Love the Philippines

Indicator worth a closer look. Not an accusation or a finding of wrongdoing.

Ito ay istatistikong anomalya o indikador na dapat suriin — hindi patunay ng maling gawain, pandaraya, o katiwalian laban sa sinumang tao.

AI-verified / Na-verify ng AI Data as of October 22, 2026

Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: Romblon District Engineering Office awarded 74 of 86 recorded flood-control contracts (86.0%) at 99.5% or more of their Approved Budget for the Contract, versus 70.4% for flood-control contracts nationwide (15.6 percentage points higher; binomial p = 5.7e-04), across 19 contractors. Source: DPWH / Sumbong sa Pangulo contract records; each contract is listed below. This pattern may result from consistently competitive bidding or careful cost estimation.

Public record entityData not yet available
Location—
AmountData not yet available sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Romblon District Engineering Office: contracts

74 of 86 contracts (86%) at ≥99.5% of ABC · peer baseline 70.4% · gap +15.6 pts · binomial p = 5.7e-4. Source: DPWH transparency portal and Sumbong sa Pangulo records (linked per contract).

ContractTitleContractor% of ABCSource
22E00146Construction of España Flood Control Structure (Phase 2), Brgy España, San Fernando, RomblonLEGACY CONST CORP FORMERLY: LEGACY CONST102.53%DPWH
22EH0113Construction of Jun Carlo, Flood Control Structure (Upstream), San Andres, RomblonATHENA CONST AND DEVELOPMENT100.00%DPWH
21EH0093Construction of Seawall at Poblacion, Looc, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24EH0102Construction of Torre-Looban Flood Control Structure, Odionan, RomblonATHENA CONST AND DEVELOPMENT100.00%DPWH
24EH0069Improvement of Cantingas RIS Drainage System, San Fernando, RomblonR G FLORENTINO CONST & TRADING INC100.00%DPWH
22EH0016Construction of Calunacon Causeway, San Andres, RomblonROLCO CONST & DEVELOPMENT CORP FOR / SCATR CONST100.00%DPWH
23EH0085Construction of Doña Juana Flood Control Structure along Tablas Circumferential Road, San Agustin, RomblonLEGACY CONST CORP FORMERLY: LEGACY CONST100.00%DPWH
21EH0080Construction of Shore Protection/Causeway leading to Poctoy Port, Odiongan, RomblonROLCO CONST & DEVELOPMENT CORP FOR100.00%DPWH
24EH0070Construction of Flood Control Structure, Sitio Suong Brgy.Carmen, San Agustin, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
21EH0053Construction of Carmen Shore Protection/Causeway Phase 2, San Agustin, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24EH0080Construction of Mainit (DS - LS), Flood Control Structure, Odiongan, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24EH0084Construction of Flood Control Structure along David Bridge Upstream (L/S), Odiongan, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24EH0063Construction of Flood Control Structure, Mayha River Upstream (L/S), Odiongan, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
22EH0153Construction of Bachawan (I - Laya) Bank Slope Protection along Tablas Circumferential Road, San Agustin, Romblon (Phase 2)SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24EH0099Construction of Libertad Flood Control Structure (Downstream), Libertad, Odiongan, RomblonSCATR CONST100.00%DPWH
24EH0074Construction of Flood Control Structure along Mayha River (Phase 2), Odiongan, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24EH0088Construction of Shore Protection/Causeway/Breakwater along Bachawan Feeder Port, San Agustin, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24EH0071Construction of Flood Control Structure, Sitio Agcahico Brgy.Carmen, San Agustin, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24EH0072Construction of River Control at Mayor River, Binonga-an, San Agustin, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24EH0081Construction of Mainit (DS - RS ) Flood Control Structure, Odiongan, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24EH0065Construction of Gabawan River Control along Bulwang-Upstream(B/S) Phase 3, Odiongan, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
23EH0100Construction of Flood Mitigation Structures and Drainage Systems - Construction of Carmen Shore Protection/Causeway, San Agustin, Romblon Phase 3SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24EH0064Construction of Gabawan River Control along Bulwang Upstream (B/S) Phase 2, Odiongan RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24EH0087Construction of Ilaya Buli River Control, Sitio Ilaya, Brgy. Buli, San Agustin, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
23EH0062Construction of Seawall along Agutay, Magdiwang, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24EH0109Construction of Flood Mitigation Structure along Limon Sur (Phase 2), Looc, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24EH0103Construction of Ayog-og Flood Control Structure (Upstream) B/S, Bachawan, San Agustin, RomblonEMQ DESIGN & CONST100.00%DPWH
22EH0019Construction/Rehabilitation of Dulangan Flood Mitigating Structure (Upstream) along Dulangan River Control, Magdiwang, RomblonE R DELA CRUZ CONST & SUPPLY100.00%DPWH
23E00198Construction of Dubduban Flood Control Structure, San Agustin, Tablas Island RomblonLEGACY CONST CORP FORMERLY: LEGACY CONST100.00%DPWH
22E00136Construction of Tuguis Flood Control Structure (Phase 2) along Looc- Cogon - Tulay Odiongan Road, Brgy. Progreso Este, Odiongan, RomblonLEGACY CONST CORP FORMERLY: LEGACY CONST100.00%DPWH
22EH0052Construction of Sawang Flood Mitigationf Structrure (Upstream), Romblon, RomblonMT GUITING-GUITING CONST100.00%DPWH
22EH0033Construction/Rehabilitation of Pag-Alad Flood Mitigating Structure along Parpagoha River Control, San Andres, RomblonROLCO CONST & DEVELOPMENT CORP FOR / SCATR CONST100.00%DPWH
22EH0147Construction of Seawall in Brgy. Vicente, Concepcion, RomblonSIM CONST TRADING AND SERVICES100.00%DPWH
22EH0036Construction of Palo-o Flood Control Structure, Odiongan, RomblonATHENA CONST AND DEVELOPMENT100.00%DPWH
24EH0104Construction of Batiano Flood Control Phase 2 (Downstream), Batiano, Odioangan, RomblonSCATR CONST100.00%DPWH
23EH0078Construction of Pag-Alad Flood Mitigating Structure (Phase 2) along Parpagoha River Control, San Andres, RomblonMRRM TRADING & CONST / KPSL GEN CONTRACTOR INC100.00%DPWH
22E00150Construction (Completion) of River Control Structure and Drainage System, Bangon River Control, Tablas Island, RomblonLEGACY CONST CORP FORMERLY: LEGACY CONST100.00%DPWH
24EH0111Construction of Flood Mitigation Structure - Construction of Dubduban River Control (Phase 2), San Agustin, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24EH0110Construction of Flood Mitigation Structure, Dubduban River, Package 2, San Agustin, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24EH0108Construction of Flood Mitigation Structure along Limon Sur (Phase 1), Looc, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
24E00118Construction of River Control Structure along Pagpagoha River, Upstream, Tablas Island, RomblonYPR GEN CONTRACTOR AND CONST SUPPLY INC100.00%DPWH
24EH0098Construction of Panique Flood Control along Panique Br. I, Panique, Odiongan, RomblonSCATR CONST100.00%DPWH
22EH0042Construction of Banton Poblacion Shore Protection / Causeway Extension, Banton, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
22EH0061Construction of Ilaya-Ayog-og Flood Control Structure Phase II, San Agustin, RomblonEMQ DESIGN & CONST100.00%DPWH
22EH0035Construction of Bulwang-Gabawan Fllod Control Structure, Odiongan, RomblonR N V CONST100.00%DPWH
23EH0016Construction of Bañadero Flood Control Structure along Tablas Circumferential Road (Downstream), Calatrava, RomblonR G FLORENTINO CONST & TRADING INC100.00%DPWH
24EH0107Construction of Canlumay Flood Control Structure, Odiongan, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP100.00%DPWH
23E00197Construction of Mayha - Rizal Flood Control Structure, Tablas Island RomblonLEGACY CONST CORP FORMERLY: LEGACY CONST100.00%DPWH
22EH0032Construction of Agbunyog Flood Control along Tablas Circumferential Road (B/S), Sta. 0+271 - Sta. 0+698 (R/S), Sta. 0+470 - Sta. 0+510 (L/S), Sta. 0+525 - Sta. LEGACY CONST CORP FORMERLY: LEGACY CONST100.00%DPWH
23EH0020Construction of Flood Mitigating Structure along Gabawan Bridge (Upstream R/S), Odiongan, RomblonROLCO CONST & DEVELOPMENT CORP FOR100.00%DPWH
24EH0105Construction of Pag-alad to Jun Carlo Flood Control Structure, San Andres, RomblonROLCO CONST & DEVELOPMENT CORP FOR100.00%DPWH
23EH0018Construction of Sigkop Flood Mitigating Structure, Progreso Este, Odiongan, RomblonROLCO CONST & DEVELOPMENT CORP FOR100.00%DPWH
24EH0114Construction of Carmen Flood Control Structure Phase 2, San Agustin, RomblonROLCO CONST & DEVELOPMENT CORP FOR / SIM CONST TRADING AND SERVICES100.00%DPWH
23EH0058Construction of Calunacon Flood Control Structure along Tablas Circumferential Road (Phase 3), San Andres, RomblonROLCO CONST & DEVELOPMENT CORP FOR99.99%DPWH
23EH0021Construction of Campalingo Flood Control Structure along Sibuyan Circumferential Road (Upstream and Downtream), San Fernando, RomblonROLCO CONST & DEVELOPMENT CORP FOR99.99%DPWH
23EH0017Construction of Batiano Flood Control Structure along Tablas Circumferential Road (Downstream), Odiongan, RomblonR G FLORENTINO CONST & TRADING INC99.99%DPWH
22EH0063Construction of Lunas Flood Mitigating Structure (Downstream), Romblon, RomblonEMQ DESIGN & CONST99.99%DPWH
22E00151Construction of River Control Structure and Drainage System, Cambajao River Control, Sibuyan Island, Romblon (Phase 2)LEGACY CONST CORP FORMERLY: LEGACY CONST99.99%DPWH
23EH0084Construction of Bonlao Flood Control Structure along Tablas Circumferential Road, Phase 2, Alcantara, RomblonULTIMATE BUILDER'S & CONST SUPPLY99.99%DPWH
23EH0082Construction of Carmen Flood Control, San Agustin, RomblonEMQ DESIGN & CONST99.99%DPWH
23EH0083Construction of Flood Mitigating Structures along Gabawan Dam Site, Gabawan OdionganR N V CONST99.99%DPWH
23EH0119Construction of Jun Carlo Flood Control, San Andres, RomblonROLCO CONST & DEVELOPMENT CORP FOR / TABLAS MEGA CONST99.99%DPWH
23EH0081Construction of Camantaya Flood Control, San Agustin, RomblonEMQ DESIGN & CONST99.99%DPWH
23EH0019Construction of Pag-asa Flood Mitigating Structure, Odiongan, RomblonR N V CONST99.98%DPWH
22EH0015Construction of Batiano Boulevard Flood Mitigating Structure, Odiongan, RomblonROLCO CONST & DEVELOPMENT CORP FOR99.98%DPWH
22EH0056Construction of Mabulo Flood Control Structure (Upstream), San Fernando, RomblonMT GUITING-GUITING CONST99.98%DPWH
24EH0112Construction of Baito Flood Control Structure Phase 2, Poctoy, Odiongan, RomblonSCATR CONST99.98%DPWH
22E00057Construction of Pili Flood Control Structure (Phase 2), Looc, RomblonLEGACY CONST CORP FORMERLY: LEGACY CONST99.98%DPWH
22E00144Construction of Tuguis Flood Control Structures along Looc (Cogon Tulay)-Odiongan Road, Barangay Progreso Este, Odiongan, RomblonASHLEYKA CONST AND SUPPLIES99.96%DPWH
22EH0149Construction of Seawall, Brgy. Masudsud, Sitio Proper, Concepcion, RomblonSIM CONST TRADING AND SERVICES99.93%DPWH
22EH0064Construction of Poblacion San Agustin, Flood Interceptor, San Agustin, RomblonULTIMATE BUILDER'S & CONST SUPPLY99.93%DPWH
22EH0006Construction of Flood Mitigation Structure along Panique River (Phase 2), Odiongan, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP99.90%DPWH
21E00075Construction of Jao-asan Flood Control, Jao-asan, Magdiwang, RomblonLEGACY CONST CORP FORMERLY: LEGACY CONST99.87%DPWH
22EH0018Construction of Bariri Slope Protection Structure (Phase II), Sitio Bariri, Hinag-oman, Ferrol, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP99.81%DPWH
22EH0047Construction of Bonlao Flood Control Structure along Tabllas Circumferential Road, Alcantara, RomblonULTIMATE BUILDER'S & CONST SUPPLY99.43%DPWH
22EH0017Construction of Flood Mitigation Structure along Budiong River (Phase 2), Odiongan, RomblonSUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP99.40%DPWH
22EH0148Construction of Seawall, Brgy. Calabasahan, Concepcion, RomblonSIM CONST TRADING AND SERVICES98.50%DPWH
22EH0004Construction of Tuburan Flood Control Structure (Upstream), Tuburan, Odiongan, RomblonROLCO CONST & DEVELOPMENT CORP FOR98.47%DPWH
22EH0022Construction/Rehabilitation of Dulangan Flood Mitigating Structure (Downstream) along Dulangan River Control, Magdiwang, RomblonR G FLORENTINO CONST & TRADING INC98.45%DPWH
22EH0005Construction of Panique (Upstream) Flood Control Structure Phase 2, Odiongan, RomblonROLCO CONST & DEVELOPMENT CORP FOR98.45%DPWH
21E00076Construction of Pili Flood Control, Looc, RomblonLEGACY CONST CORP FORMERLY: LEGACY CONST64.27%DPWH
21E00079Construction of Tuguis Flood Control along Looc (Cogon-Tulay) Odiongan Road, Brgy Progreso Este, Odiongan, RomblonLEGACY CONST CORP FORMERLY: LEGACY CONST / FFJJ CONST49.97%DPWH
21E00079Construction of Tuburan Flood Control, Tuburan, Odiongan, RomblonLEGACY CONST CORP FORMERLY: LEGACY CONST / FFJJ CONST49.95%DPWH
22E00145Construction of Danao Flood Control Structure (Phase 2), Magdiwang, RomblonASHLEYKA CONST AND SUPPLIES49.12%DPWH
22E00145Construction of Ituralba Flood Control Structure (Phase 2), Magdiwang, RomblonASHLEYKA CONST AND SUPPLIES49.12%DPWH
21E00076Construction of Cabulutan Flood Control, Cabulutan, San Agustin,RomblonLEGACY CONST CORP FORMERLY: LEGACY CONST35.70%DPWH

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Completion schedule is shown for project and contractor flags only.

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Implementing office awards near-ABC contracts far more often than the flood-control baseline

{
  "office": "Romblon District Engineering Office",
  "nearAbc": 74,
  "trigger": "office_pattern_aggregate",
  "officeId": "92e74478-8d38-5585-907b-4def85221c0c",
  "threshold": 0.995,
  "binomialTailP": 0.0005694347981498294,
  "nearAbcRatePct": 86,
  "totalContracts": 86,
  "baselineRatePct": 70.4,
  "excessPctPoints": 15.6,
  "expectedNearAbc": 60.5,
  "baselineDefinition": "share of all Sumbong flood-control contracts awarded at ≥99.5% of ABC"
}