Construction of Flood Mitigating Structure along Gabawan Bridge (Upstream R/S), Odiongan, Romblon
Construction of Flood Mitigating Structure along Gabawan Bridge (Upstream R/S), Odiongan, Romblon is a DPWH-tracked public work in ODIONGAN (ROMBLON), ROMBLON, Region IV-B. Reported contract value: ₱48,997,559.85. Status: Reported complete (DPWH). Contractor on record: ROLCO CONST & DEVELOPMENT CORP FOR. Figures trace to sumbong.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost

