BNR CONST is listed as a company organization in Philippine public procurement records on this site, with 70 linked DPWH project(s) totaling about ₱4,512,062,663.76. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
BNR CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 70
- Total value
- ₱4,512,062,663.76
- Published flags
- 0
- Region
- Cebu City DEO · Region VII
Public Record Grade
A transparent, data-derived summary of reported public records for BNR CONST — not an accusation or finding of wrongdoing.
Score: 81.40 / 100 · Projects in sample: 70 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 70.1/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 70.1
- lateCompletedProjects
- 3
- onTimeCompletedProjects
- 49
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 62
- pastTargetOngoingProjects
- 10
- undatedCompletedProjectsExcluded
- 8
- Termination rate
Component score: 95.7/100 · Weight: 24%
- totalProjects
- 70
- componentScore
- 95.7
- terminatedProjects
- 1
- terminationRatePct
- 1.4
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 70
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 70
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 70
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 44 of 62 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, ROAD CONCRETING OF SRP BACK ROAD (PHASE II),23H00112 · ₱289,499,995.71 · mapped
- METRO CEBU FLOOD CONTROL AND DRAINAGE IMPROVEMENT PROJECT, KINALUMSAN RIVER, DULJO, LABANGON AND MAMBALING, CEBU CITY23H00080 · ₱192,377,942.26 · mapped
- CONSTRUCTION OF ROAD, ALBUERA, DIVERSION ROAD (PHASE 2), ALBUERA, LEYTE23IF0077 · ₱144,749,997.68 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARA24HH0010 · ₱144,595,724.37 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -PREVENTIVE MAINTENANCE- TERTIARY ROADS- GOV. CUENCO AVE - K0009+(-206) - K0009+995, CHAINAGE 2937-CHAINAGE 3966, CEBU CITY24HH0081 · ₱143,874,320.90 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS-ALBUERA-BURAUEN ROAD, PACKAGE 2, LEYTE19IF0096 · ₱137,249,951.19 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS - BURAUEN - ALBUERA ROAD (ALBUERA SECTION), LEYTE23IF0072 · ₱115,799,998.75 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -PREVENTIVE MAINTENANCE - TERTIARY ROADS IMUS RD - CHAINAGE 0 - CHAINAGE 1076, CHAINAGE 0 -CHAINAGE 1070, CEBU CITY24HH0066 · ₱103,589,514.42 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, ALBUERA-BURAUEN ROAD (ALBUERA SECTION), PACKAGE 6, ALBUERA, LEYTE24IF0031 · ₱102,581,621.26 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, ALBUERA-BURAUEN ROAD (ALBUERA SECTION), PACKAGE 7, ALBUERA, LEYTE24IF0032 · ₱100,297,005.11 · mapped
- CONSTRUCTION OF LIBERTY - BURAUEN BRGY. ROAD, ORMOC CITY, LEYTE23IF0060 · ₱96,499,965.62 · mapped
- BURAUEN- ALBUERA ROAD, ALBUERA SECTION, PACKAGE 1, LEYTE, ALBUERA LEYTE20IF0044 · ₱96,398,963.95 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROADSYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-TERTIARY ROADS- CEBU CIRCUMFERENCIAL RD (KATIPUNAN ST)-(S00345CB) CHAINAGE 000-CHAINAGE 995 (S00346CB) CHAINAGE 000-CHAINAGE 931, CEBU CITY23HH0009 · ₱96,364,555.44 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CEBU BALAMBAN TRANSCENTRAL HIGHWAY-K0009+240-K0009+280, CEBU CITY, CEBU25HH0160 · ₱96,351,715.63 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KINALUMSAN RIVER, B24HH0021 · ₱96,350,995.80 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CEBU BALAMBAN TRANSCENTRAL HIGHWAY-K0009+200-K0009+240, CEBU CITY, CEBU25HH0159 · ₱96,346,425.40 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD WITH SLOPE PROTECTION STR25HH0121 · ₱96,250,667.01 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, ALBUERA-BURAUEN ROAD(ALBUERA SECTION), PACKAGE 8, ALBUERA, LEYTE25IF0064 · ₱96,165,482.55 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - MARCELO FERNAN BR. (B00619CB) ALONG MARCELO B. FERNAN BR. & APPROACHES, MANDAUE CITY20HN0040 · ₱93,090,161.53 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE- BURAUEN- ALBUERA ROAD (ALBUERA SECTION), PACKAGE 3, LEYTE21IF0066 · ₱91,527,403.55 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - BURAUEN-ALBUERA RD (ALBUERA SECTION), PACKAGE 2, LEYTE21IF0032 · ₱91,482,644.20 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-SECONDARY ROADS- SALINAS DRIVE-(S00026CB) CHAINAGE 000 - CHAINAGE 1198, CEBU CITY23HH0060 · ₱87,566,682.34 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -SECONDARY ROADS- CEBU SOUTH COASTAL RD -(S00134CB)- K0008+(-767)-K0008+000, (S00135CB) K0008+000-K0008+536, CEBU CITY25HH0057 · ₱86,601,006.38 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BUTUANON RIVER, BRGY. BINALIW, CEBU C19HH0051 · ₱79,199,869.23 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- BRIDGE PROGRAM - REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - INAYAWAN BR. (B00080CB) ALONG CEBU SOUTH COASTAL RD, CEBU CITY24HH0007 · ₱72,228,789.99 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD WITH SLOPE PROTECTION ST24HH0122 · ₱71,320,445.36 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BRGY. BUDLAAN, CEBU CIT25HH0062 · ₱67,301,440.63 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-TERTIARY ROADS- GORORDO AVE- K0003+(-870) - K0003+757, CEBU CITY23HH0053 · ₱63,677,196.71 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT KINALUMSAN RIVER, BRGY. BUHISAN, CEBU CI19HH0105 · ₱63,182,320.76 · mapped
- OO2: ENSURE LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BRGY. PULANGBATO, CEBU21HH0037 · ₱59,085,647.05 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY PIT-OS, CEBU CITY25HH0034 · ₱58,945,538.39 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, BURAUEN-ALBUERA ROAD (ALBUERA SECTION) PACKAGE 4, LEYTE22IF0031 · ₱54,039,804.41 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS -FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUTUANON21HN0001 · ₱52,757,424.75 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -PRIMARY ROADS-CEBUNORTH HAGNAYA WHARF ROAD-K0008+(-703) - K0008+317, K0008+953 -K0009+205, MANDAUE CITY, CEBU20HN0011 · ₱49,446,784.43 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-TERTIARY ROADS-CEBU NORTH RD.-K0003+(-230)-K0003+000, K0003+466- K0004+000, CEBU CITY22HH0034 · ₱49,000,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL AND MITIGATION STRUCTURES ALONG SUBANGDAKU RIVER, NORTH RECLAMATION AREA AND BRGY. MABOLO, CEBU CITY17HH0017 · ₱48,999,926.59
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, BURAUEN-ALBUERA ROAD (ALBUERA SECTION) PACKAGE 5, LEYTE22IF0043 · ₱48,999,854.81 · mapped
- CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AT BRGY. BUDLAAN, CEBU CITY17HH0009 · ₱48,901,998.96
- CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES ALONG MABOLO CREEK, SITIO MAGTALISAY AND SITIO LAHING LAHING, CEBU CITY17HH0024 · ₱48,901,962.15
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS - F. CABAHUG EXT/F. CABAHUG BR-(S00042CB) - CHAINAGE 488 - CHAINAGE 1166, CEBU CITY25HH0042 · ₱48,549,769.75 · mapped
- CONSTRUCTION OF ROAD WITH SLOPE PROTECTION, ALBUERA-BURAUEN ROAD (ALBUERA SECTION) ALBUERA, LEYTE19IF0083 · ₱46,777,378.00 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG GUADALUPE RIVER, BRGY. KALUNASAN, CEBU20HH0020 · ₱46,542,374.40 · mapped
- REHAB/RECONST OF NAT'L ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS, CEBU-BALAMBAN TRANSCENTRAL HIGHWAY, K0025+400-K0025+595, K0028+145-K0028+220, CEBU CITY15HH0136 · ₱46,084,473.15 · mapped
- CONSTRUCTION OF CATCHBASIN OF SUBANGDAKU RIVER (STEEL SHEET PILE WITH COPING) AT UPSTREAM AND DOWNSTREAM OF CIP BRIDGE, SECOND AVENUE, NORTH RECLAMATION AREA, CEBU CITY15HH0132 · ₱45,988,984.20
- IMPROVEMENT/REHABILITATION OF FLOOD CONTROL STRUCTURE INCLUDING DREDGING/RECHANNELING OF BRIDGE WATERWAYS ALONG CANSAGA RIVER, CONSOLACION,CEBU (PHASE II)15HN0173 · ₱45,582,505.90
- IMPROVEMENT/REHABILITATION OF FLOOD CONTROL STRUCTURE INCLUDING DREDGING/RECHANNELING OF BRIDGE WATERWAYS ALONG BUTUANON RIVER, MANDAUE15HN0172 · ₱45,582,505.90
- CLUSTER II OO1:ENSURE SAFE & RELIABLE NAT'L. RD. SYS-ASSET PRESERVATION PROG-PREVENTIVE MAINT.-PRIMARY RDS- A.)CNHWR- K0010+222-K0010+694 B.)CNHWR-K0005+100-K0005+492,K0005+676-K0005+986 & C.)CNHWR-(S00270CB) CHAINAGE 000 -CHAINAGE 193, CHAINAGE 693-80022HN0021 · ₱44,100,000.00 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BUTUANON RIVER, BRGY. TALAMBAN-BACAYAN, CEBU CITY18HH0023 · ₱42,979,027.40 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -PRIMARY ROADS - CEBU NORTH HAGNAYA WHARF ROAD - K0005+(-710) -K0005+100, CHAINAGE 800 - CHAINAGE 1011, MANDAUE CITY, CEBU20HN0012 · ₱42,058,880.86 · mapped
- CONSTRUCTION OF CONCRETE ROAD WITH SLOPE PROTECTION, ALBUERA- BURAUEN ROAD, LEYTE20IF0086 · ₱41,852,581.47 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →