Awards Very Close to the Budget Ceiling
Contract cost is at or above 99.5% of ABC from Sumbong.
This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.
Indicator: Romblon District Engineering Office awarded 74 of 86 recorded flood-control contracts (86.0%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (15.6 percentage points higher; binomial p = 5.7e-04), across 19 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This pattern may result from consistently competitive bidding or careful cost estimation.
Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.
Romblon District Engineering Office: contracts
74 of 86 contracts (86%) at ≥99.5% of ABC · peer baseline 70.4% · gap +15.6 pts · binomial p = 5.7e-4. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).
| Contract | Title | Contractor | % of ABC | Source |
|---|---|---|---|---|
| 22E00146 | Construction of España Flood Control Structure (Phase 2), Brgy España, San Fernando, Romblon | LEGACY CONST CORP FORMERLY: LEGACY CONST | 102.53% | DPWH |
| 22EH0113 | Construction of Jun Carlo, Flood Control Structure (Upstream), San Andres, Romblon | ATHENA CONST AND DEVELOPMENT | 100.00% | DPWH |
| 21EH0093 | Construction of Seawall at Poblacion, Looc, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24EH0102 | Construction of Torre-Looban Flood Control Structure, Odionan, Romblon | ATHENA CONST AND DEVELOPMENT | 100.00% | DPWH |
| 24EH0069 | Improvement of Cantingas RIS Drainage System, San Fernando, Romblon | R G FLORENTINO CONST & TRADING INC | 100.00% | DPWH |
| 22EH0016 | Construction of Calunacon Causeway, San Andres, Romblon | ROLCO CONST & DEVELOPMENT CORP FOR / SCATR CONST | 100.00% | DPWH |
| 23EH0085 | Construction of Doña Juana Flood Control Structure along Tablas Circumferential Road, San Agustin, Romblon | LEGACY CONST CORP FORMERLY: LEGACY CONST | 100.00% | DPWH |
| 21EH0080 | Construction of Shore Protection/Causeway leading to Poctoy Port, Odiongan, Romblon | ROLCO CONST & DEVELOPMENT CORP FOR | 100.00% | DPWH |
| 24EH0070 | Construction of Flood Control Structure, Sitio Suong Brgy.Carmen, San Agustin, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 21EH0053 | Construction of Carmen Shore Protection/Causeway Phase 2, San Agustin, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24EH0080 | Construction of Mainit (DS - LS), Flood Control Structure, Odiongan, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24EH0084 | Construction of Flood Control Structure along David Bridge Upstream (L/S), Odiongan, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24EH0063 | Construction of Flood Control Structure, Mayha River Upstream (L/S), Odiongan, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 22EH0153 | Construction of Bachawan (I - Laya) Bank Slope Protection along Tablas Circumferential Road, San Agustin, Romblon (Phase 2) | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24EH0099 | Construction of Libertad Flood Control Structure (Downstream), Libertad, Odiongan, Romblon | SCATR CONST | 100.00% | DPWH |
| 24EH0074 | Construction of Flood Control Structure along Mayha River (Phase 2), Odiongan, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24EH0088 | Construction of Shore Protection/Causeway/Breakwater along Bachawan Feeder Port, San Agustin, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24EH0071 | Construction of Flood Control Structure, Sitio Agcahico Brgy.Carmen, San Agustin, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24EH0072 | Construction of River Control at Mayor River, Binonga-an, San Agustin, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24EH0081 | Construction of Mainit (DS - RS ) Flood Control Structure, Odiongan, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24EH0065 | Construction of Gabawan River Control along Bulwang-Upstream(B/S) Phase 3, Odiongan, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 23EH0100 | Construction of Flood Mitigation Structures and Drainage Systems - Construction of Carmen Shore Protection/Causeway, San Agustin, Romblon Phase 3 | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24EH0064 | Construction of Gabawan River Control along Bulwang Upstream (B/S) Phase 2, Odiongan Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24EH0087 | Construction of Ilaya Buli River Control, Sitio Ilaya, Brgy. Buli, San Agustin, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 23EH0062 | Construction of Seawall along Agutay, Magdiwang, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24EH0109 | Construction of Flood Mitigation Structure along Limon Sur (Phase 2), Looc, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24EH0103 | Construction of Ayog-og Flood Control Structure (Upstream) B/S, Bachawan, San Agustin, Romblon | EMQ DESIGN & CONST | 100.00% | DPWH |
| 22EH0019 | Construction/Rehabilitation of Dulangan Flood Mitigating Structure (Upstream) along Dulangan River Control, Magdiwang, Romblon | E R DELA CRUZ CONST & SUPPLY | 100.00% | DPWH |
| 23E00198 | Construction of Dubduban Flood Control Structure, San Agustin, Tablas Island Romblon | LEGACY CONST CORP FORMERLY: LEGACY CONST | 100.00% | DPWH |
| 22E00136 | Construction of Tuguis Flood Control Structure (Phase 2) along Looc- Cogon - Tulay Odiongan Road, Brgy. Progreso Este, Odiongan, Romblon | LEGACY CONST CORP FORMERLY: LEGACY CONST | 100.00% | DPWH |
| 22EH0052 | Construction of Sawang Flood Mitigationf Structrure (Upstream), Romblon, Romblon | MT GUITING-GUITING CONST | 100.00% | DPWH |
| 22EH0033 | Construction/Rehabilitation of Pag-Alad Flood Mitigating Structure along Parpagoha River Control, San Andres, Romblon | ROLCO CONST & DEVELOPMENT CORP FOR / SCATR CONST | 100.00% | DPWH |
| 22EH0147 | Construction of Seawall in Brgy. Vicente, Concepcion, Romblon | SIM CONST TRADING AND SERVICES | 100.00% | DPWH |
| 22EH0036 | Construction of Palo-o Flood Control Structure, Odiongan, Romblon | ATHENA CONST AND DEVELOPMENT | 100.00% | DPWH |
| 24EH0104 | Construction of Batiano Flood Control Phase 2 (Downstream), Batiano, Odioangan, Romblon | SCATR CONST | 100.00% | DPWH |
| 23EH0078 | Construction of Pag-Alad Flood Mitigating Structure (Phase 2) along Parpagoha River Control, San Andres, Romblon | MRRM TRADING & CONST / KPSL GEN CONTRACTOR INC | 100.00% | DPWH |
| 22E00150 | Construction (Completion) of River Control Structure and Drainage System, Bangon River Control, Tablas Island, Romblon | LEGACY CONST CORP FORMERLY: LEGACY CONST | 100.00% | DPWH |
| 24EH0111 | Construction of Flood Mitigation Structure - Construction of Dubduban River Control (Phase 2), San Agustin, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24EH0110 | Construction of Flood Mitigation Structure, Dubduban River, Package 2, San Agustin, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24EH0108 | Construction of Flood Mitigation Structure along Limon Sur (Phase 1), Looc, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 24E00118 | Construction of River Control Structure along Pagpagoha River, Upstream, Tablas Island, Romblon | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 100.00% | DPWH |
| 24EH0098 | Construction of Panique Flood Control along Panique Br. I, Panique, Odiongan, Romblon | SCATR CONST | 100.00% | DPWH |
| 22EH0042 | Construction of Banton Poblacion Shore Protection / Causeway Extension, Banton, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 22EH0061 | Construction of Ilaya-Ayog-og Flood Control Structure Phase II, San Agustin, Romblon | EMQ DESIGN & CONST | 100.00% | DPWH |
| 22EH0035 | Construction of Bulwang-Gabawan Fllod Control Structure, Odiongan, Romblon | R N V CONST | 100.00% | DPWH |
| 23EH0016 | Construction of Bañadero Flood Control Structure along Tablas Circumferential Road (Downstream), Calatrava, Romblon | R G FLORENTINO CONST & TRADING INC | 100.00% | DPWH |
| 24EH0107 | Construction of Canlumay Flood Control Structure, Odiongan, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 100.00% | DPWH |
| 23E00197 | Construction of Mayha - Rizal Flood Control Structure, Tablas Island Romblon | LEGACY CONST CORP FORMERLY: LEGACY CONST | 100.00% | DPWH |
| 22EH0032 | Construction of Agbunyog Flood Control along Tablas Circumferential Road (B/S), Sta. 0+271 - Sta. 0+698 (R/S), Sta. 0+470 - Sta. 0+510 (L/S), Sta. 0+525 - Sta. | LEGACY CONST CORP FORMERLY: LEGACY CONST | 100.00% | DPWH |
| 23EH0020 | Construction of Flood Mitigating Structure along Gabawan Bridge (Upstream R/S), Odiongan, Romblon | ROLCO CONST & DEVELOPMENT CORP FOR | 100.00% | DPWH |
| 24EH0105 | Construction of Pag-alad to Jun Carlo Flood Control Structure, San Andres, Romblon | ROLCO CONST & DEVELOPMENT CORP FOR | 100.00% | DPWH |
| 23EH0018 | Construction of Sigkop Flood Mitigating Structure, Progreso Este, Odiongan, Romblon | ROLCO CONST & DEVELOPMENT CORP FOR | 100.00% | DPWH |
| 24EH0114 | Construction of Carmen Flood Control Structure Phase 2, San Agustin, Romblon | ROLCO CONST & DEVELOPMENT CORP FOR / SIM CONST TRADING AND SERVICES | 100.00% | DPWH |
| 23EH0058 | Construction of Calunacon Flood Control Structure along Tablas Circumferential Road (Phase 3), San Andres, Romblon | ROLCO CONST & DEVELOPMENT CORP FOR | 99.99% | DPWH |
| 23EH0021 | Construction of Campalingo Flood Control Structure along Sibuyan Circumferential Road (Upstream and Downtream), San Fernando, Romblon | ROLCO CONST & DEVELOPMENT CORP FOR | 99.99% | DPWH |
| 23EH0017 | Construction of Batiano Flood Control Structure along Tablas Circumferential Road (Downstream), Odiongan, Romblon | R G FLORENTINO CONST & TRADING INC | 99.99% | DPWH |
| 22EH0063 | Construction of Lunas Flood Mitigating Structure (Downstream), Romblon, Romblon | EMQ DESIGN & CONST | 99.99% | DPWH |
| 22E00151 | Construction of River Control Structure and Drainage System, Cambajao River Control, Sibuyan Island, Romblon (Phase 2) | LEGACY CONST CORP FORMERLY: LEGACY CONST | 99.99% | DPWH |
| 23EH0084 | Construction of Bonlao Flood Control Structure along Tablas Circumferential Road, Phase 2, Alcantara, Romblon | ULTIMATE BUILDER'S & CONST SUPPLY | 99.99% | DPWH |
| 23EH0082 | Construction of Carmen Flood Control, San Agustin, Romblon | EMQ DESIGN & CONST | 99.99% | DPWH |
| 23EH0083 | Construction of Flood Mitigating Structures along Gabawan Dam Site, Gabawan Odiongan | R N V CONST | 99.99% | DPWH |
| 23EH0119 | Construction of Jun Carlo Flood Control, San Andres, Romblon | ROLCO CONST & DEVELOPMENT CORP FOR / TABLAS MEGA CONST | 99.99% | DPWH |
| 23EH0081 | Construction of Camantaya Flood Control, San Agustin, Romblon | EMQ DESIGN & CONST | 99.99% | DPWH |
| 23EH0019 | Construction of Pag-asa Flood Mitigating Structure, Odiongan, Romblon | R N V CONST | 99.98% | DPWH |
| 22EH0015 | Construction of Batiano Boulevard Flood Mitigating Structure, Odiongan, Romblon | ROLCO CONST & DEVELOPMENT CORP FOR | 99.98% | DPWH |
| 22EH0056 | Construction of Mabulo Flood Control Structure (Upstream), San Fernando, Romblon | MT GUITING-GUITING CONST | 99.98% | DPWH |
| 24EH0112 | Construction of Baito Flood Control Structure Phase 2, Poctoy, Odiongan, Romblon | SCATR CONST | 99.98% | DPWH |
| 22E00057 | Construction of Pili Flood Control Structure (Phase 2), Looc, Romblon | LEGACY CONST CORP FORMERLY: LEGACY CONST | 99.98% | DPWH |
| 22E00144 | Construction of Tuguis Flood Control Structures along Looc (Cogon Tulay)-Odiongan Road, Barangay Progreso Este, Odiongan, Romblon | ASHLEYKA CONST AND SUPPLIES | 99.96% | DPWH |
| 22EH0149 | Construction of Seawall, Brgy. Masudsud, Sitio Proper, Concepcion, Romblon | SIM CONST TRADING AND SERVICES | 99.93% | DPWH |
| 22EH0064 | Construction of Poblacion San Agustin, Flood Interceptor, San Agustin, Romblon | ULTIMATE BUILDER'S & CONST SUPPLY | 99.93% | DPWH |
| 22EH0006 | Construction of Flood Mitigation Structure along Panique River (Phase 2), Odiongan, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 99.90% | DPWH |
| 21E00075 | Construction of Jao-asan Flood Control, Jao-asan, Magdiwang, Romblon | LEGACY CONST CORP FORMERLY: LEGACY CONST | 99.87% | DPWH |
| 22EH0018 | Construction of Bariri Slope Protection Structure (Phase II), Sitio Bariri, Hinag-oman, Ferrol, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 99.81% | DPWH |
| 22EH0047 | Construction of Bonlao Flood Control Structure along Tabllas Circumferential Road, Alcantara, Romblon | ULTIMATE BUILDER'S & CONST SUPPLY | 99.43% | DPWH |
| 22EH0017 | Construction of Flood Mitigation Structure along Budiong River (Phase 2), Odiongan, Romblon | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 99.40% | DPWH |
| 22EH0148 | Construction of Seawall, Brgy. Calabasahan, Concepcion, Romblon | SIM CONST TRADING AND SERVICES | 98.50% | DPWH |
| 22EH0004 | Construction of Tuburan Flood Control Structure (Upstream), Tuburan, Odiongan, Romblon | ROLCO CONST & DEVELOPMENT CORP FOR | 98.47% | DPWH |
| 22EH0022 | Construction/Rehabilitation of Dulangan Flood Mitigating Structure (Downstream) along Dulangan River Control, Magdiwang, Romblon | R G FLORENTINO CONST & TRADING INC | 98.45% | DPWH |
| 22EH0005 | Construction of Panique (Upstream) Flood Control Structure Phase 2, Odiongan, Romblon | ROLCO CONST & DEVELOPMENT CORP FOR | 98.45% | DPWH |
| 21E00076 | Construction of Pili Flood Control, Looc, Romblon | LEGACY CONST CORP FORMERLY: LEGACY CONST | 64.27% | DPWH |
| 21E00079 | Construction of Tuguis Flood Control along Looc (Cogon-Tulay) Odiongan Road, Brgy Progreso Este, Odiongan, Romblon | LEGACY CONST CORP FORMERLY: LEGACY CONST / FFJJ CONST | 49.97% | DPWH |
| 21E00079 | Construction of Tuburan Flood Control, Tuburan, Odiongan, Romblon | LEGACY CONST CORP FORMERLY: LEGACY CONST / FFJJ CONST | 49.95% | DPWH |
| 22E00145 | Construction of Danao Flood Control Structure (Phase 2), Magdiwang, Romblon | ASHLEYKA CONST AND SUPPLIES | 49.12% | DPWH |
| 22E00145 | Construction of Ituralba Flood Control Structure (Phase 2), Magdiwang, Romblon | ASHLEYKA CONST AND SUPPLIES | 49.12% | DPWH |
| 21E00076 | Construction of Cabulutan Flood Control, Cabulutan, San Agustin,Romblon | LEGACY CONST CORP FORMERLY: LEGACY CONST | 35.70% | DPWH |
Named in this indicator? Respond or report an error · Corrections policy
Project completion
Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.
Completion schedule is shown for project and contractor flags only.
Rule Definition
ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.
Triggering Data & citations
Implementing office awards near-ABC contracts far more often than the flood-control baseline
{
"office": "Romblon District Engineering Office",
"nearAbc": 74,
"trigger": "office_pattern_aggregate",
"officeId": "92e74478-8d38-5585-907b-4def85221c0c",
"threshold": 0.995,
"binomialTailP": 0.0005694347981498294,
"nearAbcRatePct": 86,
"totalContracts": 86,
"baselineRatePct": 70.4,
"excessPctPoints": 15.6,
"expectedNearAbc": 60.5,
"baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}Source documents