ADSL CONST is listed as a company organization in Philippine public procurement records on this site, with 101 linked DPWH project(s) totaling about ₱5,047,835,342.19. Recorded delivery grade F (from public DPWH project records — not a finding of wrongdoing).
ADSL CONST
FGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 101
- Total value
- ₱5,047,835,342.19
- Published flags
- 0
- Region
- Bulacan 3rd DEO · Region III
Public Record Grade
A transparent, data-derived summary of reported public records for ADSL CONST — not an accusation or finding of wrongdoing.
Score: 59.60 / 100 · Projects in sample: 101 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 22.6/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 22.6
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 30
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 83
- pastTargetOngoingProjects
- 52
- undatedCompletedProjectsExcluded
- 8
- Termination rate
Component score: 97/100 · Weight: 24%
- totalProjects
- 101
- componentScore
- 97
- terminatedProjects
- 1
- terminationRatePct
- 1
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 100
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 101
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 101
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 47 of 97 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, BRGY. MULAWIN-BRGY. GENERAL ESCO, NAUJAN, OR. MINDORO25E00056 · ₱137,941,567.39 · mapped
- CONST./MAINT. OF FLOOD MITIGATION SRTRUCTURES AND DRAINAGE SYSTEM- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PJHASE 2, BRGY. MULAWIMN, NAUJAN, ORINTAL MINORO25E00055 · ₱137,919,875.02 · mapped
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 2, SAN MIGUEL, BULACAN25CP0002 · ₱133,694,353.12 · mapped
- ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 1, SAN MIGUEL, BULACAN25CP0001 · ₱133,667,416.72 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCT. ALONG ANYATAM-MAPANIQUE CREEK, PHASE 6, SAN ILDEFON24C00689 · ₱133,005,653.04 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCT. ALONG ANYATAM-MAPANIQUE CREEK, PHASE 7, SAN ILDEFON24C00690 · ₱128,320,197.05 · mapped
- CONVERGENCE & SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD CTRL. STRUCTURE ALONG ANYATAM-MAPANIQUE CREEK,PHASE 9,SAN ILDEFONSO,BUL.24C00692 · ₱114,039,392.87 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI- PURPOSE BUILDINGS/FACILITIES TO SUPPORT SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BULACAN AGRICULTURAL STATE COLLEGE, PHASE 1, SAN ILDEFONSO, BULACAN24C00676 · ₱97,613,284.49 · mapped
- CONSTRUCTION OF BANK PROTECTION/FLOOD CONTROL WORKS ALONG MARANGLA RIVER, BARANGAY SAN AGUSTIN, IBA, ZAMBALES24CL0132 · ₱96,499,938.91 · mapped
- CONSTRUCTION OF SLOPE PROTECTION PACKAGE 16 AT BOTOLAN-CAPAZ RD., BOTOLAN, ZAMBALES24CL0167 · ₱96,499,489.64 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 5, SAN NARCISO, ZAMBALES25CL0196 · ₱95,535,034.55 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 4, SAN NARCISO, ZAMBALES25CL0195 · ₱95,534,941.80 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 2, SAN NARCISO, ZAMBALES25CL0193 · ₱95,534,928.87 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 1, SAN NARCISO, ZAMBALES25CL0192 · ₱95,534,869.86 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) SOUTH APPROACH, PHASE 3, SAN NARCISO, ZAMBALES25CL0194 · ₱95,534,842.76 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 1, SAN NARCISO, ZAMBALES25CL0164 · ₱95,534,089.30 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 4, SAN NARCISO, ZAMBALES25CL0167 · ₱95,533,745.82 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 5, SAN NARCISO, ZAMBALES25CL0168 · ₱95,532,482.01 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 3, SAN NARCISO, ZAMBALES25CL0166 · ₱95,532,234.00 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 2, SAN NARCISO, ZAMBALES25CL0165 · ₱95,523,176.81 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239- SOLAR STREET LIGHTS INSTALLATION AND APPLICATION, STA. RITA-CAMIAS OLD ROAD SECTION, SAN MIGUEL, BULACAN25CP0051 · ₱95,225,238.73 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - SOLAR STREET LIGHTS INSTALLATION AND APPLICATION, MAHARLIKA HIGHWAY SECTION, SAN RAFAEL, BULACAN25CP0251 · ₱95,177,490.40
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF SLOPE REVETMENT STRUCTURE AT BARANGAY CAMACHILE, DONA REMEDIOS TRINIDAD, BULACAN24C00492 · ₱95,100,081.92 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239- SOLAR STREET LIGHTS INSTALLATION AND APPLICATION, SIBUL- BIAK NA BATO ROAD SECTION, SAN MIGUEL, BULACAN25CP0052 · ₱95,080,776.18 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239- SOLAR STREET LIGHTS INSTALLATION AND APPLICATION, OLD CAGAYAN VALLEY ROAD SECTION, SAN RAFAEL, BULACAN25CP0050 · ₱95,080,567.72 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG BULO RIVER CONTROL (BACK OF BUGA E/S), DOWNSTREAM SEGMENT 1, BRGY. BUGA, SAN MIGUEL, BULACAN25CP0036 · ₱95,047,520.62 · mapped
- FLOOD MANAGEMENT PROGRAM-CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE INCLUDING IMPROVEMENT OF WATERWAY ALONG MAASIM RIVER CTRL.(UPSTREAM),PUROK1 SEC., BRGY. BUBULONG MUNTI,SAN ILDEFONSO25CP0031 · ₱95,032,891.27 · mapped
- CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(DOWNSTREAM), BRGY. TUKOD, SAN RAFEL, BULAC25CP0095 · ₱95,032,800.53
- FLOOD MANAGEMENT PROG. - CONST. / MAINTENANCE OF FLOOD MITIGATION STRUCTS. AND DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION STRUCT. INCLUDING IMPROVEMENT OF WATERWAY ALONG MAASIM RIVER CONTROL, PUROK 3 SECTION, BARANGAY PASONG INTSIK, SAN RAFAEL, BULACAN25CP0033 · ₱95,032,794.80 · mapped
- CONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT.PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(UPSTREAM), BRGY. TUKOD, SAN RAFAEL, BULACAN25CP0094 · ₱95,032,714.62 · mapped
- FLOOD MANAGEMENT PROGRAM-CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. OF FLOOD MITIGATION STRUCTURE INCLUDING IMPROVEMENT OF WATERWAY ALONG MAASIM RIVER CONTROL (DOWNSTREAM),PUROK 1 SECTION,BRGY. BUBULONG MUNTI,SAN ILDEFON25CP0032 · ₱95,032,682.04 · mapped
- CONVERGENCE & SPECIAL SUPPORT PROG-SUST INFRAS. PROJS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUC. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST OF SLOPE PROTECTION ALONG MALANGAAN RIVER (PACKAGE D), BRGY CAMACHILE,DONA REMEDIOS TRINIDAD,BUL24C00683 · ₱95,032,658.23 · mapped
- FLOOD MANAGEMENT PROG.-CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTS. AND DRAINAGE SYSTEMS-CONST. OF FLOOD MITIGATION STRUCT. INCLUDING IMPROVEMENT OF WATERWAY ALONG BALAONG RIVER CONTROL (UPSTREAM PHASE), BARANGAY TALBAK, DONA REMEDIOS TRINIDAD, BULACAN25CP0034 · ₱95,032,469.88 · mapped
- CONVERGE. AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA.PROJS. ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION OF STUCTS. PRTOTECTING MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD MITIGATION STRUCT. ALONG SAN MIGUEL RIVER, SEGMENT A(SITIO MATAAS NA25CP0100 · ₱95,032,436.26 · mapped
- FLOOD MANAGEMENT PROG.-CONST./MAINT.OF FLOOD MITIGATION STRUCTS. AND DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION STRUCT. INCLUDING IMPROVEMENT OF WATERWAY ALONG BALAONG RIVER CONTROL (DOWNSTREAM PHASE), BARANGAY TALBAK, DONA REMEDIOS TRINIDAD, BULACAN25CP0035 · ₱95,032,297.40 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT A),SITIO25CP0090 · ₱95,004,087.08 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT B),SITIO25CP0091 · ₱95,003,665.55 · mapped
- CONSTRUCTION OF BREAKWATER (PHASE 2) AT BARANGAY PIPINDAN, BINANGONAN, RIZAL25D00160 · ₱94,570,584.22 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED LIGHTS INSTALLATION AND APPLICATION SAN ILDEFONSO SAN RAFAEL DAANG MAHARLIKA HIGHWAY, BULACAN SEGMENT 225CP0257 · ₱71,635,996.26
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT PROTECTION ALONG BULO RIVER, PUROK 1, BARANGAY MALIBAY, SAN MIGUEL, BULACAN25CP0045 · ₱71,303,501.23 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF REVETMENT PROTECTION ALONG MAASIM RIVER, PUROK 1 BARANGAY SAPANG PUTIK, SAN ILDEFONSO, BULACAN25CP0044 · ₱71,288,560.20 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER, BARANGAY BARITAN (DOWNSTREAM), SAN MIGUEL, BULACAN24C00108 · ₱48,249,217.60 · mapped
- CONSTRUCTION OF DPWH MAIN BUILDING (PHASE II), CAMARINES SUR 1ST DEO, RAGAY, CAMARINES SUR25FD0025 · ₱48,059,163.20 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER, BARANGAY PINAMBARAN(UPSTRAM), SAN MIGUEL, BULACAN24C00107 · ₱47,549,154.44 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER, BARANGAY BARITAN (UPSTREAM), SAN MIGUEL, BUL24C00109 · ₱47,549,007.46 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAASIM RIVER, SEGMENT A, PUROK 4, BARANGAY BAGONG BARRIO, SAN ILDEFONSO, BULACAN25C00384 · ₱47,527,741.08 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRA. PROGRAM-BIP-MULTI-PURPOSE BLDGS./FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BLDG. VEDASTO HIGH SCHOOL, BARANGAY SALACOT, SAN MIGUEL, BULACAN24C00539 · ₱39,004,288.16 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MALANGAAN RIVER, DONA REMEDIOS TRINIDAD, BULACAN25CP0040 · ₱38,012,654.30 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MALANGAAN RIVER (PHASE 2), BARANGAY TUKOD, DONA REMEDIOS TRINIDAD, BULACAN25CP0038 · ₱38,012,650.22 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MALANGAAN RIVER, BARANGAY TUKOD, DONA REMEDIOS TRINIDAD, BULACAN25CP0039 · ₱38,012,571.75 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →