OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, POBLACION ONDOL, RIGHT SIDE, LOBOC, BOHOL
OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, POBLACION ONDOL, RIGHT SIDE, LOBOC, BOHOL is a DPWH-tracked public work in Region VII, Region VII. Reported contract value: ₱241,249,985.55. Status: Past target date (DPWH On-Going). Contractor on record: HGG BUILDERS & SUPPLY 17824. Figures trace to dpwh.
Total Contract Cost
