GCLT CONST INC FORMERLY: GCLT CONST is listed as a company organization in Philippine public procurement records on this site, with 43 linked DPWH project(s) totaling about ₱1,288,094,173.23. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
GCLT CONST INC FORMERLY: GCLT CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 43
- Total value
- ₱1,288,094,173.23
- Published flags
- 0
- Region
- Zambales 1st DEO · Region III
Online presence
Google Maps: GCLT Construction★ 1 (1 reviews)Google Maps, 2026-10-22
21 Ardoin Street, East Bajac-Bajac, Olongapo City, Zambales, Olongapo City, Zambales
Licensed officers (PCAB)
- Glenn Carlo Lim Tan · Authorized Managing Officer (PCAB license 30657) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for GCLT CONST INC FORMERLY: GCLT CONST — not an accusation or finding of wrongdoing.
Score: 88.30 / 100 · Projects in sample: 43 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 86.4/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 86.4
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 38
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 41
- pastTargetOngoingProjects
- 3
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 43
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 43
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 43
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 43
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
35 geotagged projects — Open full map
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD MITIGATION STRUCTURE ALONG BUCAO RIVER DOWNSTREAM, BOTOLAN, ZAMBALES (PHASE 6)24CL0171 · ₱138,594,042.95 · mapped
- CONSTRUCTION OF BANK PROTECTION/FLOOD STABILIZATION STRUCTURES ALONG BUCAO RIVER, UPSTREAM, BOTOLAN, ZAMBALES (PHASE 10)25CL0163 · ₱97,584,289.19 · mapped
- CONSTRUCTION OF SLOPE PROTECTION PACKAGE 15 AT BOTOLAN-CAPAZ RD., BOTOLAN, ZAMBALES24CL0166 · ₱96,312,709.71 · mapped
- CONSTRUCTION OF TANGUAY RIVER FLOOD MITIGATION STRUCTURE, PHASE 3, CABANGAN, ZAMBALES24CL0001 · ₱95,051,001.64 · mapped
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD MITIGATION STRUCTURE ALONG BUCAO RIVER DOWNSTREAM, BOTOLAN, ZAMBALES (PHASE 5)24CL0154 · ₱92,912,114.73 · mapped
- REHABILITATION OF PEÑARANDA RIVER CONTROL, STA. 0+000.00 - STA. 0+452.40, BRGY. CALLOS, PEÑARANDA, NUEVA ECIJA21CF0090 · ₱72,091,161.02 · mapped
- Construction of Groundsill with Slope Protection along Abacan River, Downstream of NLEX Bridge, Angeles City, Pampanga23CI0100 · ₱48,990,187.47 · mapped
- Construction of Flood Mitigation Structure and Drainage Structure along Kalaklan River, Sta. 2 + 670 - Sta. 2 + 920, Olongapo City, Zambales22CM0057 · ₱48,249,970.41 · mapped
- FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE STRUCTURE ALONG STA. RITA RIVER, STA. 8+550 TO STA. 8+950, OLONGAPO CITY, ZAMBALES22CM0059 · ₱48,249,945.87 · mapped
- FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE STRUCTURE ALONG STA. RITA RIVER, STA. 8+150 TO STA. 8+550, OLONGAPO CITY, ZAMBALES22CM0060 · ₱48,249,736.95 · mapped
- Rehabilitation of Mabayuan River, Sta. 8+520.60 - Sta. 8+920.00 (Rigth Side) Olongapo City, Zambales22CM0067 · ₱38,598,913.89 · mapped
- REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES, RESTORATION OF SLOPE PROTECTION ALONG PAMATAWAN RIVER, CASTILLEJOS, ZAMBALES, PROVINCE OF ZAMBALES19C00051 · ₱37,424,419.57 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF STA. RITA RIVER, STA. 006+667 - STA. 006+871 (LEFT SIDE), OLONGAPO CITY, ZAMBALES19CM0065 · ₱36,218,457.13 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF STA. RITA RIVER, STA. 006+667 - STA. 006+871 (RIGHT SIDE), OLONGAPO CITY, ZAMBALES19CM0066 · ₱36,218,457.13 · mapped
- Construction of Sapangbalen Road Dike, Mabalacat, Pampanga23CI0151 · ₱34,289,957.79 · mapped
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL PROJECT AT BANCAL RIVER (CABATUHAN PHASE 3) UPSTREAM, IBA, ZAMBALES20CL0008 · ₱32,147,135.88 · mapped
- CONSTRUCTION OF SLOPE PROTECTION AT BALILI RIVER, NORTH APPROACH, IBA, ZAMBALES20CL0018 · ₱29,076,365.35 · mapped
- CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL STRUCTURE AT BALILI RIVER, BARANGAY PALANGINAN, IBA, ZAMBALES19CL0074 · ₱28,223,953.43 · mapped
- WIDENING OF PERMANENT BRIDGES, INCLUDING ROW, MABANGCAL BR. (B01439LZ) ALONG SAN MARCELINO- SAN ANTONIO- SAN NARCISO ROAD, SAN NARCISO, ZAMBALES18CL0059 · ₱21,286,764.66 · mapped
- DREDGING WORKS AT PORT FACILITIES AT NSD (MARINE TERMINAL), SUBIC BAY FREEPORT ZONE, OLONGAPO CITY17CM0074 · ₱19,799,632.03
- CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM AT ELICANO ST., EAST BAJAC-BAJAC, OLONGAPO CITY20CM0072 · ₱17,283,810.23 · mapped
- WIDENING OF PERMANENT BRIDGES, INCLUDING ROW, LINORON BR. 2 (B02812LZ) ALONG SN MARCELINO- SN ANTONI17CL0078 · ₱16,083,165.27 · mapped
- REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CALAGUIMAN BRIDGE (B01701LZ) ALONG ROMAN EXPRESSWAYSAMAL, BATAAN18CA0043 · ₱15,287,999.99 · mapped
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL, AT STO. NIÑO RIVER DIKE, (STA.0+410 TO STA. 0+620),17CL0026 · ₱13,837,098.89
- CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL, AT STO. NIÑO RIVER DIKE, (STA. 0+200 TO STA.0+410),17CL0025 · ₱13,827,941.17
- CONST. OF DRAINAGE SYSTEM ALONG RIZAL AVENUE, BRGY. WBB, OLONGAPO CITY17CM0064 · ₱13,758,134.79
- REHABILITATION OF SLOPE PROTECTION ALONG PAMPANGA RIVER, CALABA, SAN ISIDRO, NUEVA ECIJA18CF0081 · ₱13,687,801.36 · mapped
- CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM AT FONTAINE ST., OLONGAPO CITY20CM0073 · ₱13,440,098.71 · mapped
- CONCRETING OF BRGY. TAUGTOG - BRGY. CONSUELO FMR, BRGY. TAUGTOG AND BRGY. CONSUELO, BOTOLAN, ZAMBALES18CL0075 · ₱9,651,731.30 · mapped
- DESILTING OF STA. RITA RIVER, BRGY. STA. RITA, OLONGAPO CITY17CM0050 · ₱9,147,137.51
- RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGE, SAN LUIS BRIDGE (B01408LZ) ALONG DAANG MAHARLIKA (LZ)19BH0009 · ₱8,300,600.00 · mapped
- WIDENING OF PERMANENT BRIDGES, INCLUDING ROW, CASANTACRUZAN BR. (B01440LZ) ALONG SAN MARCELINO- SAN ANTONIO- SAN NARCISO ROAD, SAN NARCISO, ZAMBALES18CL0049 · ₱7,529,408.11 · mapped
- CONCRETING OF BRGY. GAMA-BRGY. TABALONG FMR, BRGY. GAMA AND BRGY. TABALONG, STA. CRUZ, ZAMBALES18CL0081 · ₱4,824,993.29 · mapped
- CONCRETING OF PUROK 3,MAESTRE ST., SITIO LANDINGAN, BRGY. NAULO FMR, BRGY. NAULO STA. CRUZ, ZAMBALES18CL0082 · ₱4,824,904.93 · mapped
- LOCAL ROADS - CONCRETING OF SITIO ROADS, IRAM, NEW CABALAN, OLONGAPO CITY20CM0071 · ₱4,752,167.50 · mapped
- REHABILITATION OF STA. RITA RIVER, OLONGAPO CITY19CM0064 · ₱4,520,169.34 · mapped
- CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG PRINCIPAL RIVERS, NAYUM RIVER, STA. CRUZ, ZAMBALES16CL0077 · ₱4,363,730.00
- CONSTRUCTION OF BANGAN MULTI-PURPOSE BUILDING, BARANGAY BANGAN, BOTOLAN, ZAMBALES 2ND LD15CL0107 · ₱2,939,999.03
- CONST. OF LOCAL ROADS, BARANGAY SAN GUILLERMO SAN MARCELINO, ZAMBALES18CM0059 · ₱2,782,281.59 · mapped
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES, STO. NIÑO BRIDGE (B00032LZ) ALONG OBR, CABANGAN,15CL0062 · ₱2,329,361.65 · mapped
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES, KILING BRIDGE(B01405LZ) ALONG OBR, CABANGAN, ZAMB15CL0059 · ₱1,939,984.77 · mapped
- CONST. OF LOCAL ROAD, SITIO NAGBALDIAN BRGY. SAN GUILLERMO, SAN MARCELINO, ZAM.17CM0045 · ₱1,861,068.24
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES, LUCAPON BRIDGE (B01430LZ) ALONG OBR, STA. CRUZ, Z15CL0060 · ₱1,551,368.76 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
