RS RODRIGUEZ CONST & SUPPLIES is listed as a company organization in Philippine public procurement records on this site, with 23 linked DPWH project(s) totaling about ₱1,562,718,896.11. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
RS RODRIGUEZ CONST & SUPPLIES
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 23
- Total value
- ₱1,562,718,896.11
- Published flags
- 6
- Region
- PANGASINAN · Region I
Licensed officers (PCAB)
- Rommel Sison Rodriguez · Authorized Managing Officer (PCAB license 39676) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for RS RODRIGUEZ CONST & SUPPLIES — not an accusation or finding of wrongdoing.
Score: 71.80 / 100 · Projects in sample: 23 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 44/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 44
- lateCompletedProjects
- 4
- onTimeCompletedProjects
- 9
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 19
- pastTargetOngoingProjects
- 6
- undatedCompletedProjectsExcluded
- 4
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 23
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 23
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 93.5/100 · Weight: 11%
- projects
- 23
- componentScore
- 93.5
- flagsPerProject
- 0.22
- publishedV2Flags
- 5
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 23
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
23 geotagged projects — Open full map · Download projects (CSV)
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUED RIVER, SAN JACINTO, PANGASINAN (PACKAGE 1)25A00471 · ₱140,408,374.13 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUED RIVER, SAN JACINTO, PANGASINAN (PACKAGE 2)25A00472 · ₱140,406,891.60 · mapped
- CONSTRUCTION OF CALASIAO RIVERSIDE DIVERSION ROAD PROJECT, CALASIAO, PANGASINAN23A00439 · ₱96,499,774.44 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG MARUSAY RIVER AND TRIBUTARIES, CALASIAO, PANGASINAN (PACKAGE 2)23A00438 · ₱96,498,055.15 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANILA RIVER, BALUNGAO-UMINGAN, PANGASINAN (PACKAGE 3)25AI0032 · ₱95,431,605.10 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATABLANG RIVER, BALUNGAO, PANGASINAN (PACKAGE 2)25AI0025 · ₱95,417,399.48 · mapped
- CONSTRUCTION OF FLOOD CO0NTROL STRUCTURE ALONG MATABLANG RIVER, BALUNGAO PANGASINAN (PACKAGE 4)25AI0027 · ₱95,417,203.77 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MATABLANG RIVER, BALUNGAO, PANGASINAN (PACKAGE 3)25AI0026 · ₱95,417,069.61 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUED RIVER, SAN JACINTO, PANGASINAN (PACKAGE 3)25A00473 · ₱93,604,802.42 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DEPALO RIVER, SAN QUINTIN, PANGASINAN (PACKAGE 1)25AI0154 · ₱93,603,226.33 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DEPALO RIVER, SAN QUINTIN, PANGASINAN (PACKAGE 2)25AI0155 · ₱93,603,046.02 · mapped
- Construction of Slope Protection Structure along Banila and Allied River, Balungao, Pangasinan24AI0072 · ₱49,446,862.94 · mapped
- Construction of Slope Protection Structure along Banila and Allied River, Umingan, Pangasinan (Package 1)24AI0074 · ₱49,443,875.72 · mapped
- Construction of Slope Protection Structure along Banila and Allied River, Umingan, Pangasinan (Package 2)24AI0075 · ₱49,442,175.71 · mapped
- Construction of Flood Mitigation Structure along Cabalancian River, Kita-Kita, Balungao, Pangasinan, Phase I24AI0064 · ₱48,944,869.30 · mapped
- CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS- CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING SITE DEVELOPMENT, BARANGAY CARMAY EAST, ROSALES, PANGASINAN21A00112 · ₱48,250,000.00 · mapped
- Construction of Flood Control Structure along Banila River at Don Justo Abalos, Umingan, Pangasinan22AI0061 · ₱29,374,620.62 · mapped
- Construction of Flood Control Structure along Banila River, Brgy. Capulaan, Balungao, Pangasinan22AI0050 · ₱29,345,730.44 · mapped
- Construction of Flood Control Structure along Banila River, Diket - Don Justo Abalos, Umingan, Pangasinan22AI0066 · ₱29,157,900.26 · mapped
- Construction of Flood Control Structure along Banila River, Brgy. Mauban, Balungao, Pangasinan24AI0069 · ₱24,477,326.91 · mapped
- Construction of Slope Protection Works along Matablang Creek, Brgys. Rajal and Esmeralda, Balungao, Pangasinan22AI0121 · ₱24,474,875.68 · mapped
- Construction of Slope Protection Works along Banila River, Brgy. Mauban, Balungao, Pangasinan22AI0136 · ₱24,473,376.44 · mapped
- Construction of Slope Protection Works in Barangay San Leon Balungao - San Leon Umingan, Pangasinan22AI0123 · ₱19,579,834.04 · mapped
Equipment & capacity
PCAB license
- License no.
- 39676
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Nov 12, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 39676); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
4 evaluations listed across 3 GPPB CPES releases; average final rating 93.7% over 2 rated projects; 4 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| May 2, 2025 | DPWH | ₱47,723,691.00 | Completed | 90.6% | 90.6% | 40th, p. 275 |
| Oct 17, 2022 | DPWH | ₱29,375,790.00 | Completed | 97.5% | 96.8% | 35th, p. 154 |
| Jul 12, 2022 | DPWH | ₱29,375,790.00 | On-going | 96.3% | — | 34th, p. 77 |
| Jul 12, 2022 | DPWH (JV) | ₱48,960,219.00 | On-going | 93.0% | — | 34th, p. 77 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →