Flood Control and Drainage25CL0151

CONSTRUCTION OF FLOOD ALLEVIATION STRUCTURE ALONG SANTO TOMAS RIVER (MACULCOL DIKE), PHASE 1, SAN NARCISO, ZAMBALES

CONSTRUCTION OF FLOOD ALLEVIATION STRUCTURE ALONG SANTO TOMAS RIVER (MACULCOL DIKE), PHASE 1, SAN NARCISO, ZAMBALES is a DPWH-tracked public work in Zambales 1st DEO, Region III. Reported contract value: ₱98,010,895.44. Status: Past target date (DPWH On-Going). Contractor on record: JTC CRUZ CONST CO INC. Figures trace to dpwh.

Zambales 1st DEO, Region III
Region: Region III

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2025 · ₱50,000

    Probable match · score 0.88

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱98,010,895 · JTC CRUZ CONST CO INC

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    99% reported · imagery 2024-02-21 → 2025-01-26

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Zambales

Based on the coordinates published with the DPWH record and NOAH file Zambales.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF FLOOD ALLEVIATION STRUCTURE ALONG SANTO TOMAS RIVER (MACULCOL DIKE), PHASE 1, SAN NARCISO, ZAMBALES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Riverbank Structure along Santo Tomas River (Omaya-Balingcaguing-Paite Section), San Narciso, Zambales (Phase 1)
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Zambales 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

25CL0151 - SANTO TOMAS RIVER (MACULCOL DIKE)PHASE1

₱98,010,895.44 · JTC CRUZ CONST CO INC

Contractor

B

154 projects · ₱8.5B total · 5 flags

4. Implementation

Contract Amount

₱98,010,895.44

Progress

Past target date (DPWH On-Going)

Start Date

April 3, 2025

Target End

February 26, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)ZambalesSan NarcisoPaite
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Co-May 2025Man-Yi 2024
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.