CONSTRUCTION OF FLOOD ALLEVIATION STRUCTURE ALONG SANTO TOMAS RIVER (MACULCOL DIKE), PHASE 2 SAN NARCISO, ZAMBALES
CONSTRUCTION OF FLOOD ALLEVIATION STRUCTURE ALONG SANTO TOMAS RIVER (MACULCOL DIKE), PHASE 2 SAN NARCISO, ZAMBALES is a DPWH-tracked public work in Zambales 1st DEO, Region III. Reported contract value: ₱98,010,835.80. Status: Past target date (DPWH On-Going). Contractor on record: JTC CRUZ CONST CO INC. Figures trace to dpwh.
Total Contract Cost
