RAIK CONST AND DEVELOPMENT CORP FORMERLY: RAIK CONST AND SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 163 linked DPWH project(s) totaling about ₱3,711,198,029.54. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
RAIK CONST AND DEVELOPMENT CORP FORMERLY: RAIK CONST AND SUPPLY
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 163
- Total value
- ₱3,711,198,029.54
- Published flags
- 6
- Region
- Tarlac 2nd DEO · Region III
Public Record Grade
A transparent, data-derived summary of reported public records for RAIK CONST AND DEVELOPMENT CORP FORMERLY: RAIK CONST AND SUPPLY — not an accusation or finding of wrongdoing.
Score: 90.20 / 100 · Projects in sample: 163 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 82.2/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 82.2
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 142
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 159
- pastTargetOngoingProjects
- 15
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 163
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 163
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.1/100 · Weight: 11%
- projects
- 163
- componentScore
- 99.1
- flagsPerProject
- 0.03
- publishedV2Flags
- 5
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 163
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 45 of 153 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- Rehabilitation of Existing Dike along Rio Chico River, (Castillo Section, Right Bank), Phase 2, Sta. (-) 1+337.20 to Sta. (-) 1+737.60, Concepcion, Tarlac24CK0050 · ₱96,497,131.99 · mapped
- CONSTRUCTION OF SLOPE PROTECTION PACKAGE 18 AT BOTOLAN- CAPAZ RD., BOTOLAN, ZAMBALES24CL0143 · ₱96,495,832.21 · mapped
- Rehabilitation of Existing Dike along Parua River (Castillo Section, Left Bank), Package I, Sta. 5+169.10 to Sta. 569.50, Concepcion, Tarlac24CK0079 · ₱96,461,259.27 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, BALINCAGUING SECTION (PHASE I), SAN FELIPE, ZAMBALES24CL0130 · ₱95,244,829.62 · mapped
- CONSTRUCTION OF MISSING LINKS/ NEW ROADS STA CRUZ-MANGATAREM ROAD, ZAMBALES, (PHASE 13)25CL0217 · ₱95,177,945.96
- CONCRETING OF TRADOC ROAD NETS, PHASE 2, CAMP O'DONELL, CAPAS, TARLAC20CK0041 · ₱91,667,912.88 · mapped
- CSSP, BIP, ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF SUBIC-CAWAG-BALAYBAY ROAD (HANJIN ROAD INTERMITTENT SECTION), SUBIC, ZAMBALES25CM0042 · ₱77,575,579.96 · mapped
- CONCRETING OF ROAD AT BRGY. CUT-CUT II - BRGY. ANUPUL (PHASE II), CAPAS AND BAMBAN, TARLAC23CK0116 · ₱75,605,879.15 · mapped
- REHABILITATION OF EXISTING DIKE ALONG LUCUNG RIVER, PHASE 1, (MALUPA SECTION, RIGHT BANK), CONCEPCION, TARLAC25CK0017 · ₱74,232,143.73 · mapped
- Construction of Groundsill with Reinforced Concrete Slope Protection Structure along Parua River, Downstream of Sta. Rita Bridge (Phase 1), Concepcion,Tarlac23CK0011 · ₱72,362,396.98 · mapped
- ASSET PRESERVATION PROGRAM-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS, OLONGAPO-BUGALLON RD., K0133+040, K0133+223.30, K0133+305.15, K0133+353.70, K0133+404.45, K0133+550, K0135+300, K0135+332, K0135+372.70, SUB24CM0009 · ₱69,479,990.16 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS OLONGAPO-BUGALLON RD - K0167+000 - K0167+175.50, K0177+355 - K0177+924, K0224+000 - K0224+562, K0242+524 - K0243+900, SAN FELIPE, CABANGAN, PALAUIG, CANDELARIA, ZAMBALES24CL0041 · ₱58,355,824.04 · mapped
- ASSET PRESERVATION PROGRAM: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROAD ALONG CONCEPCION - LA PAZ ROAD, LA PAZ, TARLAC24CK0010 · ₱49,412,212.21 · mapped
- CONCRETING OF BANTAY CARMEN TO SAGPAT FMR, BRGY. MALOMA, SAN FELIPE, ZAMBALES25CL0183 · ₱49,053,437.76 · mapped
- Rehabilitation of Existing Bank along O'Donnell River (Bueno Section, Left Bank), Capas, Tarlac22CK0055 · ₱48,998,948.62 · mapped
- REHABILITATION OF EXISTING BANK ALONG RIO CHICO RIVER (RIZAL SECTION, RIGHT BANK), STA. 2+836.80 TO STA. 3+089.30, LA PAZ, TARLAC22CK0059 · ₱48,996,890.96 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BAYTO RIVER, NORTH APPROACH, SANTA CRUZ, ZAMBALES23CL0022 · ₱48,996,668.98 · mapped
- REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG RIO CHICO RIVER (RIZAL SECTION, LEFT BANK), LA PAZ, TARLAC21CK0095 · ₱48,996,429.52 · mapped
- CONSTRUCTION OF STO. TOMAS RIVER FLOOD CONTROL STRUCTURE PACKAGE 3, BARANGAY OMAYA, SAN NARCISO, ZAMBALES23CL0068 · ₱48,757,372.75 · mapped
- Rehabilitation of Existing Bank along Lucung River (Cafe Section, Right Bank), Concepcion, Tarlac22CK0069 · ₱47,916,435.66 · mapped
- CONVERGENCE & SPL. SUPP. PROG.-CONST./IMPR'VT. OF VARIOUS INFRA. IN SUPPORT OF NAT'L. SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROG.-TIKAS) CONST. OF COMPANY BARRACKS, 69TH INFANTRY BATALLION, PHILIPPINE ARMY, BRGY. POONBATO-CABA25C00524 · ₱47,783,642.18
- CONVERGENCE & SPL. SUPP. PROG.-CONST./IMPR'VT. OF VARIOUS INFRA. IN SUPPORT OF NAT'L. SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROG.-TIKAS) CONST. OF ADMIN. BLDG. AT 69TH INFANTRY BATALLION, PHILIPPINE ARMY, BRGY. POONBATO-CABATUA25C00527 · ₱47,779,582.80
- Rehabilitation of Existing dike along Lucung River (Magao Section, Right Bank), Concepcion, Tarlac23CK0043 · ₱47,696,993.30 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANCAL-SAN ISIDRO-MAMBOG RIVER (TOTUN LANUM) PHASE 2, SITIO TAMBAK, (NORTH SIDE), BARANGAY PALANGINAN, IBA, ZAMBALES24CL0126 · ₱47,579,271.30 · mapped
- Construction of Flood Control Structure along Bancal-San Isidro-Mambog River (Totun Lanum) Phase 3, Sitio Tambak, (North Side), Barangay Palanginan, Iba, Zambales24CL0127 · ₱47,579,211.86 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONST./IMPR'VT. OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM-TIKAS), CONST. OF HEADQUARTERS NAVAL EDUC. TRNG. & DOCTRINE COMMAND, NSLG,24C00440 · ₱47,428,465.56
- REHABILITATION OF EXISTING BANK ALONG BANGUT RIVER (STA. LUCIA SECTION, LEFT BANK), CAPAS, TARLAC22CK0068 · ₱47,346,811.35 · mapped
- Rehabilitation of Existing dike along O'donnell River, Barangay Bueno Section, Left Bank, Capas, Tarlac23CK0044 · ₱47,188,039.20 · mapped
- Rehabilitation of Existing Dike along Lucung River (Malupa Section, Left Bank), Sta. 1+637 to Sta. 1+674 and Sta. 2+196 to Sta. 2+376, Concepcion, Tarlac24CK0027 · ₱46,749,922.54 · mapped
- Rehabilitation of Existing Dike along Parua River (Balutu Section, Right Bank), Sta. 14+253 to Sta. 14+443, Concepcion, Tarlac24CK0028 · ₱46,736,249.12 · mapped
- REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG O'DONNELL RIVER (MARUGLO SECTION, RIGHT BANK), CAPAS, TARLAC18CK0157 · ₱46,078,346.73 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BAYTO RIVER (UPSTREAM NORTH APPROACH PHASE I), STA. CRUZ, ZAMBALES23CL0023 · ₱44,074,442.58 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, ZNHS, ZONE 6, IBA, ZAMBALES24CL0092 · ₱42,910,937.51 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: I. CONSTRUCTION OF MULTI-PURPOSE BUILDING CONCEPCION MUNICIPAL, CONCEPCION, TARLAC II. CONSTRUCTION OF CONCEPCION MUNICIP23CK0079 · ₱39,600,000.00 · mapped
- CONSTRUCTION OF THE NEW MUNICIPAL HALL, PHASE 2, IBA, ZAMBALES22CL0065 · ₱39,199,995.43 · mapped
- CONSTRUCTION OF MULTI-PURPOSE FACILITY, CALIGUIT, BARANGAY DIRITA, IBA, ZAMBALES24CL0193 · ₱39,060,101.97 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS IBA-BOTOLAN BYPASS ROAD, IBA, ZAMBALES24CL0084 · ₱38,747,022.65
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS IBA-BOTOLAN, ZAMBALES (PHASE 3)23CL0175 · ₱38,095,295.00 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP): NEW CLARK CITY TO TARLAC - ZAMBALES ROAD VIA KALANGITAN ROAD, CAPAS, TARLAC23CK0010 · ₱34,297,539.43 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS OLONGAPO-BUGALLON RD - K0179 + 156 - K0179 + 390, K0215 + 000 - K0215 + 500, K0223 + 725 - K0224 + 000, K0241 + 920 - K0242 + 524, CABANGAN, PALAUIG, CANDELARIA, ZAMBALES25CL0140 · ₱32,640,162.48 · mapped
- CONSTRUCTION OF CLASSROOMS, 2 STOREY, 6-CLASSROOM, KALALAKE ELEMENTARY SCHOOL, KALALAKE, OLONGAPO CITY23CM0083 · ₱29,999,868.07 · mapped
- Rehabilitation of Existing Bank along Parua River (Banaba Section), Bamban, Tarlac22CK0109 · ₱29,699,966.66 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF ROAD AT BARANGAY KALAKLAN, O.C.24CM0031 · ₱29,399,999.97 · mapped
- REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG LUCUNG RIVER (OLD LUCUNG LILIBANGAN & MAGAO SECTION), CONCEPCION, TARLAC20CK0081 · ₱29,398,577.64 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP): MACARTHUR HIGHWAY TO NEW CLARK CITY VIA KALANGITAN ROAD, CAPAS, TARLAC23CK0009 · ₱29,397,509.67 · mapped
- NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - TERTIARY ROADS ALONG BAMBAN POBLACION ROAD, BAMBAN, TARLAC23CK0005 · ₱29,350,537.48 · mapped
- CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF SAN MARCELINO MULTI-PURPOSE BUILDING INCLUDING FACILITIES PHASE 2, SAN MARCELINO, ZAMBALES25CM0071 · ₱29,306,934.64 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROAD - CONSTRUCTION/REHABILITATION OF ELICAÑO STREETFROM E-21 STREET TO THE STEEL BRIDGE, OLONGAPO CITY, ZAMBALES21CM0072 · ₱29,245,973.09 · mapped
- CONSTRUCTION OF ACADEMIC BLDG. FOR COLLEGE OF MARINE ENGINEERING PMMA, SAN NARCISO, ZAMBALES24CL0111 · ₱28,981,208.55 · mapped
- FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, REHABILITATIONOF SACATIHAN RIVER, SUBIC, ZAMBALES20CM0029 · ₱28,314,245.27 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →