VIZCAYA | Nueva Vizcaya DEO | ₱144.8M | Reported complete | DALCON CONST | 90 | Check in |
| REHABILITATION OF THE FLOOD MITIGATION STRUCTURE ALONG BUED RIVER BASIN, CAMP 1 SECTION, TABAAN SUR, TUBA, BENGUET | Cordillera Administrative Region | ₱144.8M | Reported complete | ARCINUE COMM'L CORP | 68 | Check in |
| CONSTRUCTION OF REVETMENT AND EMBANKMENT OF DIKE AND CHANNELING ALONG CHICO RIVER, TABUK CITY, KALINGA | Cordillera Administrative Region | ₱144.8M | 93% reported progress | OMENGAN CONST | 44 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDS) ALONG MAGAT RIVER, POGONSINO SECTION 5, BAGABAG, NUEVA VIZCAYA | Nueva Vizcaya DEO | ₱144.8M | Reported complete | DALCON CONST | 92 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDC PACKAGE 1) ALONG MAGAT RIVER, BONFAL PROPER SECTION, BAYOMBONG, NUEVA VIZ | Nueva Vizcaya DEO | ₱144.8M | Reported complete | DALCON CONST | 93 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURES (FCDS) ALONG ANGADANAN RIVER, NALUBBUNAN SECTION 2, QUEZON, NUEVA VIZCAYA | Nueva Vizcaya DEO | ₱144.8M | Reported complete | DALCON CONST | 96 | Check in |
| 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS PACKAGE 4) AL | Nueva Vizcaya DEO | ₱144.8M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 94 | Check in |
| 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS PACKAGE 9) ALONG | Nueva Vizcaya DEO | ₱144.8M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 94 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF SAN ANTONIO FLOOD CONTROL ALONG ABRA RIVER, SAN ANTONIO, BANGUED, ABRA | Abra DEO | ₱144.8M | Reported complete | MG SAMIDAN CONST | 37 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY MUDIIT, DOLOR | Abra DEO | ₱144.8M | 84% reported progress | MG SAMIDAN CONST | 27 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF LINGEY FLOOD CONTROL, LINGEY, BUCLOC, ABRA | Abra DEO | ₱144.8M | Reported complete | MG SAMIDAN CONST | 1 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BAÑACAO FLOOD CONTROL ALONG ABRA RIVER, BAÑACAO, BANGUED, ABRA | Abra DEO | ₱144.8M | 84% reported progress | MG SAMIDAN CONST | 38 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE, CONSTRUCTION OF AMPALIOC FLOOD CONTROL, AMPALIOC, LUBA, ABRA | Abra DEO | ₱144.8M | 87% reported progress | MG SAMIDAN CONST | 10 | Check in |
| FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONST. OF THE TARLAC CITY URBAN DRAINAGE SYSTEM ALONG MANILA NORTH ROAD, TARLAC CITY (PHASE I), PROVINCE OF TARLAC | Region III | ₱144.8M | Reported complete | NORTHERN BUILDERS | 132 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG PANGASINAN-NUEVA VISCAYA ROAD, PANGASINAN | Region I | ₱144.7M | Reported complete | E M CUERPO INC | 99 | Check in |
| Construction of Flood Control Structure along Balili River, Barangay Suyo (Package 1), Bagulin, La Union | BAGULIN (LA UNION), LA UNION | ₱144.7M | Reported complete | MG SAMIDAN CONST / KRYPTONITE 6S BUILDERS INC | 31 | Check in |
| Construction of Flood Control Structure along Aringay River, Barangay San Juan West, Aringay, La Union | ARINGAY (LA UNION), LA UNION | ₱144.7M | Reported complete | ROCK-WBL CONST CORP FOR: ROCK-WBL CONST TRADING & SERVICES | 44 | Check in |
| Construction of Flood Control Structure Along Aringay River, Barangay Anduyan, Tubao, La Union | TUBAO (LA UNION), LA UNION | ₱144.7M | Reported complete | RODEKOM GEN CONST AND ENT | 54 | Check in |
| Construction of Flood Control Structure Along Aringay River, Barangay Rizal, Tubao, La Union | TUBAO (LA UNION), LA UNION | ₱144.7M | Reported complete | RODEKOM GEN CONST AND ENT | 51 | Check in |
| Construction of Flood Control Structure Along Aringay River, Barangay Halog East, Tubao, La Union | TUBAO (LA UNION), LA UNION | ₱144.7M | Reported complete | RODEKOM GEN CONST AND ENT | 52 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, BARANGAY POBLACION NORTE, MUNICIPALITY OF RIZAL, NUEVA ECIJA | Nueva Ecija 1st DEO | ₱144.7M | 95% reported progress | R A PAHATI CONST | 152 | Check in |
| Construction of Deet-Pudok Flood Control Structure, Tayum, Abra | TAYUM (ABRA), ABRA | ₱144.7M | Reported complete | MG SAMIDAN CONST | 32 | Check in |
| Construction of Toon-San Gregorio Flood Control Structure, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱144.7M | Reported complete | 739 BUILDERS | 34 | Check in |
| Construction of Naguillan Flood Control Structure, La Paz, Abra | LA PAZ (ABRA), ABRA | ₱144.7M | Reported complete | MG SAMIDAN CONST / RM30 PSG CONST CORP | 35 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BAAY FLOOD CONTROL , LICUAN-BAAY, ABRA | Abra DEO | ₱144.7M | 93% reported progress | MG SAMIDAN CONST | 10 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF ABANG FLOOD CONTROL ALONG ABRA RIVER, ABANG, BUCAY, ABRA | Abra DEO | ₱144.7M | 95% reported progress | MG SAMIDAN CONST | 20 | Check in |
| LOCAL PROGRAM-CONST./REP./REHAB./IMPR'VT. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-FLOOD CONTROL & DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONST./REHAB./CONST. OF FLOOD CONTROL STRUCTURES ALONG RIO CHICO RIVER, BRGY. MACARSE, ZARAGOSA, N.E. | Region III | ₱144.7M | Reported complete | R D TALENS CONST AND TRADING | 149 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM (PACKAGE 2), DAGUPAN CITY, PANGASINAN | Region I | ₱144.7M | Reported complete | HIGH ROCK CONST AND SUPPLIES INC | 69 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY QUILLAT, LANGIDEN, | Abra DEO | ₱144.7M | 93% reported progress | MG SAMIDAN CONST | 35 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO PARATONG, BARANGAY POBLACION, BACNOTAN, LA UNION | Region I | ₱144.7M | 73% reported progress | SILVERWOLVES CONST CORP | 15 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, BRGY. JARDIN - TARANGOTONG, TAGUDIN, ILOCOS SUR, STA 8+118 - STA 9 | Region I | ₱144.7M | Reported complete | GEMMA CONST SUPPLY INC FORMERLY:GEMMA CON | 2 | Check in |
| CONST./REHAB. OF FLOOD MIT. FACI. W/IN MAJOR BASINS & PRIN. RIVERS -CONST. OF FLOOD CONT. STRUC. ALONG ARINGAY RIVER BASIN, TUBAO, LA UNION (PACKAGE 8), TUBAO, LA UNION | La Union 2nd DEO | ₱144.7M | 95% reported progress | JWU CONST AND SUPPLY | 52 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY PAGDARAOAN, SAN FERNANDO CITY, LA UNION | Region I | ₱144.7M | 91% reported progress | SILVERWOLVES CONST CORP | 21 | Check in |
| Construction of Magat River Flood Control Project, Barangay Turod, Reina Mercedes, Isabela | REINA MERCEDES (ISABELA), ISABELA | ₱144.7M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES / MAV CONST SUPPLY AND POWER DEVELOPMENT | 104 | Check in |
| Construction of Flood Control Structure along Abra Major River Basin, Barangay Nagtupacan, Dolores, Abra | DOLORES (ABRA), ABRA | ₱144.7M | Reported complete | MG SAMIDAN CONST | 31 | Check in |
| Construction of Flood Control Structure along Aringay River, Barangay Rizal, Tubao, La Union | TUBAO (LA UNION), LA UNION | ₱144.7M | Reported complete | RODEKOM GEN CONST AND ENT | 52 | Check in |
| ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION STRU | Isabela 2nd DEO | ₱144.7M | Reported complete | JWU CONST AND SUPPLY | 93 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BALLACAYU FLOOD CONTROL SYSTEM | Isabela 1st DEO | ₱144.7M | Reported complete | DRAGON TWELVE BUILDERS | 72 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, PACKAGE 2, GUIBANG, | Isabela 3rd DEO | ₱144.7M | 94% reported progress | JWU CONST AND SUPPLY | 106 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, TALLUNGAN | Isabela 3rd DEO | ₱144.7M | 90% reported progress | JWU CONST AND SUPPLY | 109 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALITAO FLOOD CONTROL STRUCTURE, STA. 0+305 - STA. 0+ | Isabela 4th DEO | ₱144.7M | 91% reported progress | JWU CONST AND SUPPLY | 104 | Check in |
| OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, TALLUNGAN SE | Isabela 3rd DEO | ₱144.7M | 91% reported progress | JWU CONST AND SUPPLY | 110 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, BUENAVISTA | Isabela 3rd DEO | ₱144.7M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 103 | Check in |
| OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN RIVER, DAMMAO SEC | Isabela 3rd DEO | ₱144.7M | 86% reported progress | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 102 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALITAO FLOOD CONTROL STRUCTURE, STA. 0+000 - STA. 0+ | Isabela 4th DEO | ₱144.7M | Reported complete | JWU CONST AND SUPPLY | 117 | Check in |
| Construction of Flood Control Structure along Aringay River, Barangay Samara-Sta.Lucia, Aringay, La Union | ARINGAY (LA UNION), LA UNION | ₱144.7M | Reported complete | SILVERWOLVES CONST CORP | 42 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GUMBAUAN FLOOD CONTROL STRUCTURE, STA. 0+000 - STA. 0 | Isabela 4th DEO | ₱144.7M | 81% reported progress | JWU CONST AND SUPPLY | 113 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GUMBAUAN FLOOD CONTROL STRUCTURE, STA. 0+305 - STA. 0 | Isabela 4th DEO | ₱144.7M | 73% reported progress | JWU CONST AND SUPPLY | 113 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SINABBARAN FLOOD CONTROL STRUCTURE, STA. 0+305 - STA. | Isabela 4th DEO | ₱144.7M | 49% reported progress | JWU CONST AND SUPPLY | 118 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE | Isabela 1st DEO | ₱144.7M | 98% reported progress | DRAGON TWELVE BUILDERS | 102 | Check in |
| Construction of Slope Protection Works for Cagayan River Basin, Cagayan River, Santa Maria, Isabela | SANTA MARIA (ISABELA), ISABELA | ₱144.7M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 70 | Check in |
| Construction of Flood Control Structure along Aringay River, Barangay Garcia - Gonzales, Tubao, La Union | TUBAO (LA UNION), LA UNION | ₱144.7M | Reported complete | RODEKOM GEN CONST AND ENT | 51 | Check in |
| Construction of Flood Mitigation Structure along Magat River, Turod Section, Reina Mercedes, Isabela Package 2 | REINA MERCEDES (ISABELA), ISABELA | ₱144.7M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES | 103 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River, Package 2, Barangay District 2, Gamu, Isabela | GAMU (ISABELA), ISABELA | ₱144.7M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES / HIGH ROAD CONST SERVICES | 106 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River, Package 1, Barangay District 2, Gamu, Isabela | GAMU (ISABELA), ISABELA | ₱144.7M | Reported complete | ROAD EDGE TRADING & DEVELOPMENT SERVICES / HIGH ROAD CONST SERVICES | 105 | Check in |
| Construction of Flood Control Structure along Aringay River, Barangay Halog East - Halog West, Tubao, La Union | TUBAO (LA UNION), LA UNION | ₱144.7M | Reported complete | RODEKOM GEN CONST AND ENT | 52 | Check in |
| Construction of Flood Control Structure along Aringay River, Barangay Anduyan, Tubao, La Union | TUBAO (LA UNION), LA UNION | ₱144.7M | Reported complete | RODEKOM GEN CONST AND ENT | 52 | Check in |
| Construction of Poblacion-Deet Flood Control along Abra River, Tayum, Abra | TAYUM (ABRA), ABRA | ₱144.7M | Reported complete | MG SAMIDAN CONST / TWINFORMERS CONST SERVICES | 33 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF COMPANIA FLOOD CONTROL, | Isabela 1st DEO | ₱144.7M | Reported complete | ARVEA'S CONST | 88 | Check in |
| FLOOD CONTROL WORKS-DIKING SACOBIA-BAMBAN RIVER, BAMBAN, TARLAC, PROVINCE OF TARLAC | Flood Control Management Cluster | ₱144.7M | Reported complete | 11-16 CONST | 148 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF MUDIIT FLOOD CONTROL ALONG ABRA RIVER, MUDIIT, DOLORES, ABRA | Abra DEO | ₱144.6M | 92% reported progress | MG SAMIDAN CONST | 27 | Check in |
| Construction of Flood Mitigation Structure along Magat River, Turod Section, Reina Mercedes, Isabela Package 1 | REINA MERCEDES (ISABELA), ISABELA | ₱144.5M | Reported complete | A DE GUIA CONST AND DEVELOPMENT CORP FORMERLY: A DE GUIA CONST | 103 | Check in |
| FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELA | Isabela 4th DEO | ₱144.4M | 81% reported progress | EDDMARI CONST | 108 | Check in |
| OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FC STRUCTURE,BAROCBOC-SAN MARIANO SECTION,STA.21+426-STA.22+002(L/S),STA. M | Apayao 2nd DEO | ₱143.9M | Reported complete | ISNAG BUILDERS & DEV'T CORP | 9 | Check in |
| OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG- CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCT, SAN MARIANO SECTION, STA.23+808-STA.24+384(R/S) | Apayao 2nd DEO | ₱143.9M | 98% reported progress | ISNAG BUILDERS & DEV'T CORP | 10 | Check in |
| OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAROCBOC-SAN MARIANO SEC,STA.22+002-STA.22+578(R/S) | Apayao 2nd DEO | ₱143.9M | Reported complete | ISNAG BUILDERS & DEV'T CORP | 9 | Check in |
| Construction of Gen. E. Batalla Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 550, Camalaniugan, Cagayan | CAMALANIUGAN (CAGAYAN), CAGAYAN | ₱143.9M | Reported complete | GVDPM CONST CORP FORMERLY: ZM CONSTRUCTIO | 38 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONT | Nueva Vizcaya DEO | ₱143.3M | Reported complete | DALCON CONST | 97 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONT | Nueva Vizcaya DEO | ₱143.3M | Reported complete | DALCON CONST | 89 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGADANA | Nueva Vizcaya DEO | ₱143.3M | 95% reported progress | DALCON CONST | 95 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONT | Nueva Vizcaya DEO | ₱143.3M | Reported complete | DALCON CONST | 90 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARANGLA RIVER IBA SIDE, BARANGAY SAN AGUSTIN, IBA, ZAMBALES | Zambales 1st DEO | ₱143.2M | Reported complete | R A PAHATI CONST | 99 | Check in |
| OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE, BAGUTONG SEC,STA.29+205-STA.29+760(R/S) | Apayao 2nd DEO | ₱142.9M | Reported complete | ISNAG BUILDERS & DEV'T CORP | 11 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY PALAQUIO, BUC | Abra DEO | ₱142.8M | 96% reported progress | MG SAMIDAN CONST | 21 | Check in |
| CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER (SOUTH SIDE), PHASE 1, SAN FELIPE, ZAMBALES | Zambales 1st DEO | ₱142.7M | Reported complete | R A PAHATI CONST | 140 | Check in |
| ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION WORKS FO | Isabela 4th DEO | ₱142.6M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 107 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BENAY RIVER, BENAY - BARANGAY PALABOT | Nueva Vizcaya 2nd DEO | ₱142.6M | 72% reported progress | AMP 723 CONST CORP FORMERLY: A M P CONST | 108 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SLOPE PROTECTION OF SACOBIA-BAMBAN RIVER, PROVINCE OF TARLAC | Flood Control Management Cluster | ₱142.3M | Reported complete | 11-16 CONST | 150 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, DOWNSTREAM, PHASE 1, ALWINALDO BRIDGE, BARANGAY MAIPALIG, BATAC CITY, ILOCOS NORTE | Ilocos Norte 2nd DEO | ₱141.9M | 75% reported progress | MEGAPOLITAN BUILDERS AND CONST SUPPLY | 64 | Check in |
| CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, DOWNSTREAM, PHASE 2, ALWINALDO BRIDGE, BARANGAY MAIPALIG, BATAC CITY, ILOCOS NORTE | Ilocos Norte 2nd DEO | ₱141.9M | 72% reported progress | MEGAPOLITAN BUILDERS AND CONST SUPPLY | 64 | Check in |
| OO2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCT ,APAYAO-ABULUG RIVER BASIN,SWAN SECTION, STA. 36+566-STA. 37+121 | Apayao 2nd DEO | ₱141.8M | 74% reported progress | ISNAG BUILDERS & DEV'T CORP | 8 | Check in |
| OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF FLOOD CONTROL STRUCTURE, APAYAO-ABULUG RIVER BASIN, STA. LINA SEC., STA.22+515-STA | Apayao 2nd DEO | ₱141.8M | 70% reported progress | ISNAG BUILDERS & DEV'T CORP | 6 | Check in |
| OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUCTURE,CAPANNIKIAN SECTION,STA.33+885-STA. 34+440(L/S), | Apayao 2nd DEO | ₱141.8M | 81% reported progress | ISNAG BUILDERS & DEV'T CORP | 8 | Check in |
| CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADUNGON RIVER, BARANGAY STA. ANA, SOLSONA, ILOCOS NORTE | Ilocos Norte 2nd DEO | ₱141.4M | 61% reported progress | EUS CONST | 47 | Check in |
| Construction of Catotoran Norte Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 130, Sta. 0+00 - Sta. 0+057, Sta. 0+000 - Sta. 0+200, Camalaniugan, Cagayan | CAMALANIUGAN (CAGAYAN), CAGAYAN | ₱141.1M | Reported complete | GVDPM CONST CORP FORMERLY: ZM CONSTRUCTIO | 34 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA FE RIVER, | Nueva Vizcaya 2nd DEO | ₱140.5M | 94% reported progress | DALCON CONST | 98 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MANGA RIVER, BARANGAY MABASA-INABAN, DUPAX DE | Nueva Vizcaya 2nd DEO | ₱140.5M | 65% reported progress | DALCON CONST | 103 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUED RIVER, SAN JACINTO, PANGASINAN (PACKAGE 1) | Region I | ₱140.4M | 82% reported progress | RS RODRIGUEZ CONST & SUPPLIES | 73 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA FE RIVER, | Nueva Vizcaya 2nd DEO | ₱140.4M | 96% reported progress | DALCON CONST | 99 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), REHABILITATION OF FLOOD CONTROL STRUCTURE, DRAINAGE STRUCTURE AND SMALL WATER IMPOUNDING PROJECT (SWIP), BARANGAY 20, SAN PABLO, SAN NICOLAS, ILOCOS NORTE | Region I | ₱140.4M | 0% reported progress | A B TAYLAN CONST & DEVT FORMERLY: ADSM CONST | 72 | Check in |
| OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (CULLALABO SUR SECTION), BARANGAY CULLALABO, BURGOS, ISABELA | Isabela 2nd DEO | ₱140.4M | 42% reported progress | RR BUILDERS | 89 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUED RIVER, SAN JACINTO, PANGASINAN (PACKAGE 2) | Region I | ₱140.4M | 62% reported progress | RS RODRIGUEZ CONST & SUPPLIES | 73 | Check in |
| OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (LANTING SECTION), ROXAS,ISABELA | Isabela 2nd DEO | ₱140.4M | 47% reported progress | JWU CONST AND SUPPLY | 86 | Check in |
| OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL STRUCTURE, BARANGAY BANQUERO, DOWNSTREAM, PHASE2 | Isabela 3rd DEO | ₱140.4M | 57% reported progress | JWU CONST AND SUPPLY | 102 | Check in |
| OO2:FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES DRAINAGE SYSTEMS -CONSTRUCTION OF BUGNAY CREEK FLOOD CONTROL PROJECT, DALIG SECTION, BURGOS, ISABELA | Isabela 2nd DEO | ₱140.4M | 43% reported progress | JWU CONST AND SUPPLY | 97 | Check in |
| OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, RIZAL SECTION, ROXAS, ISABELA | Isabela 2nd DEO | ₱140.4M | 4% reported progress | JWU CONST AND SUPPLY | 82 | Check in |
| FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PASUQUIN RIVER, BARANGAY SULBEC, PASUQUIN, ILOCOS NORTE | Ilocos Norte 1st DEO | ₱140.4M | 70% reported progress | A L SALAZAR CONST INC | 71 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE, CARDONA, DOLORES, ABRA | Abra DEO | ₱140.3M | 86% reported progress | MG SAMIDAN CONST | 30 | Check in |
| Construction of Flood Mitigation Structure along Ilagan River, Barangay Alinguigan 1st to Barangay Alinguigan 2nd, City of Ilagan, Isabela | ILAGAN CITY (CAPITAL) (ISABELA), ISABELA | ₱139.9M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 107 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River-Phase IV, Barangay Malapagay, Sto. Tomas, Isabela | SANTO TOMAS (ISABELA), ISABELA | ₱139.9M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 76 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River - Phase II (Package 1), Barangay Calamagui 2nd, City of Ilagan, Isabela | ILAGAN CITY (CAPITAL) (ISABELA), ISABELA | ₱139.9M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 101 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River - Phase II, Barangay Alibagu, City of Ilagan, Isabela | ILAGAN CITY (CAPITAL) (ISABELA), ISABELA | ₱139.9M | Reported complete | EGB CONST CORP FORMERLY: EGB CONST | 103 | Check in |
| Construction of Flood Mitigation Structure along Cagayan River - Phase III, Ngarag, Cabagan, Isabela | CABAGAN (ISABELA), ISABELA | ₱139.9M | Reported complete | DRAGON TWELVE BUILDERS & CONST SUPPLY | 74 | Check in |
| CONTRACT PACKAGE 1: CONST/REH OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONST. OF FLOOD MITIGATION FACILITIES ALONG A. BALILI RIVER (MAIN) STA. 1+297-STA. 1+400 B. ASIN-GALLANO RIVER STA. 2+240-STA. 2+788 | Baguio City DEO | ₱139.8M | 97% reported progress | GOLDRICH CONST | 54 | Check in |
| FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE CANAL, LAOAG CITY, ILOCOS NORTE | Ilocos Norte 1st DEO | ₱139.0M | 19% reported progress | A B TAYLAN CONST | 73 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, NORO-DEMET, POBLACION, | Abra DEO | ₱139.0M | 90% reported progress | MG SAMIDAN CONST | 34 | Check in |
| CONSTRUCTION OF NAGUILLAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRA | Abra DEO | ₱139.0M | 95% reported progress | MG SAMIDAN CONST | 34 | Check in |
| CONSTRUCTION OF CULIONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CULIONG, SAN JUAN, ABRA | Abra DEO | ₱138.9M | 85% reported progress | MG SAMIDAN CONST | 29 | Check in |
| CONSTRUCTION OF KAWITAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, DANGLAS, ABRA | Abra DEO | ₱138.9M | 95% reported progress | MG SAMIDAN CONST | 37 | Check in |
| CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CARDONA, DOLORES, ABRA | Abra DEO | ₱138.9M | 96% reported progress | MG SAMIDAN CONST | 31 | Check in |
| CONSTRUCTION OF CATACDEGAN VIEJO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CATACDEGAN VIEJO, MANABO, ABRA | Abra DEO | ₱138.8M | 21% reported progress | MG SAMIDAN CONST | 16 | Check in |
| CONSTRUCTION OF MALIBCONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, MALIBCONG, ABRA | Abra DEO | ₱138.8M | 80% reported progress | MG SAMIDAN CONST | 2 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE, CONSTRUCTION OF CABARUYAN FLOOD CONTROL, CABARUYAN, DAGUIOMAN, ABRA | Abra DEO | ₱138.7M | 94% reported progress | MG SAMIDAN CONST | 1 | Check in |
| CONSTRUCTION OF SLOPE PROTECTION/FLOOD MITIGATION STRUCTURE ALONG BUCAO RIVER DOWNSTREAM, BOTOLAN, ZAMBALES (PHASE 6) | Zambales 1st DEO | ₱138.6M | 96% reported progress | GCLT CONST INC FORMERLY: GCLT CONST | 115 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY LI | Abra DEO | ₱138.5M | 93% reported progress | MG SAMIDAN CONST | 36 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF QUILIAT FLOOD CONTROL ALONG ABRA RIVER, QUILIAT, LANGIDEN, ABRA | Abra DEO | ₱138.3M | Reported complete | MG SAMIDAN CONST | 35 | Check in |
| CONSTRUCTION OF BULBULALA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY BULBULALA, LA PAZ, ABRA | Abra DEO | ₱138.2M | 95% reported progress | MG SAMIDAN CONST | 33 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY BA | Abra DEO | ₱138.1M | 95% reported progress | 739 BUILDERS | 21 | Check in |