Flood Control and Drainage25CP0090

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT A),SITIO

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCTURE ALONG MAASIM RIVER (SEGMENT A),SITIO is a DPWH-tracked public work in Bulacan 3rd DEO, Region III. Reported contract value: ₱95,004,087.08. Status: Past target date (DPWH On-Going). Contractor on record: ADSL CONST. Figures trace to dpwh.

Bulacan 3rd DEO, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Meycauayan River and its tributaries (Deca Homes Section), Barangay Saluysoy, Meycauayan City, Bulacan
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Bulacan 3rd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

F

101 projects · ₱5.0B total · 0 flags

Other projects by this contractor

No sat.

CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, BRGY. MULAWIN-BRGY. GENERAL ESCO, NAUJAN, OR. MINDORO

Region IV-B, Region IV-B

2025₱137.9M
Past target date (DPWH On-Going)
No sat.

CONST./MAINT. OF FLOOD MITIGATION SRTRUCTURES AND DRAINAGE SYSTEM- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PJHASE 2, BRGY. MULAWIMN, NAUJAN, ORINTAL MINORO

Region IV-B, Region IV-B

2025₱137.9M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 2, SAN MIGUEL, BULACAN

Bulacan 3rd DEO, Region III

2025₱133.7M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 1, SAN MIGUEL, BULACAN

Bulacan 3rd DEO, Region III

2025₱133.7M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCT. ALONG ANYATAM-MAPANIQUE CREEK, PHASE 6, SAN ILDEFON

Region III, Region III

2024₱133.0M
Ongoing (DPWH-reported)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCT. ALONG ANYATAM-MAPANIQUE CREEK, PHASE 7, SAN ILDEFON

Region III, Region III

2024₱128.3M
Ongoing (DPWH-reported)
View all 101 projects →

4. Implementation

Contract Amount

₱95,004,087.08

Progress

Past target date (DPWH On-Going)

Start Date

June 8, 2025

Target End

April 3, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.