Flood Control and Drainage17HH0024No coordinates published by DPWH

CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES ALONG MABOLO CREEK, SITIO MAGTALISAY AND SITIO LAHING LAHING, CEBU CITY

CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES ALONG MABOLO CREEK, SITIO MAGTALISAY AND SITIO LAHING LAHING, CEBU CITY is a DPWH-tracked public work in Cebu City DEO, Region VII. Reported contract value: ₱48,901,962.15. Status: Reported complete (DPWH). Contractor on record: BNR CONST. Figures trace to dpwh.

Cebu City DEO, Region VII

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Region VII

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱49,900

    Probable match · score 0.94

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-D-17-0022755 · ₱2,108,129 · release to the district office, not itemized per project

    Possible match · score 0.71

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱45,339,081 · BNR CONSTRUCTION AND DEVELOPMENT

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-05-15 → 2026-02-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES ALONG MABOLO CREEK, SITIO MAGTALISAY AND SITIO LAHING LAHING, CEBU CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 94%

UACS
18001
Amount
₱49,900,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Maintenance of Flood Control Mitigation Structures along Mabolo Creek, Sitio Magtalisay and Sitio Lahing Lahing, Cebu City
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-D-17-0022755

₱2,108,129.00 · FY2017

Released to Philippine Air For ( Air Forces ) (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction / Maintenance of Flood Control Mitiga

₱45,339,080.78 · BNR CONSTRUCTION AND DEVELOPMENT

Award / contract ref: 17HH0024

Contractor

B

70 projects · ₱4.5B total · 0 flags

Other projects by this contractor

View all 70 projects →

4. Implementation

Contract Amount

₱48,901,962.15

Progress

Reported complete (DPWH)

Start Date

March 24, 2017

Target End

November 7, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES ALONG MABOLO CREEK, SITIO MAGTALISAY AND SITIO LAHING LAHING, CEBU CITY.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/3ef6223b-2786-47c5-b12a-1933694648f1

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)City of Cebu
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.