Construction of Libertad Flood Control Structure (Downstream), Libertad, Odiongan, Romblon
Construction of Libertad Flood Control Structure (Downstream), Libertad, Odiongan, Romblon is a DPWH-tracked public work in ODIONGAN (ROMBLON), ROMBLON, Region IV-B. Reported contract value: ₱109,372,135.00. Status: Reported complete (DPWH). Contractor on record: SCATR CONST. Figures trace to sumbong.
Total Contract Cost



