Construction of Ituralba Flood Control Structure (Phase 2), Magdiwang, Romblon
Construction of Ituralba Flood Control Structure (Phase 2), Magdiwang, Romblon is a DPWH-tracked public work in MAGDIWANG (ROMBLON), ROMBLON, Region IV-B. Reported contract value: ₱24,067,723.15. Status: Reported complete (DPWH). Contractor on record: ASHLEYKA CONST AND SUPPLIES. Figures trace to sumbong.
Total Contract Cost
