CONSTRUCTION OF BANK PROTECTION/FLOOD STABILIZATION STRUCTURES ALONG BUCAO RIVER, UPSTREAM, BOTOLAN, ZAMBALES (PHASE 10)
CONSTRUCTION OF BANK PROTECTION/FLOOD STABILIZATION STRUCTURES ALONG BUCAO RIVER, UPSTREAM, BOTOLAN, ZAMBALES (PHASE 10) is a DPWH-tracked public work in Zambales 1st DEO, Region III. Reported contract value: ₱97,584,289.19. Status: Past target date (DPWH On-Going). Contractor on record: GCLT CONST INC FORMERLY: GCLT CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost



