Construction of Flood Control Structure - Lower Agusan Development Project, Flood Control (Bancasi Bridge Revetment Upstream and Downstream), Package 2, Butuan City, Agusan del Norte
Construction of Flood Control Structure - Lower Agusan Development Project, Flood Control (Bancasi Bridge Revetment Upstream and Downstream), Package 2, Butuan City, Agusan del Norte is a DPWH-tracked public work in BUTUAN CITY (CAPITAL) (AGUSAN DEL NORTE), AGUSAN DEL NORTE, Region XIII. Reported contract value: ₱192,999,989.20. Status: Reported complete (DPWH). Contractor on record: TRIPARCO DEVELOPMENT CORP. Figures trace to sumbong.
Total Contract Cost