GICAR CONST INC is listed as a company organization in Philippine public procurement records on this site, with 150 linked DPWH project(s) totaling about ₱10,668,493,119.14. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
GICAR CONST INC
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 150
- Total value
- ₱10,668,493,119.14
- Published flags
- 11
- Region
- Surigao del Norte 2nd DEO · Region XIII
Online presence
Google Maps: Gicar Construction★ 5 (1 reviews)Google Maps, 2026-10-22
232 San Nicolas Street, Surigao, Surigao del Norte
Licensed officers (PCAB)
- Ernesto G. Chua · Authorized Managing Officer (PCAB license 12624) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for GICAR CONST INC — not an accusation or finding of wrongdoing.
Score: 86.80 / 100 · Projects in sample: 150 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 76/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 76
- lateCompletedProjects
- 19
- onTimeCompletedProjects
- 109
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 142
- pastTargetOngoingProjects
- 14
- undatedCompletedProjectsExcluded
- 8
- Termination rate
Component score: 98/100 · Weight: 21%
- totalProjects
- 150
- componentScore
- 98
- terminatedProjects
- 1
- terminationRatePct
- 0.7
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 150
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 98.2/100 · Weight: 11%
- projects
- 150
- componentScore
- 98.2
- flagsPerProject
- 0.06
- publishedV2Flags
- 9
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 150
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 47 of 137 geotagged projects (largest by contract value) — Open full map
- MAGTIACO BRIDGE ALONG DAANG MAHARLIKA (SURIGAO - AGUSAN SECT), ALEGRIA, SURIGAO DEL NORTE19N00120 · ₱284,829,711.14 · mapped
- ROAD WIDENING, SURIGAO - DAVAO COASTAL RD - K1428+660 - K1431+365, K1434+910 - K1437+057, K1442+714 - K1443+044, K1443+073 - K1443+659, K1457+096 - K1457+654, HINATUAN - BISLIG, SURIGAO DEL SUR18N00088 · ₱241,240,877.39 · mapped
- CLUSTER 32 CONSTRUCTION OF BYPASS AND DIVERSION ROADS IN CAGAYAN DE ORO CITY18K00233 · ₱229,141,974.30 · mapped
- CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, ANOMAR SECTION, SURIGAO CITY, SURIGAO DEL NORTE24N00127 · ₱192,999,994.41 · mapped
- ROAD WIDENING, DAANG MAHARLIKA (AGUSAN-DAVAO SECT) - K1263+000-K1265+500, K1268+003-K1268+200, K1271+000-K1271+575, K1271+633-K1272+000, K1278+516- K1280+467, BAYUGAN CITY, AGUSAN DEL SUR18N00052 · ₱192,998,671.70 · mapped
- CONSTRUCTION OF NRJ RIZAL - TOGBONGON - MAT-I - MABINI - TRINIDAD INCLUDING BRIDGE, SURIGAO DEL NORTE17N00022 · ₱169,839,755.80 · mapped
- REHABILITATION/RECONSTRUCTION OF TOLEDO-PINAMUNGAJAN-ALOGUINSAN-MANTALONGON ROAD, K0073+050-K0073+150 R/S AND K0074+000-K0074+200 R/S WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, CEBU PROVINCE23H00106 · ₱163,939,025.00 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ,CDO-NEW WESTERN DIVERSION ROAD (CANITO-AN-CDO COASTAL ROAD SECTION), PACKAGE 10, CAGAYAN DE ORO CITY22K00369 · ₱149,748,092.42 · mapped
- Rehabilitation/ Reconstruction of Tinago Flood Control, Left Bank, Barangay Tinago, Malimono, Surigao del Norte23NG0125 · ₱144,749,996.80 · mapped
- Rehabilitation/ Reconstruction of Cansayong Flood Control, Barangay Cansayong, Malimono, Surigao del Norte23NG0129 · ₱144,749,721.90 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, VIADUCT BR. (B00081CB) ALONG CEBU SOUTH COASTAL RD. CEBU CITY23H00001 · ₱144,748,753.31 · mapped
- REHABILITATION OF ROAD, LAKE MAINIT CIRCUMFERENTIAL ROAD (PACKAGE 2), MAINIT, SURIGAO DEL NORTE25NG0042 · ₱144,650,000.00 · mapped
- REHABILITATION OF ROAD, LAKE MAINIT CIRCUMFERENTIAL ROAD (PACKAGE 1), MAINIT, SURIGAO DEL NORTE25NG0041 · ₱144,650,000.00 · mapped
- CIRCUNFERENTIAL ROAD LEADING TO LAKE MAINIT (MAINIT-POBLACION-TAGBUYAWAN) INCLUDING TAPIAN BR. II, MAINIT, SURIGAO DEL NORTE17N00109 · ₱143,784,687.92 · mapped
- Construction of Flood Mitigation Structure along Magallanes River, Barangay Sico-Sico, Gigaquit, Surigao del Norte24NG0018 · ₱138,817,742.10 · mapped
- CONST. OF BY-PASSES/DIVERSION RDS,INCL. ROW,OPOL DIVERSION RD(OPOL-CANITOAN),INCL. BR AND ROW,CDOC 115K00353 · ₱136,863,441.00 · mapped
- Construction of Drainage System (Bonbon - Kauswagan Section), Package 12, Sta. 0+000.00 - Sta. 1+536.00, Cagayan de Oro City22K00073 · ₱134,600,733.30 · mapped
- DAANG MAHARLIKA (LIPATA-SURIGAO SECT)- K1115+474 - K1120+20024N00061 · ₱134,050,557.38 · mapped
- ROAD WIDENING, DAANG MAHARLIKA (SURIGAO-AGUSAN SECT.) INCL. ROW, K1157+179-K1157+767, K1157+793-K1158+222, K1158+228-K1158+543, K1158+580 - K1160+784, SURIGAO DEL NORTE18N00046 · ₱133,629,955.80 · mapped
- CONST. OF CDO DIVERSION RD(JCT BALUBAL)SH-PUEBLO DE ORO,CDO-OLD AIRPORT DIVERSION RD(PUEBLO DE ORO/J15K00356 · ₱129,566,861.70 · mapped
- Construction of Revetment Wall at Sitio Luwak, Barangay Salmeron, Malabuyoc, Cebu24HO0016 · ₱128,179,667.50 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SURIGAO RIVER/BARANGAY TRINIDAD, SURIGAO CITY, SURIGAO DEL NORTE25NG0004 · ₱127,350,000.00 · mapped
- CONST. OF BYPASSES/DIVERSION ROADS,OPOL DIVERSION ROAD(OPOL-CANITOAN)INCL.ROW,CDOC 1ST LD17K00135 · ₱127,312,121.93
- CONST. OF BY-PASS AND DIVERSION ROAD, CDO-NEW WESTERN DIVERSION ROAD (CANITO-AN-CDO COASTAL ROAD SECTION), PACKAGE 14, CAGAYAN DE ORO CITY24K00070 · ₱127,189,589.50 · mapped
- Construction of Flood Mitigation Structure along Hinagasan River, Sison, Surigao del Norte23N00133 · ₱115,799,955.50 · mapped
- ROAD WIDENING OF BUTUAN CITY-CDO CITY-ILIGAN CITY RD.K1405+136-K1405+189,K1405+830-K1405+886,K141118K00121 · ₱112,748,691.59 · mapped
- Construction of Revetment along Surigao River, Poctoy Section, Phase 1, Surigao City, Surigao del Norte24N00148 · ₱110,974,983.10 · mapped
- Construction of Flood Mitigating Structure along Hinagasan River, Barangay Mabuhay, Sison, Surigao del Norte21N00097 · ₱109,044,995.10 · mapped
- CONST. OF BY PASSES/DIVERSION ROADS, OPOL -CANITOAN INCL. ROW & BR. MIS. OR. 2ND LD17K00173 · ₱108,851,846.60
- CONST. OF BY-PASS AND DIVERSION ROADS , CDO-NEW WESTERN DIVERSION ROAD (KAUSWAGAN-BONBON SECTION), PACKAGE 7, CAGAYAN DE ORO CITY23K00086 · ₱107,921,501.18 · mapped
- SURIGAO-DAVAO COASTAL RD- K1431+365 - K1434+07523N00182 · ₱103,625,840.80 · mapped
- Construction of Slope Protection System along Panas Road, Barangay Panas (Phase III), Consolacion, Cebu23HN0098 · ₱96,500,000.00 · mapped
- Construction of Flood Mitigation Structure along Surigao River, Barangay Quezon, Surigao City, Surigao del Norte23NG0023 · ₱96,499,997.47 · mapped
- Construction of Flood Mitigation Structure along Hinagasan River, Barangay Mabuhay, Sison, Surigao del Norte22NG0030 · ₱96,499,885.76 · mapped
- PREVENTIVE MAINTENANCE PRIMARY ROADS DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION)/DAANG MAHARLIKA (SURIGAO - AGUSAN SECTION), K1133+930 - K1136+00023NG0098 · ₱96,499,719.98 · mapped
- PREVENTIVE MAINTENANCE PRIMARY ROADS DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION)/DAANG MAHARLIKA (SURIGAO - AGUSAN SECTION), K1147+704, K1149+889.4023NG0100 · ₱96,494,670.16 · mapped
- Construction of Revetment along Surigao River, Luna Section, Surigao City, Surigao del Norte23NG0041 · ₱96,494,216.75 · mapped
- Construction of Revetment along Surigao River, Togbongon Section, Surigao City, Surigao del Norte23NG0042 · ₱96,472,570.51 · mapped
- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DINAGAT-LORETO RD - K0026+000-K0027+100,K0027+850-K0027+990, BASILISA AND LIBJO, DINAGAT ISLANDS22NE0052 · ₱96,399,904.42 · mapped
- Construction of Cagayan de Oro Drainage System (Diversion Channel along Kauswagan - Bayabas Section) Package 5, Cagayan de Oro City21K00236 · ₱96,258,829.05 · mapped
- Construction of Revetment Wall at Sitio Kang-Irong - Sitio Luwak, Brgy. Salmeron, Malabuyoc, Cebu23HO0004 · ₱96,207,155.27 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO, CDO-OLD AIRPORT ROAD DIVERSION ROAD (PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD) PHASE II, PACKAGE 17, CAGAYAN DE ORO CITY23K00198 · ₱95,244,276.10 · mapped
- SURIGAO-DAVAO COASTAL ROAD - K1220+200 - K1220+205, K1220+277 - K1223+70021NH0064 · ₱95,046,210.97 · mapped
- INSTALLATION OF SOLAR STREET LIGHTS ALONG DAANG MAHARLIKA (SURIGAO-AGUSAN SECT.), (SURIGAO DEL NORTE SIDE), SURIGAO DEL NORTE/SURIGAO CITY, SURIGAO DEL NORTE23NG0090 · ₱94,086,925.88 · mapped
- ROAD WIDENING ALONG BUTUAN CITY-MALAYBALAY RD. INCLUDING ROW-K1245+130-K1247+190, K1249+451-K1251+050, BUTUAN CITY18ND0074 · ₱93,526,705.00 · mapped
- Rehabilitation/Reconstruction of Scoured Revetment at Approach ''B'' (Upstream-Right Side) along Surigao-Davao Coastal Road/Tago-Gamut Bridge, Gamut-Tago, Surigao del Sur, Sta. 0+000 - Sta. 0+282.5923NH0084 · ₱92,057,573.39 · mapped
- CONST. OF CDO-NEW WESTERN DIVERSION ROAD(CANITOAN-CDO COASTAL ROAD),CDOC15K00208 · ₱90,758,249.99
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SOIL COLLAPSE AND LANDSLIDE AT CAGMINO-NURCIA SECTION ALONG SDCR, SIBAHAY TO NURCIA, K1269+690- K1269+930.40, LANUZA SURIGAO DEL SUR23NH0080 · ₱90,720,171.22 · mapped
- CONST. OF BYPASSES/DIVERSION RD,CDO COASTAL RD INCL. ROW 7 SLOPE PROT.,PACKAGE 2(LAPASAN SECT),CDOC17K00032 · ₱90,717,434.31 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE, DAANG MAHARLIKA (AGUSAN - DAVAO ROAD), K1250+400 - K1251+542, AGUSAN DEL SUR16N00001 · ₱87,749,970.41 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
