Construction of Flood Mitigation Structure24EH0102

Construction of Torre-Looban Flood Control Structure, Odionan, Romblon

Construction of Torre-Looban Flood Control Structure, Odionan, Romblon is a DPWH-tracked public work in ODIONGAN (ROMBLON), ROMBLON, Region IV-B. Reported contract value: ₱19,300,000.00. Status: Reported complete (DPWH). Contractor on record: ATHENA CONST AND DEVELOPMENT. Figures trace to sumbong.

ODIONGAN (ROMBLON), ROMBLON, Region IV-B
Region: Region IV-B

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱50,000

    Probable match · score 0.93

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIVB-24-0018713 · ₱172,611

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱19,010,538 · ATHENA CONSTRUCTION AND DEVELOPMENT

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-04-25 → 2019-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Romblon

Based on the coordinates published with the DPWH record and NOAH file Romblon.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Torre-Looban Flood Control Structure, Odionan, Romblon

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 93%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Canlumay Flood Control Structure, Odiongan, Romblon
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-24-0018713

₱172,611.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-24-0008382

₱1,788,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-24-0004006

₱99,740.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-24-0008396

₱165,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-24-0005017

₱602,194.00 · FY2024

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱19,300,000.00

Progress

Reported complete (DPWH)

Start Date

April 8, 2024

Target End

October 20, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “Construction of Torre-Looban Flood Control Structure, Odionan, Romblon.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/9e833667-fba7-425b-be73-06a66275e2ae

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionRomblonOdionganBatiano
Storms whose wind field reached it
Koto 2025Fung-Wong 2025Fengshen 2025Bualoi 2025Prapiroon 2024
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.