OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (RIGHT SIDE), LOAY, BOHOL is a DPWH-tracked public work in Region VII, Region VII. Reported contract value: ₱236,298,990.16. Status: Past target date (DPWH On-Going). Contractor on record: SUPREME ABF CONST. Figures trace to dpwh.