Construction of Calunacon Flood Control Structure along Tablas Circumferential Road (Phase 3), San Andres, Romblon
Construction of Calunacon Flood Control Structure along Tablas Circumferential Road (Phase 3), San Andres, Romblon is a DPWH-tracked public work in SAN ANDRES (ROMBLON), ROMBLON, Region IV-B. Reported contract value: ₱48,996,131.97. Status: Reported complete (DPWH). Contractor on record: ROLCO CONST & DEVELOPMENT CORP FOR. Figures trace to sumbong.
Total Contract Cost


