CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL, AT STO. NIÑO RIVER DIKE, (STA. 0+200 TO STA.0+410),
CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL, AT STO. NIÑO RIVER DIKE, (STA. 0+200 TO STA.0+410), is a DPWH-tracked public work in Zambales 1st DEO, Region III. Reported contract value: ₱13,827,941.17. Status: Reported complete (DPWH). Contractor on record: GCLT CONST INC FORMERLY: GCLT CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost



