HOMEWORLD CONST CORP FORMERLY HOMEWORLD E is listed as a company organization in Philippine public procurement records on this site, with 138 linked DPWH project(s) totaling about ₱5,203,904,133.54. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
HOMEWORLD CONST CORP FORMERLY HOMEWORLD E
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 138
- Total value
- ₱5,203,904,133.54
- Published flags
- 3
- Region
- Negros Occidental 1st DEO · Negros Island Region
Online presence
Google Maps: Homeworld Construction Corp.★ 5 (2 reviews)Google Maps, 2026-10-22
Carlos Hilado Ave, PX37+Q77, Circumferential Rd, Bata, Bacolod, Negros Occidental
Licensed officers (PCAB)
- Charles Anthony M. Dumancas · Authorized Managing Officer (PCAB license 14725) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for HOMEWORLD CONST CORP FORMERLY HOMEWORLD E — not an accusation or finding of wrongdoing.
Score: 84.70 / 100 · Projects in sample: 138 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 70.2/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 70.2
- lateCompletedProjects
- 19
- onTimeCompletedProjects
- 93
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 129
- pastTargetOngoingProjects
- 17
- undatedCompletedProjectsExcluded
- 9
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 138
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 138
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.3/100 · Weight: 11%
- projects
- 138
- componentScore
- 99.3
- flagsPerProject
- 0.02
- publishedV2Flags
- 3
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 138
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 138 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ILOG- HILABANGAN RIVER (DOWNSTREAM OF APPROACH A OF ILOG BR.), ILOG, NEGROS OCCIDENTAL25G00062 · ₱181,514,091.88 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MINULU- AN RIVER (BOTHSTREAM) AT BACOLOD NORTH RD, TALISAY CITY, NEGROS OCCIDENTAL25G00070 · ₱179,682,935.50 · mapped
- Construction of Flood Mitigation Structure along Ilog-Hilabangan River (Upstream of Approach A of Ilog Br.) Phase 2, Kabankalan City, Negros Occidental24GM0017 · ₱125,450,000.00 · mapped
- ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING : PRIMARY ROADS: DUMAGUETE SOUTH RD - K0054 + 473 - K0056 + 422, SIATON, NEGROS ORIENTAL24HL0030 · ₱104,220,000.00 · mapped
- REHABILITATION AND WATERLINE IMPROVEMENT, KABANKALAN CITY WATER DISTRICT, BARANGAY 8, KABANKALAN CITY, NEGROS OCCIDENTAL25RC0003 · ₱98,950,132.15 · mapped
- PREVENTIVE MAINTENNCE OF ROAD: ASPHALT OVERLAY-KABANKALAN-BAIS RD (S00240NR) K0096+987-K0099+00025RC0006 · ₱97,949,199.82 · mapped
- ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING - PRIMARY ROADS: DUMAGUETE SOUTH RD - K0052 + 251 - K0054 + 473, SIATON, NEGROS ORIENTAL23HL0050 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BRGY. RAFAELA, SAGAY CITY, NEGROS OCCIDENTAL24GK0191 · ₱96,497,794.31 · mapped
- ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE : TERTIARY ROADS: BAYAWAN-MABINAY RD. - K0136 + 116 - K0137 + 638, BAYAWAN CITY, NEGROS ORIENTAL25HL0062 · ₱95,534,685.02 · mapped
- ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE : TERTIARY ROADS: BAYAWAN-MABINAY RD. - K0137 + 638 - K0139 + 160, BAYAWAN CITY, NEGROS ORIENTAL25HL0063 · ₱93,624,122.42 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT: PAVING OF SHOULDERS - KABANKALAN-BAIS RD - K0094+071 - K0096+000, KABANKALAN CITY, NEGROS OCCIDENTAL25GM0007 · ₱88,395,741.86 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ON SPECIFIC LOCATIONS ALONG BACOLOD NORTH RD (S00425NR) K0096 + 660 - K0105 + 80023GQ0002 · ₱87,844,867.64 · mapped
- BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, SEGMENT 1, BACOLOD CITY24G00025 · ₱86,499,705.00 · mapped
- ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS: STA CATALINA-PAMPLONA-TANJAY CITY - K0072 + 297 - K0074 +284, STA.23HL0019 · ₱85,885,000.00 · mapped
- PREVENTIVE MAINTENANCE ALONG BACOLOD SOUTH RD (S00134NR) - K0046 + (-910) - K0047+000, K0047+487 - K0049 + 52421GL0071 · ₱84,007,110.00 · mapped
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT. BAGONAWA - LA CASTELLANA - ISABELA ROAD - K0040+765- K0042+64725GN0006 · ₱79,580,294.63 · mapped
- CONSTRUCTION OF CONCRETE ROAD - KABANKALAN-BAYAWAN BDRY. ROAD, NEGROS OCCIDENTAL, KABANKALAN CITY, NEGROS OCCIDENTAL23GM0032 · ₱67,550,000.00 · mapped
- RECONST. TO CONCRETE PAVEMENT-BACOLOD SOUTH RD (KABANKALAN-HINOBAAN SECTION)- K0090+312 -K0090+641, K0094+979 - K0095+921, K0095+937 - K0095+1036, K0096+287 - K0096+759, K0096+772 - K0097+079, K0097+133 - K0097+469, KABANKALAN CITY AND ILOG , NEG. OCC.23GM0028 · ₱67,550,000.00 · mapped
- RECONSTRUCTION TO CONCRETE PAVEMENT - BACOLOD SOUTH RD (KABANKALAN-HINOBAAN SECTION) - K0098+575 - K0099+935, K0133+683 - K0134+680, ILOG AND CAUAYAN, NEGROS OCCIDENTAL23GM0027 · ₱67,550,000.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - KABANKALAN - BAYAWAN BDRY. ROAD, NEGROS OCCIDENTAL, BRGY. BANTAYAN, KABANKALAN CITY, NEGROS OCCIDENTAL22GM0037 · ₱67,550,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - BAIS - KABANKALAN RD - K0094+000 - K0095+00025HK0040 · ₱63,855,677.50 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD SOUTH RD (S00134NR) - K0049+ 524 - K0051 + 209, K0056 + 000 - K0056 + 570, K0061 + 000 - K0061 + 76322GL0035 · ₱60,601,999.96 · mapped
- PREVENTIVE MAINTENANCE OF ROAD : ASPHALT OVERLAY-ALONG BACOLOD CITY BOUNDARY RD-K0009+014-K0009+340,K0012+047-K0013+108,K0014+401-K0015+445,K0018+850-K0019+58620GO0017 · ₱58,749,200.00 · mapped
- Construction of Flood Control Structure along Manjuyod River (Upstream and Downstream), Manjuyod, Negros Oriental24HJ0104 · ₱57,900,000.00 · mapped
- Construction of Flood Control Structure along Hibaiyo River Upstream, Guihulngan City, Negros Oriental24HJ0103 · ₱57,900,000.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD - K0021 + 349 - K0024 + 00024GK0104 · ₱57,238,972.05 · mapped
- PREVENTIVE MAINTENANCE- SECONDARY ROAD-BACOLOD CIRCUMFERENTIAL RD (S00097NR)-K0004+946-K0006+000,K0007+000-K0008+658,BACOLOD CITY,NEG.OCC22GO0004 · ₱53,262,210.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING-PRIMARY ROADS-BAIS-KABANKALAN RD-K0099+000-K0099+820, NEGROS ORIENTAL24HK0102 · ₱51,938,180.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - HINIGARAN - ISABELA RD -K0060 + 150 - K0061 + 573, K0062 + 654 - K0063 + 10024GL0064 · ₱51,872,723.55 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: BACOLOD NORTH RD (S00406NR) - K0029+975 - K0030 + 270, K0033+130 - K0033+185, K0033+210 - K0033+728, K0035+365 -K0036+00023GK0135 · ₱51,006,992.14 · mapped
- REHABILITATION AND WATERLINE IMPROVEMENT (KABANKALAN CITY WATER DISTRICT), BRGY. 8, KABANKALAN CITY, NEGROS OCCIDENTAL24GM0054 · ₱49,500,000.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG KABANKALAN - BAIS RD (S00240NR) - K0094+000 - K0102+00021G00044 · ₱49,436,950.00 · mapped
- Construction of Maladpad River Control, Downstream A, Siaton, Negros Oriental23HL0043 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - CONCRETING OF ROAD, BRGY. CONSING, EB MAGALONA, NEGROS OCCIDENTAL21GK0184 · ₱49,000,000.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY- BACOLOD CIRCUMFERENTIAL RD - K0003 + (-471) - K0003+000, K0003+(-535)-K0003+ (-471),K0003+000-K0003+264,K0003+307-K0004+946,BACOLOD CITY, NEGROS OCCIDENTAL21GO0003 · ₱48,923,903.42 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG HIBAIYO RIVER, GUIHULNGAN25HJ0015 · ₱48,510,181.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD:ASPHALT OVERLAY- BACOLOD SOUTH ROAD (KABANKALAN-HINOBAAN SECTION)( K0152+814 - K0154+027, K0155+1048-K0156+000, K0155+768-K0155+1048, K0156+000-K0157+874,K0157+884 - K0159+000, BRGY. CARTAGENA AND BRGY. CANTURAY, SIPALAY CIT21GM0002 · ₱47,040,000.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY AT SPECIFIC LOCATIONS ALONG BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD (S00009NR) K0082+660 - K0085+84120GK0147 · ₱46,451,601.52 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG DANCALAN - CANDONI - DAMUTAN VALLEY RD (S00247NR) K0103+447 - K0106+501, BRGY. DANCALAN, ILOG, NEGROS OCCIDENTAL22GM0046 · ₱45,902,220.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD (S00406NR) - K0027+000 - K0028+48722GK0119 · ₱44,660,520.00 · mapped
- ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT SAN ENRIQUE - PONTEVEDRA BY-PASS ROAD - K0043+000 - K0044+989, K00045+497 - K0045+821, K0046+079 - K0046+36525GN0061 · ₱44,614,728.75 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DANCALAN-CANDONI-DAMUTAN VALLEY RD, K0111+058 - K0113+382, ILOG, NEGROS OCCIDENTAL24GM0021 · ₱44,596,860.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH ROAD (S00393NR) - K0009+000 - K0009+777, (S00024NR) - K0005+(-790) - K0005+050, K0005+700 - K0006+000, (S00025NR) - K0006+(-174) - K0006+100, K0005+107 - K0005+77223GK0118 · ₱44,408,699.46 · mapped
- Construction of Manalongon River Control, Upstream A, Sta. Catalina, Negros Oriental23HL0012 · ₱44,100,000.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY- JCT. BAGONAWA- LA CASTELLANA- ISABELA RD- K0057 + 112 - K0058 + 900, CHAINAGE 0- CHAINAGE 1724GL0051 · ₱44,079,420.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD- ASPHALT OVERLAY BACOLOD CIRCUMFERENTIAL RD - K0007 + 634 K0008 +000, K 8+000- K0008+ 414 , K0008+ 414 -K0008+484, K0008+484 - K0008 + 63425GO0122 · ₱44,037,133.65 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD - K0036 + 000 - K0036 + 90225GK0030 · ₱42,610,653.48 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BACOLOD NORTH RD (S00389NR) - K0010+204 - K0011+98122GK0128 · ₱42,251,680.00 · mapped
- PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ISABELA-LIBAS NEGROS OCC. BDRY RD (S00374NR) - K0083 + 918 - K0085 + 625, K0087 + 000 - K0089 + 29622GL0022 · ₱40,729,644.50 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT: PAVING OF SHOULDERS - KABANKALAN-BAIS RD - K0096+000 - K0096+569, K0097+646 - K0098+000, KABANKALAN CITY, NEGROS OCCIDENTAL25GM0008 · ₱39,672,653.27 · mapped
Equipment & capacity
PCAB license
- License no.
- 14725
- Category
- AAA · Large B
- Minimum net worth for this category
- ₱180,000,000.00
- Allowable range of contract cost (ARCC)
- ₱450M or above (no published ceiling)
- License valid until
- Jan 29, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 14725); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
20 evaluations listed across 6 GPPB CPES releases; average final rating 91.9% over 9 rated projects; 20 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 26, 2025 | DPWH | ₱96,497,794.00 | Completed | 98.8% | 90.5% | 40th, p. 139 |
| Jun 9, 2025 | DPWH | ₱44,037,133.00 | Completed | 95.9% | 95.9% | 40th, p. 139 |
| Jun 6, 2025 | DPWH | ₱28,650,633.00 | On-going | 85.8% | — | 40th, p. 139 |
| Jun 5, 2025 | DPWH | ₱79,580,294.00 | On-going | 86.4% | — | 40th, p. 139 |
| Mar 21, 2025 | DPWH | ₱104,220,000.00 | Completed | 93.4% | 95.4% | 39th (rev), p. 90 |
| Mar 20, 2025 | DPWH | ₱57,900,000.00 | Completed | 93.1% | 93.1% | 39th (rev), p. 90 |
| Mar 18, 2025 | DPWH | ₱96,497,794.00 | On-going | 85.0% | — | 39th (rev), p. 90 |
| Nov 11, 2024 | DPWH | ₱13,316,259.00 | Completed | 87.1% | 87.1% | 40th, p. 139 |
| Nov 5, 2024 | DPWH | ₱57,900,000.00 | On-going | 90.8% | — | 39th (rev), p. 90 |
| Jul 29, 2024 | DPWH | ₱57,320,716.00 | On-going | 93.1% | — | 38th, p. 102 |
| Jul 28, 2024 | DPWH | ₱30,472,173.00 | On-going | 95.5% | — | 38th, p. 102 |
| Jul 28, 2024 | DPWH | ₱125,450,015.00 | On-going | 97.5% | — | 38th, p. 102 |
Showing the 12 most recent of 20.
1 amount flagged: the printed value is implausible for a ₱-thousands column or disagrees with the DPWH award, so we show it as printed instead of converting it.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →