Construction of Pag-Alad Flood Mitigating Structure (Phase 2) along Parpagoha River Control, San Andres, Romblon
Construction of Pag-Alad Flood Mitigating Structure (Phase 2) along Parpagoha River Control, San Andres, Romblon is a DPWH-tracked public work in SAN ANDRES (ROMBLON), ROMBLON, Region IV-B. Reported contract value: ₱94,085,449.70. Status: Reported complete (DPWH). Contractor on record: MRRM TRADING & CONST / KPSL GEN CONTRACTOR INC. Figures trace to sumbong.
Total Contract Cost

