Construction of Flood Control Structure along David Bridge Upstream (L/S), Odiongan, Romblon
Construction of Flood Control Structure along David Bridge Upstream (L/S), Odiongan, Romblon is a DPWH-tracked public work in ODIONGAN (ROMBLON), ROMBLON, Region IV-B. Reported contract value: ₱125,450,000.00. Status: Reported complete (DPWH). Contractor on record: SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP. Figures trace to sumbong.
Total Contract Cost






