CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANCAL-SAN ISIDRO-MAMBOG RIVER (TOTUN LANUM) PHASE 2, SITIO TAMBAK, (NORTH SIDE), BARANGAY PALANGINAN, IBA, ZAMBALES
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANCAL-SAN ISIDRO-MAMBOG RIVER (TOTUN LANUM) PHASE 2, SITIO TAMBAK, (NORTH SIDE), BARANGAY PALANGINAN, IBA, ZAMBALES is a DPWH-tracked public work in Zambales 1st DEO, Region III. Reported contract value: ₱47,579,271.30. Status: Reported complete (DPWH). Contractor on record: RAIK CONST AND DEVELOPMENT CORP FORMERLY: RAIK CONST AND SUPPLY. Figures trace to dpwh.
Total Contract Cost