CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL PROJECT AT BANCAL RIVER (CABATUHAN PHASE 3) UPSTREAM, IBA, ZAMBALES
CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL PROJECT AT BANCAL RIVER (CABATUHAN PHASE 3) UPSTREAM, IBA, ZAMBALES is a DPWH-tracked public work in Zambales 1st DEO, Region III. Reported contract value: ₱32,147,135.88. Status: Reported complete (DPWH). Contractor on record: GCLT CONST INC FORMERLY: GCLT CONST. Figures trace to dpwh.
Total Contract Cost



