| DESIGN AND BUILD OF COASTAL DIKE AND DRAINAGE IMPROVEMENT, CATBALOGAN CITY, SAMAR | Flood Control Management Cluster | ₱744.4M | 87% reported progress | HI-TONE CONST & DEVELOPMENT CORP FORMERLY | 113 | Check in |
| METRO CEBU FLOOD CONTROL PROJECT AND DRAINAGE IMPROVEMENT PROJECT - SUBANG DAKU, LAHUG, GUADALUPE, KINALUMSAN, TIPOLO, TEJERO AND BULACAO RIVER BASINS, CEBU CITY | Flood Control Management Cluster | ₱684.0M | 91% reported progress | ARN BUILDERS INC FOR: ARN BUILDERS | 59 | Check in |
| METRO CEBU FLOOD CONTROL PROJECT - FLOOD CONTROL AND DRAINAGE IMPROVEMENT PROJECT, KINALUMSAN RIVER, DULJO, LABANGON AND MAMBALING, CEBU CITY | Flood Control Management Cluster | ₱553.8M | 22% reported progress | RAYMAN BUILDERS INC | 54 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG LAKE MAINIT - TUBAY RIVER (KALINAWAN - KARAK-AN SECTION), TUBAY, AGUSAN DEL NORTE | Region XIII | ₱465.1M | Reported complete | EQUI-PARCO CONST CO | 151 | Check in |
| CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY, DRAINAGE SYSTEM, CATBALOGAN CITY, INCLUDING ANTIAO RIVER CONTROL, SAMAR PROVINCE | Flood Control Management Cluster | ₱445.3M | Reported complete | MSB VITUG CONST | 113 | Check in |
| CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY DRAINAGE SYSTEM, CATBALOGAN CITY INCLUDING ANTIAO RIVER CONTROL, SAMAR | Flood Control Management Cluster | ₱438.8M | Reported complete | MSB VITUG CONST | 114 | Check in |
| CONSTRUCTION OF FLOOD CONTROL ALONG SIBALOM RIVER, SIBALOM. ANTIQUE | Region VI | ₱358.0M | 47% reported progress | MAC BUILDERS CORP FORMERLY: MAC BUILDERS DEVELOPMENT CORP | 31 | Check in |
| SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, SECTION 3.14B, TACLOBAN CITY, LEYTE | Region VIII | ₱313.0M | 0% reported progress | L N R CONST | 55 | Check in |
| SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF CAUSEWAY, SECTION 3.14A, TACLOBAN CITY, LEYTE | Region VIII | ₱313.0M | 0% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 55 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD AND CAUSEWAY, BRGY. CAMBAJAO-BRGY. ALIBAGON, CAJIDIOCAN, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱297.0M | 90% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 190 | Check in |
| 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BURABUD-AN, ABUYOG, LEYTE; 2. CONSTRUCTION OF FLOOD CONTROL STRUCTURE CADAC-AN RIVER, BARANGAY PAGSANG-AN, ABUYOG, LEYTE | Region VIII | ₱294.9M | Reported complete | JUCONS CONST OPC FORMERLY:JUCONS CONST &SUPPLY | 4 | Check in |
| CONSTRUCTION/DESILTATION MAON CATCHMENT AREA - VILLAKANANGA CREEK - CALOT - BONBON CREEK, BUTUAN CITY | Region XIII | ₱289.5M | Reported complete | EQUI-PARCO CONST CO | 191 | Check in |
| CLUSTER 5 - 5.1: CONSTRUCTION OF BUTUAN CITY REVETMENT ALONG AGUSAN RIVER, URDUJA SECTION PACKAGE 1, BUTUAN CITY 5.2: CONSTRUCTION OF BUTUAN CITY REVETMENT ALONG AGUSAN RIVER, URDUJA SECTION PACKAGE 2, BUTUAN CITY | Region XIII | ₱289.5M | Reported complete | EQUI-PARCO CONST CO | 190 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG SAN JOSE PORT, ROMBLON | Region IV-B | ₱289.5M | 57% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 168 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD AND CAUSEWAY FOR TOURISM ALONG AZAGRA PORT, CAJIDIOCAN, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱289.5M | Reported complete | ST TIMOTHY CONST CORP | 181 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG CAJIDIOCAN PORT, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱289.5M | Reported complete | ST TIMOTHY CONST CORP | 190 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG POBLACION SAN FERNANDO, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱289.5M | Reported complete | ST TIMOTHY CONST CORP | 185 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE-LOWER AGUSAN DEVELOPMENT PROJECT, FLOOD CONTROL COMPONENT, STAGE 1, PHASE 1 & 2, URBAN DRAINAGE SYSTEM IN BUTUAN CITY (MANDACPAN-BONBON CHANNEL IMPROVEMENT, DOWNSTREAM), PACKAGE 3, BUTUAN CITY | Region XIII | ₱285.7M | 70% reported progress | EQUI-PARCO CONST CO | 193 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE-LOWER AGUSAN DEVELOPMENT PROJECT, FLOOD CONTROL COMPONENT, STAGE 1, PHASE 1 & 2, URBAN DRAINAGE SYSTEM IN BUTUAN CITY (MANDACPAN-BONBON CHANNEL IMPROVEMENT, DOWNSTREAM), PACKAGE 4, BUTUAN CITY | Region XIII | ₱285.7M | 70% reported progress | EQUI-PARCO CONST CO | 192 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. CENTRAL-BRGY. SAN AGUSTIN, STA. 000+240-STA. 000+735.5 (LEFT SIDE), SAN JOSE, OCC. MIND | Region IV-B | ₱284.2M | 65% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 187 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. BATASAN, STA. 000+000-STA. 000+473.35, SAN JOSE, OCC. MINDORO | Region IV-B | ₱284.2M | 65% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 192 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROADS/BOULEVARD & CAUSEWAY FOR TOURISM ALONG STA. FE PORT, TABLAS ISLAND, ROMBLON | Region IV-B | ₱279.4M | 89% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 179 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BRGY. SAN AGUSTIN (UPSTREAM), SAN JOSE, OCC. MINDORO | Region IV-B | ₱276.6M | 61% reported progress | D T RECIO INC | 181 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BRGY. SAN AGUSTIN (DOWNSTREAM), SAN JOSE, OCC. MINDORO | Region IV-B | ₱276.4M | 59% reported progress | D T RECIO INC | 181 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE, BUSUANGA RIVER, BRGY. ADELA (DOWNSTREAM), RIZAL, OCC.MINDORO | Region IV-B | ₱275.8M | 60% reported progress | D T RECIO INC | 180 | Check in |
| REHABILITATION OF FLOOD CONTROL, PAGSANGA-AN RIVER, ORMOC CITY | Region VIII | ₱274.3M | 65% reported progress | E M CUERPO INC | 30 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER (UPSTREAM), LILOAN, CEBU | Region VII | ₱269.2M | 69% reported progress | BNR CONST & DEVELOPMENT CORP | 40 | Check in |
| CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES IN METRO CEBU, BRGY. PASIL AND ERMITA, BRGY. TEJERO AND BRGY. TIPOLO, CEBU CITY | Flood Control Management Cluster | ₱266.6M | Reported complete | MSB VITUG CONST | 56 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 4+780.00 - STATION 5+480, SECTION 5 PHASE 11, BRGY. STA. CRUZ, TANAUAN, LEYTE | Region VIII | ₱265.3M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 43 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 1+900 - STATION 2+550, SECTION 5 PHASE 9, BRGY. SAN JOAQUIN, PALO, LEYTE | Region VIII | ₱263.4M | Reported complete | WTG CONST | 45 | Check in |
| WIDENING OF BRIDGE - SIBALOM BR. (B00123PN) ALONG ILOILO - ANTIQUE RD | Region VI | ₱259.4M | Reported complete | ADVANCED FOUNDATION CONST SYSTEMS CORP | 10 | Check in |
| CONSTRUCTION OF LOWER AGUSAN RIVER BANK PROTECTION, AGAO - URDUJA - PPA SECTION, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | ₱250.9M | Reported complete | EQUI-PARCO CONST CO | 190 | Check in |
| REPAIR / REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS AND BRIDGES, FLOOD CONTROL, OTHER PUBLIC | Cebu 7th DEO | ₱250.9M | Reported complete | QM BUILDERS | 104 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST OF LOBOC RIVER CONTROL STRUCTURE, UGPONG SECTION TO VILLAFLOR SECTION, LEFT SI | Region VII | ₱241.2M | 83% reported progress | SUPREME ABF CONST | 129 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, POBLACION SAWANG, RIGHT SIDE PHASE 1, LOBOC, | Region VII | ₱241.2M | 80% reported progress | HGG BUILDERS | 128 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, POBLACION ONDOL, RIGHT SIDE, LOBOC, BOHOL | Region VII | ₱241.2M | 78% reported progress | HGG BUILDERS & SUPPLY | 129 | Check in |
| CONSTRUCTION OF JALIOBONG-SAN ISIDRO RIVER CONTROL PROJECT, KITCHARAO, AGUSAN DEL NORTE | Region XIII | ₱241.2M | Reported complete | ADFIL CORP | 140 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (MAHAY - VIADUCT SECT), BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | ₱241.2M | Reported complete | TRIPARCO DEVELOPMENT CORP | 190 | Check in |
| CONSTRUCTION OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES AND CHANNELIZATION, FATIMA, DULAG, LEYTE 2ND LD, DULAG, LEYTE | Region VIII | ₱241.2M | Reported complete | EZJONES CONST INC | 23 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF FLOOD MITIGATION STRUCTURE ALONG MAOYON RIVER, BRGY. MAOYON (LS), PTO. PRINCESA CITY, PALAWAN | Region IV-B | ₱241.2M | 94% reported progress | MAMSAR CONST AND INDUSTRIAL CORP | 147 | Check in |
| FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENAMNCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS- CONST. OF FLOOD MITIGATION STRUCTURE ALONG MAOYON RIVER (RS), STA. 000+000-STA. 000+623.17, PTO. PRINCESA CITY, PALAWAN | Region IV-B | ₱241.2M | 96% reported progress | MAMSAR CONST AND INDUSTRIAL CORP | 148 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONSTRUCTION OF COASTAL ROAD, PHASE 2, STA. FE, TABLAS ISLAND, ROMBLON | Region IV-B | ₱241.2M | 93% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 179 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 2+550 - STATION 3+180, SECTION 5 PHASE 10, BRGY. SAN JOAQUIN, PALO, LEYTE | Region VIII | ₱239.0M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 45 | Check in |
| CONSTRUCTION OF RIVER FLOOD MITIGATION STRUCTURE ALONG HANAGDONG BRIDGE, SURIGAO-AGUSAN WEST COASTAL ROAD, SURIGAO DEL NORTE | Region XIII | ₱238.8M | 46% reported progress | TRIPARCO DEVELOPMENT CORP | 121 | Check in |
| CONSTRUCTION OF LINONGGANAN RIVER FLOOD CONTROL ALONG SURIGAO-AGUSAN WEST COASTAL ROAD, BRGY. LINONGGANAN, SAN FRANCISCO, SURIGAO DEL NORTE | Region XIII | ₱238.6M | 19% reported progress | TRIPARCO DEVELOPMENT CORP | 107 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF RIVERBANK PROTECTION WORKS ALONG LABANGAN RIVER (UPSTREAM), BRGY. MURTHA, STA. 000+000-STA. 000+465.82, SAN JOSE, OCC. MINDOR | Region IV-B | ₱236.9M | 71% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 184 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC B UILDINGS/FACILITIES- CONST. OF RIVERBANK PROTECTION WORKS ALONG LABANGAN RIVER (DOWNSTREAM), BRGY. MURTHA, STA. 000+480-STA. 000+921.80, SAN JOSE, OCC. MIN | Region IV-B | ₱236.9M | 71% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 183 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (LEFT SIDE), LOAY, BOHOL | Region VII | ₱236.4M | 0% reported progress | SUPREME ABF CONST & CONST SUPPLY CO INC | 130 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (RIGHT SIDE), LOAY, BOHOL | Region VII | ₱236.3M | 0% reported progress | SUPREME ABF CONST | 131 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM ALONG BANGON RIVER, PHASE 3, BARANGAY SAN JOSE, PALO, LEYTE | Region VIII | ₱236.2M | 20% reported progress | EZJONES CONST INC | 48 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM), PHASE 2, TACLOBAN CITY | Region VIII | ₱236.1M | 31% reported progress | EZJONES CONST INC | 63 | Check in |
| CLUSTER 1: 1. CONSTRUCTION OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE A). SITIO BAGANG, BRGY. CABACUNGAN, DULAG, LEYTE 2. CONSTRUCTION (EXTENSION) OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE A), BRGY. FATIMA, DULAG, LEYTE | Region VIII | ₱233.5M | Reported complete | EZJONES CONST INC | 23 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD DIKE/ESPLANADE ALONG BUSUANGA RIVER, BRGY. AGUAS, RIZAL, OCC. MINDO | Region IV-B | ₱232.8M | 88% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 192 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG BUSUANGA RIVER, BRGY. PITOGO, RIZAL, OCC. MINDOR | Region IV-B | ₱232.8M | 82% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 190 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. SAN PEDRO (DOWNSTREAM), SAN JOSE, OC | Region IV-B | ₱232.4M | 90% reported progress | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 181 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. ADELA, SAN JOSE, OCC. MINDORO | Region IV-B | ₱232.4M | 85% reported progress | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 180 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF RIVERSIDE PROTECTION STRUCTURE, PILI RIVER, UPSTREAM, POBLACION, SAN FERNANDO, SIBUYAN ISLAND, ROMBLON | Region IV-B | ₱230.1M | 90% reported progress | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 186 | Check in |
| Construction of Basey Tide Embankment, Basey, Samar | SAMAR (WESTERN SAMAR) | ₱227.8M | Reported complete | NORTHERN BUILDERS / RIANNE CONST | 61 | Check in |
| Construction of Basey Tide Embankment, Basey, Samar | SAMAR (WESTERN SAMAR) | ₱227.8M | Reported complete | NORTHERN BUILDERS / RIANNE CONST | 61 | Check in |
| Construction of Basey Tide Embankment, Basey, Samar | SAMAR (WESTERN SAMAR) | ₱227.8M | Reported complete | NORTHERN BUILDERS / RIANNE CONST | 61 | Check in |
| CLUSTER 3: 1. CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.8, BARANGAY SAN ROQUE, TANAUAN, LEYTE; 2. CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, SUBSECTION 6.9, BARANGAY SAN ROQUE, TANAUAN, LEYTE | Region VIII | ₱226.2M | Reported complete | EZJONES CONST INC | 42 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP AND BRGY. MALAWAAN (DOWNSTREAM), RIZAL, OCC. MINDORO | Region IV-B | ₱225.6M | 85% reported progress | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 188 | Check in |
| CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF BANK PROTECTION STRUCTURE WITH ROAD DIKE ALONG LUMINTAO RIVER, BRGY. MAGSIKAP (UPSTREAM), RIZAL, OCC. MINDORO | Region IV-B | ₱221.9M | 64% reported progress | D T RECIO INC | 188 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONSTN/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURURE, GOTOZAN SECTION, LOBOC, BOHOL | Region VII | ₱215.0M | 64% reported progress | HGG BUILDERS | 128 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONSTN/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, VALLADOLID SECTION, LOBOC, BOHOL | Region VII | ₱214.7M | 67% reported progress | HGG BUILDERS | 129 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONSTN/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, UGPONG SECTION, LOBOC, BOHOL | Region VII | ₱214.5M | 62% reported progress | SUPREME ABF CONST | 129 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, VILLAFLOR SECTION, LOBOC, BOHOL | Region VII | ₱213.9M | 63% reported progress | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 129 | Check in |
| CSSP , SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT CAMANCHILLES RIVER, BRGY.TALAVERA, TOLEDO CITY, CEBU | Region VII | ₱212.3M | Reported complete | JJ &J CONST & GEN SUPPLY | 42 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BARANGAY BALUD TO BARANGAY STA. ELENA, TANAUAN, LEYTE, LEYTE 1ST LD | Region VIII | ₱212.2M | 94% reported progress | EZJONES CONST INC | 42 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG CARATAO RIVER, BULALACAO, OR. MINDORO | Region IV-B | ₱209.5M | 9% reported progress | G C I CONST AND DEV'T CORP | 177 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALOGCOG RIVER (UPSTREAM), BARANGAY CALOGCOG TO BARANGAY MOHON TO BARANGAY ATIPOLO, TANAUAN, LEYTE | Region VIII | ₱207.1M | 27% reported progress | EZJONES CONST INC | 43 | Check in |
| CONSTRUCTION OF SEAWALL/ESPLANADE INCLUDING ACCESS ROAD ALONG BARANGAY COMON - SAN PEDRO COASTAL ROAD LEADING TO SAN JOSE PORT AND BEACHES, RESORTS AND SUNSET VIEWING, SAN JOSE, ANTIQUE | Region VI | ₱204.5M | Reported complete | A M ORETA & CO INC 108 | 30 | Check in |
| Construction of Flood Control Structure along Cavillan River Upstream, Bulalacao, Oriental Mindoro | BULALACAO (SAN PEDRO) (ORIENTAL MINDORO), ORIENTAL MINDORO | ₱202.6M | Reported complete | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 182 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TIPOLO RIVER, PHASE 4, MANDAUE CITY | Region VII | ₱202.5M | 45% reported progress | QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST | 52 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDING/FACILITIES, CONSTRUCTION OF STORM SURGE PROTECTION STRUCTURE AT BARANGAY PITOGO, CARLOS P. GARCIA, BOHOL | Region VII | ₱197.6M | 82% reported progress | CEBU 7H TECHNOCHEM INDUSTRIES INC | 72 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM), TACLOBAN CITY, LEYTE | Region VIII | ₱197.5M | 86% reported progress | EZJONES CONST INC | 63 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BRGY. STA. ELENA, TANAUAN, LEYTE | Region VIII | ₱195.6M | 40% reported progress | EZJONES CONST INC | 40 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS AND PRINCIPAL RIVERS AT SIPALAY RIVER | Region VI | ₱195.5M | Reported complete | WTG CONST | 91 | Check in |
| Construction of River Bank Protection Structure along Irawan River Upstream, Barangay Irawan, Puerto Princesa City, Palawan | PUERTO PRINCESA CITY (CAPITAL) (PALAWAN), PALAWAN | ₱194.9M | Reported complete | YURICH BUILDERS AND CONST SUPPLY INC | 176 | Check in |
| Construction of Flood Control Structure at Lumintao River, Sitio Lumintao, Barangay Malawaan, Sta. 0+000 - Sta. 0+800, Rizal, Occidental Mindoro | RIZAL (OCCIDENTAL MINDORO), OCCIDENTAL MINDORO | ₱193.7M | Reported complete | ST MATTHEW GEN CONTRACTOR & DEVELOPMENT CORP / D T RECIO INC | 187 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ILOG-BUNGOL RIVER (SO. LAPAK), ILOG, NEGROS OCCIDENTAL | Region VI | ₱193.0M | 40% reported progress | ALPHA | 68 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGT. PROGRAM, CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD MITIGATION STRUCTURES ALONG DUMLOG RIVER (UPSTREAM) BARANGAY CARMEN, | Region VII | ₱193.0M | Reported complete | REBTRADE INTERNATIONAL CORP | 42 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE-LOWER AGUSAN DEVELOPMENT PROJECT, FLOOD CONTROL COMPONENT, STAGE 1, PHASE 1&2, URBAN DRAINAGE SYSTEM IN BUTUAN CITY (MANDACPAN-BONBON CHANNEL IMPROVEMENT, DOWNSTREAM), PACKAGE 2, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | ₱193.0M | Reported complete | EQUI-PARCO CONST CO | 193 | Check in |
| CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST. OF FLOOD MITIGATION STRUCTURE AT CAMANCHILLES RIVER (UPSTREAM), BRGY. TALAVERA, TOLEDO CITY | Region VII | ₱193.0M | Reported complete | QM BUILDERS | 42 | Check in |
| CONSTRUCTION OF DIKE WITH CONCRETE REVETMENT ALONG PUYO RIVER, DOWNSTREAM SECTION ALONG ABUTMENT B OF THE BRIDGE, PACKAGE 1, JABONGA, AGUSAN DEL NORTE | Region XIII | ₱193.0M | Reported complete | TRIPARCO DEVELOPMENT CORP | 149 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG HILABANGAN RIVER (DOWNSTREAM APPROACH A OF HILABANGAN BR.), KABANKALAN, NEGROS OCCIDENTAL | Region VI | ₱193.0M | 75% reported progress | IBC INTERNATIONAL BUILDERS CORP | 75 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, CANLASID SECTION, LOBOC, BOHOL | Region VII | ₱193.0M | 0% reported progress | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 130 | Check in |
| CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINOCAWAN RIVER, VALLEHERMOSO, NEGROS ORIENTAL | Region VII | ₱193.0M | 98% reported progress | WTG CONST | 40 | Check in |
| CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, ANOMAR SECTION, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | ₱193.0M | Reported complete | GICAR CONST INC | 109 | Check in |
| Rehabilitation of Bank Protection Structure along Taguibo River Protecting Taguibo Dam Water-Filtration Facilities, Package 2, Barangay Anticala, Butuan City, Agusan del Norte | BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE), AGUSAN DEL NORTE | ₱193.0M | Reported complete | EQUI-PARCO CONST CO | 182 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SAN ANTONIO, MADRID, SURIGAO DEL SUR | Region XIII | ₱193.0M | Reported complete | EQUI-PARCO CONST CO | 151 | Check in |
| CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BATERIA RIVER, GUIHULNGAN CITY, NEGROS ORIENTAL | Region VII | ₱193.0M | 99% reported progress | WTG CONST | 64 | Check in |
| Construction of Flood Control Structure - Lower Agusan Development Project, Flood Control (Bancasi Bridge Revetment Upstream and Downstream), Package 2, Butuan City, Agusan del Norte | BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE), AGUSAN DEL NORTE | ₱193.0M | Reported complete | TRIPARCO DEVELOPMENT CORP | 193 | Check in |
| REPAIR/ REHABILITATION AND IMPROVEMENT OF SURIGAO CITY BOULEVARD AND WHARF | Region XIII | ₱193.0M | Reported complete | A T DUMLAO CONST INC FORMERLYANDONI T D | 99 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY ACLAN, NASIPIT, AGUSAN DEL NORTE | Region XIII | ₱193.0M | 93% reported progress | ME 3 CONST | 188 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE-LOWER AGUSAN DEVELOPMENT PROJECT, FLOOD CONTROL COMPONENT, STAGE 1, PHASE 1 & 2, URBAN DRAINAGE SYSTEM IN BUTUAN CITY (MANDACPAN-BONBON CHANNEL IMPROVEMENT, DOWNSTREAM), PACKAGE 1, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | ₱193.0M | Reported complete | REDLION MEGATRADE INC | 193 | Check in |
| Construction of Flood Control Structure Along Cabadbaran River Upstream, Package 3, Cabadbaran City, Agusan del Norte | CITY OF CABADBARAN (AGUSAN DEL NORTE), AGUSAN DEL NORTE | ₱193.0M | Reported complete | TRIPARCO DEVELOPMENT CORP | 170 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY CULIT, NASIPIT, AGUSAN DEL NORTE | Region XIII | ₱193.0M | 94% reported progress | ME 3 CONST | 192 | Check in |
| Rehabilitation of Flood Control Structure along Malalag - Libertad Section, Package 2, Butuan City, Agusan del Norte | BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE), AGUSAN DEL NORTE | ₱193.0M | Reported complete | TRIPARCO DEVELOPMENT CORP | 191 | Check in |
| CONSTRUCTION OF ROAD DIKE ALONG DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION), JABONGA, AGUSAN DEL NORTE | Region XIII | ₱193.0M | Reported complete | ARQ BUILDERS | 147 | Check in |
| Rehabilitation of Flood Control Structure along Malalag - Libertad Section, Package 1, Butuan City, Agusan del Norte | BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE), AGUSAN DEL NORTE | ₱193.0M | Reported complete | TRIPARCO DEVELOPMENT CORP | 191 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONSTRUCTION OF PUERTO PRINCESA EAST COASTAL ROAD, PUERTO PRINCESA CITY, PALAWAN | Region IV-B | ₱193.0M | Reported complete | KATHA BUILDERS & SUPPLIES INC | 182 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. AGUAS (DOWNSTREAM), SAN JOSE, OCC. M | Region IV-B | ₱193.0M | 86% reported progress | D T RECIO INC | 192 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BALILIHAN, BOHOL | Region VII | ₱192.9M | 78% reported progress | REBTRADE INTERNATIONAL CORP | 112 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DIVINUBO, BORONGAN CITY, EASTERN SAMAR | Region VIII | ₱192.9M | 0% reported progress | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 101 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BARANGAY STA. ELENA (UPSTREAM), TANAUAN, LEYTE | Region VIII | ₱192.9M | 89% reported progress | EZJONES CONST INC | 39 | Check in |
| CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF STORM SURGE PROTECTION STRUCTURES AT BRGY. GUINTABOAN, UBAY, BOHOL | Region VII | ₱192.8M | 0% reported progress | ZLREJ TRADING AND CONST CORP | 87 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN RIVER, BARANGAY CALINGATNAN - SITIO MINAELI, BORONGAN CITY, EASTERN SAMAR | Region VIII | ₱192.7M | 76% reported progress | HGG BUILDERS & SUPPLY | 103 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, WAHIG RIVER, BARANGAY SALVADOR, SIERRA BULLONES,BOHOL | Region VII | ₱192.7M | 21% reported progress | J H PAJARA CONST CORP | 111 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, WAHIG RIVER, BARANGAY POBLACION, SIERRA BULLONES, BOHOL | Region VII | ₱192.7M | 21% reported progress | J H PAJARA CONST CORP | 110 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, WAHIG RIVER, BARANGAY BUGSOC, SIERRA BULLONES, BOHOL | Region VII | ₱192.7M | 23% reported progress | J H PAJARA CONST CORP | 112 | Check in |
| CLUSTER 3: 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BINAHAAN RIVER, BINONGTOAN SECTION, TANAUAN, LEYTE; 2. CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BINAHAAN RIVER, GUINGAUAN SECTION, TANAUAN, LEYTE | Region VIII | ₱192.5M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 37 | Check in |
| SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SEAWALL PROTECTION ALONG THE SHORELINES OF BRGY. STO, NIÑO, BARANGAY STA. FE, AND BARANGAY VICTORY, ABUYOG, LEYTE | Region VIII | ₱192.5M | 92% reported progress | JUCONS CONST OPC FORMERLY:JUCONS CONST &SUPPLY | 1 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BATANG - BARANGAY GARAWON, HERNANI, EASTERN SAMAR | Region VIII | ₱192.4M | 85% reported progress | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 68 | Check in |
| METRO CEBU FLOOD CONTROL AND DRAINAGE IMPROVEMENT PROJECT, KINALUMSAN RIVER, DULJO, LABANGON AND MAMBALING, CEBU CITY | Flood Control Management Cluster | ₱192.4M | Reported complete | BNR CONST | 55 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY SAN PABLO, TAFT, EASTERN SAMAR | Region VIII | ₱191.9M | 84% reported progress | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 130 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANGON RIVER (UPSTREAM), BARANGAY LIBERTAD, PALO, LEYTE | Region VIII | ₱191.3M | 47% reported progress | LEDA CONST INC | 48 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BANGON RIVER (DOWNSTREAM), BARANGAY LIBERTAD, PALO, LEYTE | Region VIII | ₱191.3M | 55% reported progress | LEDA CONST INC | 48 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY HINOLASO, DOLORES, EASTERN SAMAR | Region VIII | ₱190.9M | 67% reported progress | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 151 | Check in |
| Construction of Flood Control, Brgy. Belen, Leyte, Leyte | LEYTE (LEYTE), LEYTE | ₱190.9M | Reported complete | EZJONES CONST INC / JGO BUILDERS | 59 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. SAN AGUSTIN (UPSTREAM), STA. 000+406.97-STA. 000+693.20, SAN JOSE, OCC. MINDORO | Region IV-B | ₱189.5M | 65% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 181 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. STO NINO-BRGY. SAN PEDRO, STA. 000+284.32-STA. 000+536.36, RIZAL, OCC. MINDORO | Region IV-B | ₱189.5M | 64% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 183 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUIDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. STO. NINO, STA. 000+000-STA. 000+284.32, RIZAL, OCC. MINDORO | Region IV-B | ₱189.5M | 67% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 183 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. BATASAN-BRGY. CENTRAL (UPSTREAM), STA. 000+490-STA. 000+814.05, SAN JOSE, OCC. MINDORO | Region IV-B | ₱189.5M | 66% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 192 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. SAN AGUSTIN (DOWNSTREAM), STA. 000+693.20-STA. 000+980.09, SAN JOSE, OCC. MINDORO | Region IV-B | ₱189.5M | 63% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 181 | Check in |
| BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. BATASAN-BRGY. CENTRAL (DOWNSTREAM), STA. 000+830-STA. 001+140.38, SAN JOSE, OCC. MINDOR | Region IV-B | ₱189.5M | 64% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 191 | Check in |
| CONSTRUCTION OF TOLOSA TIDE EMBANKMENT, PHASE 1, BARANGAY TELEGRAFO, TOLOSA, LEYTE | Region VIII | ₱189.4M | 1% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 34 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY MALINAO, TAFT, EASTERN SAMAR | Region VIII | ₱188.5M | 90% reported progress | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 130 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALOGCOG RIVER (UPSTREAM), BARANGAY CALOGCOG AND BARANGAY ATIPOLO, TANAUAN, LEYTE | Region VIII | ₱187.9M | 82% reported progress | EZJONES CONST INC | 43 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, BARANGAY CABARASAN GUTI, TANAUAN, LEYTE | Region VIII | ₱187.9M | 87% reported progress | EZJONES CONST INC | 42 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER, UPSTREAM, PACKAGE 1, TACLOBAN CITY, LEYTE | Region VIII | ₱187.8M | 76% reported progress | EZJONES CONST INC | 64 | Check in |
| CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BINAHAAN RIVER, PACKAGE 1, BARANGAY GUINGAUAN, TANAUAN, LEYTE | Region VIII | ₱187.2M | 5% reported progress | EZJONES CONST INC | 37 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SIHA, BORONGAN CITY, EASTERN SAMAR | Region VIII | ₱186.9M | 69% reported progress | GREAT PACIFIC BUILDERS AND GEN CONTRACTOR INC | 99 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG BUSUANGA RIVER, BRGY. SAN PEDRO,SAN JOSE, OCC. | Region IV-B | ₱186.3M | 83% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 181 | Check in |
| SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF EAST COASTAL ROAD, BRGY. PAGKAKAISA SECTION, PTO. PRINCESA CITY, PALAWAN | Region IV-B | ₱186.2M | 86% reported progress | AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP | 182 | Check in |
| CLUSTER 2: 1. CONSTRUCTION OF STORM SURGE: HEIGHTENED ROAD AND TIDE EMNAKMENT, SECTION 6.1, TANAUAN, LEYTE; 2. CONSTRUCTION OF STORM SURGE: HEIGHTENED ROAD AND TIDE EMBANKMENT, SECTION 6.2, TANAUAN, LEYTE | Region VIII | ₱185.9M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST | 43 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SANTA ANA RIVER, BARANGAY CAMPANGGA, BARILI, CEBU | Region VII | ₱183.3M | 73% reported progress | JJ &J CONST & GEN SUPPLY | 70 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF GUINHALARAN CREEK ALONG BACOLOD NORTH ROAD, SILAY CITY, NEGROS OCCIDENTAL | Region VI | ₱183.0M | Reported complete | SUPREME ABF CONST | 1 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF HIMOGA- AN RIVER, SAGAY CITY, NEGROS OCCIDENTAL | Region VI | ₱181.8M | 90% reported progress | JAIME B CHING ENT | 18 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ILOG- HILABANGAN RIVER (DOWNSTREAM OF APPROACH A OF ILOG BR.), ILOG, NEGROS OCCIDENTAL | Negros Island Region | ₱181.5M | 79% reported progress | HOMEWORLD CONST CORP FORMERLY HOMEWORLD E | 69 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MINULU- AN RIVER (BOTHSTREAM) AT BACOLOD NORTH RD, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | ₱179.7M | 0% reported progress | HOMEWORLD CONST CORP FORMERLY HOMEWORLD E | 6 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, TANAUAN, LEYTE | Region VIII | ₱178.0M | 75% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 38 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SOONG, LLORENTE, EASTERN SAMAR | Region VIII | ₱177.9M | 82% reported progress | YPR GEN CONTRACTOR AND CONST SUPPLY INC | 83 | Check in |
| REHABILITATION OF FLOOD CONTROL STRUCTURE, PANINGAYAN RIVER; CAIRAWAN RIVER, LINDERO; PALIWAN RIVER, LUGTA; CAIRAWAN RIVER, LIBERATO; CAIRAWAN RIVER, LIYA-LIYA; PANINGAYAN RIVER, LEON, LAUA-AN, ANTIQUE | Region VI | ₱175.6M | 97% reported progress | IBC INTERNATIONAL BUILDERS CORP | 65 | Check in |
| Construction of Flood Mitigation Structure along Tipolo River, Mandaue City, Cebu | MANDAUE CITY (CEBU), CEBU | ₱173.7M | Reported complete | ZLREJ TRADING AND CONST CORP / GICAR CONST INC | 52 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST OF FLOOD CONTROL STRUCTURE ALONG MANANGA RIVER (UPSTREAM), TALISAY CITY, CEBU | Region VII | ₱173.7M | 99% reported progress | QUIRANTE CONST CORP FORMERLY: QUIRANTE CONST | 58 | Check in |
| CLUSTER 1: CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERS, OCCIDENTAL MINDORO | Region IV-B | ₱173.7M | Reported complete | NORTHERN BUILDERS | 192 | Check in |
| CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF DIKE AT SAN ANTONIO RIVER, BRGY. SAN ANTONIO, DUERO, BOHOL | Region VII | ₱173.6M | 95% reported progress | REBTRADE INTERNATIONAL CORP | 120 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF WAHIG RIVER CONTROL, PHASE 4, SIERRA BULLONES, BOHOL | Region VII | ₱173.6M | 85% reported progress | ZLREJ TRADING AND CONST CORP | 111 | Check in |
| CSSP, SUSTAINABLE INFRASTRUCTURE PROJ. ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG MAHIGA CREEK, BARANGAY SUBANGDAKU,MANDAUE CITY, CEBU (PACKAGE II) | Region VII | ₱173.6M | 95% reported progress | ZLREJ TRADING AND CONST CORP | 53 | Check in |
| CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, BARANGAY TABOK (PHASE IV), MANDAUE CITY, CEBU | Region VII | ₱173.6M | 95% reported progress | ZLREJ TRADING AND CONST CORP | 50 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, MANDAUE CITY, CEBU | Region VII | ₱173.5M | 52% reported progress | ZLREJ TRADING AND CONST CORP | 51 | Check in |
| CONSTRUCTION OF REVETMENT WALL ALONG BACONG RIVER, BARANGAY CAMANSIHAN, CULASI, ANTIQUE | Region VI | ₱173.0M | Reported complete | F GURREA CONST INC | 96 | Check in |
| BORACAY DRAINAGE IMPROVEMENT PROJECT, BORACAY ISLAND, MALAY, AKLAN | Region VI | ₱171.9M | 9% reported progress | MONOLITHIC CONST | 159 | Check in |
| CONSTRUCTION OF BANGON FLOOD CONTROL STRUCTURE ALONG BANGON RIVER, BARANGAY SAN JOSE (PHASE 2), PALO, LEYTE | Region VIII | ₱169.7M | 91% reported progress | EZJONES CONST INC | 48 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BAROBO, LLORENTE, EASTERN SAMAR | Region VIII | ₱168.8M | 91% reported progress | B VICENCIO BUILDERS BVB INC FORMERLY:B VICENCIO CONST | 75 | Check in |
| CONSTRUCTION OF FLOOD CONTROL, BARANGAY ALANG-ALANG (RAWIS), BORONGAN CITY, EASTERN SAMAR | Region VIII | ₱168.8M | 45% reported progress | B VICENCIO BUILDERS BVB INC FORMERLY:B VICENCIO CONST | 101 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: TIDE EMBANKMENT, TANAUAN, LEYTE | Region VIII | ₱168.2M | 0% reported progress | SUNWEST INC FORMERLY: SUNWEST CONST | 38 | Check in |
| OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, AGAPE SECTION, LOBOC, BOHOL | Region VII | ₱166.3M | 0% reported progress | ELITE GEN CONTRACTOR AND DEVELOPMENT CORP | 130 | Check in |
| Construction of Flood Control Structure along Mahayahay Creek, Tacloban City, Leyte | TACLOBAN CITY (CAPITAL) (LEYTE), LEYTE | ₱164.0M | Reported complete | EZJONES CONST INC / JB KONSTRUKTURA CO | 52 | Check in |
| SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMALBAGAN CREEK, BARANGAY TELEGRAFO, TOLOSA, LEYTE | Region VIII | ₱163.9M | 61% reported progress | EZJONES CONST INC | 33 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARUGUAN RIVER PHASE 2, TACLOBAN CITY | Region VIII | ₱163.9M | 90% reported progress | AQUALINE CONST CORP FORMERLY: AQUALINE CONST | 63 | Check in |
| CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER (PHASE 7), BARANGAY TINGUB TO BARANGAY CANDUMAN, MANDAUE CITY, CEBU | Region VII | ₱163.2M | 57% reported progress | ZLREJ TRADING AND CONST CORP | 50 | Check in |
| METRO CEBU FLOOD CONTROL PROJECT-FLOOD CONTROL AND DRAINAGE IMPROVEMENT PROJECT, TIPOLO RIVER, GUIZO, MANTUYONG AND TIPOLO, MANDAUE CITY, CEBU | Flood Control Management Cluster | ₱162.8M | Reported complete | J H PAJARA CONST CORP | 52 | Check in |
| CONSTRUCTION OF LIBERTAD FLOOD CONTROL STRUCTURE ALONG BANGON RIVER, BARANGAY LIBERTAD, PALO, LEYTE | Region VIII | ₱160.5M | 96% reported progress | LEDA CONST INC | 48 | Check in |
| CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF EMBARKADERO FLOOD CONTROL STRUCTURE ALONG BAHAY RIVER, (DOWNSTREAM), PALO, LEYTE | Region VIII | ₱159.6M | 83% reported progress | MAMSAR CONST AND INDUSTRIAL CORP | 47 | Check in |
| Construction of Flood Control Structures along Lake Mainit - Tubay River (Kalinawan-Karak-an Section), Package 3, Tubay, Agusan del Norte | TUBAY (AGUSAN DEL NORTE), AGUSAN DEL NORTE | ₱159.2M | Reported complete | EQUI-PARCO CONST CO | 168 | Check in |
| CLUSTER I: 1. CONSTRUCTION OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE B), SITIO BAGANG, BRGY. CABACUNGAN, DULAG, LEYTE; 2. CONSTRUCTION (EXTENSION) OF DAGUITAN - MARABONG FLOOD CONTROL STRUCTURES (PACKAGE B), BRGY. FATIMA, DULAG, LEYTE | Region VIII | ₱155.9M | Reported complete | EZJONES CONST INC | 23 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY BASAK PARDO, CEBU CITY | Region VII | ₱154.4M | Reported complete | WTG CONST | 58 | Check in |
| Construction of River Flood Control Along Cantapoy Bridge along Surigao - West Coastal Road, Surigao del Norte | MALIMONO (SURIGAO DEL NORTE), SURIGAO DEL NORTE | ₱154.4M | Reported complete | ME 3 CONST / EQUI-PARCO CONST CO | 126 | Check in |
| Rehabilitation of Bank Protection Structure along Taguibo River Protecting Taguibo Dam Water-Filtration Facilities, Brgy. Anticala, Butuan City | BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE), AGUSAN DEL NORTE | ₱154.4M | Reported complete | EQUI-PARCO CONST CO / TRIPARCO DEVELOPMENT CORP | 182 | Check in |
| Construction of Tanabag River Waterway, (Upstream Rightside), Palawan | PUERTO PRINCESA CITY (CAPITAL) (PALAWAN), PALAWAN | ₱154.4M | Reported complete | OCTAGON CONCRETE SOLUTIONS INC / MAC BUILDERS CORP FORMERLY: MAC BUILDERS DEVELOPMENT CORP | 144 | Check in |
| SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CABALAWAN CREEK, BRGY. CABALAWAN, TACLOBAN CITY | Region VIII | ₱154.3M | 3% reported progress | EZJONES CONST INC | 61 | Check in |
| OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, PHASE 2, LILOAN, CEBU | Region VII | ₱154.3M | 84% reported progress | VSP STRUCTURE VENTURES CORP FORMERLY: VIRLO CONST | 40 | Check in |
| CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER (PACKAGE 1), BARANGAY PANAS, CONSOLACION, CEBU | Region VII | ₱153.4M | 80% reported progress | GONZALODO ENT | 40 | Check in |
| CONSTRUCTION OF DIVERSION CHANNEL, BACOLOD CITY, NEGROS OCCIDENTAL | Region VI | ₱152.4M | 84% reported progress | LEGACY CONST CORP FORMERLY: LEGACY CONST | 1 | Check in |
| Construction of Storm Surge Protection; Wave Wall, Subsection 3.19 (Sta. 4+686.5 to 4+866.5), Tacloban City, Leyte | TACLOBAN CITY (CAPITAL) (LEYTE), LEYTE | ₱151.8M | Reported complete | SUNWEST INC FORMERLY: SUNWEST CONST & DEVELOPMENT CORP | 53 | Check in |
| CONSTRUCTION OF TACLOBAN CITY MASTER DRAINAGE AND FLOOD CONTROL SYSTEM, TACLOBAN CITY | Tacloban City DEO | ₱150.8M | 91% reported progress | MAMSAR CONST AND INDUSTRIAL CORP | 50 | Check in |
| CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY BITOON ILAWOD TO BARANGAY POBLACION ILAYA, CUARTERO, CAPIZ | Region VI | ₱150.7M | 31% reported progress | TIB TIMCO INFRA BUILDERS | 78 | Check in |
| Construction of Flood Control Structure along Cotcot River, Upstream, Liloan, Cebu | LILOAN (CEBU), CEBU | ₱149.8M | Reported complete | MC GEOMETRIC PROPORTIONS INC / ALPHA & OMEGA GEN CONTRACTOR & DEVELOPMENT CORP | 40 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SEAWALL, BARANGAY NORTH POBLACION, JIMALALUD, NEGROS ORIENTAL | Negros Island Region | ₱149.6M | 41% reported progress | PHILSOUTH BUILDERS INC FORMERLY:PHILSOUTH BUILDERS | 79 | Check in |
| CONSTRUCTION OF FLOOD MITIGATION STRUCTURE PROTECTING CONCEPCION BRIDGE IN BARANGAY CONCEPCION, CABADBARAN CITY, AGUSAN DEL NORTE | Region XIII | ₱149.6M | 82% reported progress | ARQ BUILDERS | 164 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CADAC-AN RIVER, BARANGAY CAN-APORONG, ABUYOG, LEYTE | Region VIII | ₱149.5M | 65% reported progress | ST GERRARD CONST GEN CONTRACTOR & DEVELOPMENT CORP FORMERLY:ST GERRARD CONST | 0 | Check in |
| CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINOCAWAN RIVER, VALLEHERMOSO, NEGROS ORIENTAL | Negros Island Region | ₱149.4M | 78% reported progress | WTG CONST | 40 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PACKAGE 2, WEIGHBRIDGE SECTION, BARANGAY AMPAYON, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | ₱148.9M | 66% reported progress | RAMISES CONST | 188 | Check in |
| Construction of Revetment Wall Structure along Mananga River (Right Side), Sitio Bogo, Barangay Camp 4, Talisay City, Cebu | CITY OF TALISAY (CEBU), CEBU | ₱148.5M | Reported complete | QM BUILDERS | 54 | Check in |
| Construction of Revetment Wall Structure along Mananga River (Left Side), Sitio Bogo, Barangay Camp 4, Talisay City, Cebu | CITY OF TALISAY (CEBU), CEBU | ₱148.5M | Reported complete | QM BUILDERS | 54 | Check in |
| CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF BARANGAY COMON - SAN PEDRO COASTAL ROAD LEADING TO SAN JOSE PORT AND BEACHES, RESORTS AND SUNSET VIEWING, SAN JOSE, ANTIQUE | Region VI | ₱148.5M | Reported complete | IBC INTERNATIONAL BUILDERS CORP | 32 | Check in |
| Construction of Dike, Brgy. Montañeza-Brgy. Lombo, Malabuyoc, Cebu | MALABUYOC (CEBU), CEBU | ₱148.5M | Reported complete | NEWBIG FOUR J CONST INC FORMERLY FOUR J | 113 | Check in |
| CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SIMALA, SIBONGA, CEBU | Cebu 1st DEO | ₱148.4M | 54% reported progress | ARQ BUILDERS | 87 | Check in |
| CONSTRUCTION OF STORM SURGE PROTECTION: HEIGHTENED ROAD AND TIDE EMBANKMENT, STATION 5+640 - STATION 6+080, SECTION 5 PHASE 13, BRGY. CALOGCOG, TANAUAN, LEYTE | Region VIII | ₱147.8M | Reported complete | LADY OF ASSUMPTION ENT INC FORMERLY: LADY OF ASSUMPTION ENT | 43 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARUSAN RIVER, ABUYOG, LEYTE | Region VIII | ₱147.5M | 37% reported progress | JUCONS CONST OPC FORMERLY:JUCONS CONST &SUPPLY | 1 | Check in |
| CONSTRUCTION OF REVETMENT WALL ALONG TANGALAN RIVER, TANGALAN, AKLAN | Region VI | ₱147.4M | Reported complete | IBC INTERNATIONAL BUILDERS CORP | 131 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JALAUR RIVER, SECTION 9, CALINOG, ILOILO | Region VI | ₱147.4M | 0% reported progress | IBC INTERNATIONAL BUILDERS CORP | 56 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TIGUM RIVER, SECTION 8, MAASIN, ILOILO | Region VI | ₱147.4M | 0% reported progress | IBC INTERNATIONAL BUILDERS CORP | 34 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ULIAN RIVER, SECTION 8, DUEÑAS, ILOILO | Region VI | ₱147.4M | 22% reported progress | IBC INTERNATIONAL BUILDERS CORP | 47 | Check in |
| CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUAGE RIVER, SECTION 9, JANIUAY, ILOILO | Region VI | ₱147.4M | 1% reported progress | IBC INTERNATIONAL BUILDERS CORP | 44 | Check in |
| CONSTRUCTION OF SLOPE PROTECTION ALONG SUAGE RIVER IN MINA, ILOILO (SECTION 2) | Region VI | ₱147.2M | 81% reported progress | MONOLITHIC CONST | 35 | Check in |
| CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, BANGA, AKLAN (PACKAGE 2) | Region VI | ₱147.2M | 80% reported progress | IBC INTERNATIONAL BUILDERS CORP | 117 | Check in |
| CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER, KALIBO, AKLAN | Region VI | ₱147.2M | 68% reported progress | IBC INTERNATIONAL BUILDERS CORP | 121 | Check in |