ZLREJ TRADING AND CONST CORP is listed as a company organization in Philippine public procurement records on this site, with 119 linked DPWH project(s) totaling about ₱8,537,932,114.16. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
ZLREJ TRADING AND CONST CORP
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 119
- Total value
- ₱8,537,932,114.16
- Published flags
- 1
- Region
- Cebu 6th DEO · Region VII
Licensed officers (PCAB)
- JEROME GUINARES AWIT · Authorized Managing Officer (PCAB license 49171) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for ZLREJ TRADING AND CONST CORP — not an accusation or finding of wrongdoing.
Score: 71.20 / 100 · Projects in sample: 119 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 39.4/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 39.4
- lateCompletedProjects
- 0
- onTimeCompletedProjects
- 65
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 115
- pastTargetOngoingProjects
- 50
- undatedCompletedProjectsExcluded
- 4
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 119
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 119
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.7/100 · Weight: 11%
- projects
- 119
- componentScore
- 99.7
- flagsPerProject
- 0.01
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 119
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 119 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, CEBU SOUTH COASTAL RD - (S00015CB) CHAINAGE 510 - CHAINAGE 101925H00005 · ₱221,398,379.92 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, CEBU SOUTH COASTAL RD - CHAINAGE 0 - CHAINAGE 51024H00029 · ₱192,899,999.98 · mapped
- CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF STORM SURGE PROTECTION STRUCTURES AT BRGY. GUINTABOAN, UBAY, BOHOL24H00133 · ₱192,849,381.95 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, CANSAGA BAY BR. (B00613CB) ALONG CANSAGA BAY BRIDGE, CEBU22H00002 · ₱173,699,966.44 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES, VIADUCT BR. (B00081CB) ALONG CEBU SOUTH COASTAL RD24H00003 · ₱173,699,924.88 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, MARCELO FERNAN BR. (B00619CB) ALONG MARCELO B. FERNAN BR. & APPROACHES24H00012 · ₱173,698,961.33 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, BRIDGE PROGRAM, RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, MARCELO FERNAN BR. (B00619CB) ALONG MARCELO B. FERNAN BR. & APPROACHES25H00038 · ₱173,600,000.00 · mapped
- OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF WAHIG RIVER CONTROL, PHASE 4, SIERRA BULLONES, BOHOL24H00018 · ₱173,599,999.98 · mapped
- CSSP, SUSTAINABLE INFRASTRUCTURE PROJ. ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG MAHIGA CREEK, BARANGAY SUBANGDAKU,MANDAUE CITY, CEBU (PACKAGE II)24H00032 · ₱173,599,999.98 · mapped
- CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, BARANGAY TABOK (PHASE IV), MANDAUE CITY, CEBU24H00019 · ₱173,599,999.97 · mapped
- OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, MANDAUE CITY, CEBU23H00058 · ₱173,499,999.97 · mapped
- CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER (PHASE 7), BARANGAY TINGUB TO BARANGAY CANDUMAN, MANDAUE CITY, CEBU25H00024 · ₱163,249,999.99 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, MARCELO FERNAN BR. (B00619CB) ALONG MARCELO B. FERNAN BR. & APPROACHES, PHASE II, CEBU PROVINCE21H00065 · ₱144,749,991.88 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, MARCELO FERNAN BR. (B00619CB) ALONG MARCELO B. FERNAN BR. & APPROACHES (PHASE IV), CEBU PROVINCE23H00008 · ₱144,749,397.99 · mapped
- REHABILITATION/RECONSTRUCTION OF MAGTIACO FLOOD CONTROL/BRGY. SAN PEDRO, ALEGRIA SURIGAO DEL NORTE23NG0130 · ₱144,749,369.17 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES, VIADUCT BR. (B00081CB) ALONG CEBU SOUTH COASTAL RD25H00004 · ₱144,649,999.98 · mapped
- CP: SPECIAL ROAD FUND-MVUC AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MCR - K0018+023 - K0020+151, K0031+765-K0034+775 (MODIFIED TO: K0011+(-634) - K0013+043, K0019+171-K0020+151, K0031+765 -K0034+775)25HN0137 · ₱141,850,000.00 · mapped
- OO2: FLOOD MANAGEMENT PROGRAM - CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BRGY. NANGKA, CONSOLACION, CEBU24HN0040 · ₱135,000,000.00 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK (DOWNSTREAM), CONSOLACION, CEBU25HN0089 · ₱135,000,000.00 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION FACILITY ALONG JAGOBIAO CREEK, PHASE 3, BRGY. CASILI,MANDAUE CITY, CEBU25HN0013 · ₱125,350,000.00 · mapped
- OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, BRGY. MAGUIKAY, PHASE 3, MANDAUE CITY, CEBU24HN0009 · ₱122,971,880.00 · mapped
- OO2: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARANGAY PAKNA-AN (LEVEL 2), MANDAUE CITY, CEBU24HN0057 · ₱122,871,880.00 · mapped
- OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARANGAY UMAPAD (LEVEL 2), MANDAUE CITY, CEBU24HN0064 · ₱122,871,880.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, MANDAUE-MACTAN BR. 1 (B00587CB) ALONG AC CORTES AVE (PHASE III), CEBU PROVINCE23H00006 · ₱115,799,893.87 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TALAYONG SECTION,23HO0284 · ₱115,698,252.19 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG., CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, PHASE 6, BRGY. TINGUB TO BRGY.CANDUMAN,MANDAUE25H00014 · ₱101,224,999.99 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF FLYOVERS/ INTERCHANGES/ UNDERPASSES/ LONG SPAN BRIDGES, TRI-LEVEL INTERCHANGE ALONG CEBU NORTH HAGNAYA WHARF ROAD (M.C. BRIONES STREET) CORNER U.N. AVENUE24H00181 · ₱100,259,999.95 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG OREL CREEK (PHASE 2), BARANGAY BANILAD, MANDAUE CITY, CEBU25H00015 · ₱98,899,999.99 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD - K0157 + 900 - K0158 + 123HO0181 · ₱96,473,348.74 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, PHASE 4, BARANGAY MAGUIKAY, MANDAUE CITY, CEBU25HN0003 · ₱96,400,000.00 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM -CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST. OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER (PHASE IV), BARANGAY NANGKA, CONSOLACION, CEBU25HN0004 · ₱96,400,000.00 · mapped
- CSSP: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR PAVEMENT STUDS ALONG NATIONAL ROADS (AC CORTES AVENUE, AS FORTUNA ST., HERNAN CORTES ST. AND M. LOGARTA RD), MANDAUE CITY, CEBU23HN0112 · ₱96,400,000.00 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST. OF FLOOD CONTROL STRUCTURE ALONG MAHIGA RIVER, BRGY. SUBANGDAKU (PHASE 4), MANDAUE CITY, CEBU25HN0053 · ₱96,400,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL, PACKAGE 2, SITIO KANDUONG TO SITIO LAWAAN, BAR25HO0068 · ₱96,399,998.92 · mapped
- Construction of Flood Control Structure, Sitio Ponod to Sitio Sarangani, Brgy. Poblacion, Candijay, Bohol24HB0001 · ₱96,399,998.65 · mapped
- CONSTRUCTION OF GIBONG RIVER BANK SLOPE PROTECTION STRUCTURE ALONG BARANGAY LAS NAVAS, PROSPERIDAD, AGUSAN DEL SUR, PROSPERIDAD, AGUSAN DEL SUR25NB0038 · ₱96,399,991.85 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO KANG-IRONG TO SITIO LOWER POBLACION, B25HO0047 · ₱96,399,910.79 · mapped
- INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG NRJ AWA-LIANGA ROAD - K1291+(-852) - K1298+000, PROSPERIDAD, AGUSAN DEL SUR24NB0094 · ₱96,399,805.94 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GIBONG RIVER (LA SUERTE SECTION), PROSPERIDAD, AGUSAN DEL SUR PHASE III, PROSPERIDAD, AGUSAN DEL SUR25NB0037 · ₱96,399,761.07 · mapped
- INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG NJR BAHBAH-TALACOGON ROAD - K1294+(-499) - K1300+000, PROSPERIDAD, AGUSAN DEL SUR24NB0093 · ₱96,399,299.76 · mapped
- INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG NRJ BAYUGAN-ESPERANZA ROAD - K1270+(-976) - K1276+221, BAYUGAN, AGUSAN DEL SUR24NB0095 · ₱96,398,125.83 · mapped
- CONSTRUCTION OF RIVER BANK PROTECTION ALONG GIBONG RIVER, PHASE II, BARANGAY LA SUERTE, PROSPERIDAD, AGUSAN DEL SUR, PROSPERIDAD, AGUSAN DEL SUR25NB0015 · ₱96,398,068.89 · mapped
- CSSP: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED STREET LIGHTS ALONG HERNAN CORTES ST. & UN AVENUE, MANDAUE CITY, CEBU23HN0193 · ₱96,295,000.00 · mapped
- CSSP: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED STREET LIGHTS ALONG M. LOGARTA RD & ML QUEZON ST., MANDAUE CITY, CEBU23HN0192 · ₱96,295,000.00 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE AT LIMOCON, VALENCIA, BOHOL, STA. 0+000.00 - STA.0+102.0023HB0164 · ₱96,267,191.63 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM; ASSET PRESERVATION PROGRAM; REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS: N. BACALSO AVE (CEBU SOUTH RD) - K0081+621.00 - K0081+67023HG0049 · ₱96,040,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD - K0158 + 118 - K0158 +23HO0182 · ₱96,024,531.17 · mapped
- SSP: SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARANGAY CASUNTINGAN TO BARANGAY CABANCALAN (PHASE 7), MANDAUE CITY, CEBU25HN0127 · ₱94,565,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, ARGAO-RONDA RD - K0080 + 800 - K0081 + 00023HO0167 · ₱90,191,834.21 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, ARGAO-RONDA RD - K0080 + 200 - K0080 + 39423HO0168 · ₱87,050,783.25 · mapped
Equipment & capacity
PCAB license
- License no.
- 49171
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Feb 8, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 49171); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
23 evaluations listed across 7 GPPB CPES releases; average final rating 93.9% over 9 rated projects; 23 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Nov 13, 2025 | DPWH (JV) | ₱173,600,000.00 | On-going | 95.4% | — | 39th (rev), p. 80 |
| Jun 26, 2025 | DPWH | ₱96,399,999.00 | Completed | 88.9% | 93.1% | 40th, p. 332 |
| Jun 25, 2025 | DPWH | ₱57,899,805.00 | Completed | 89.8% | 94.8% | 40th, p. 332 |
| Jun 25, 2025 | DPWH | ₱39,565,619.00 | Completed | 93.0% | 94.6% | 40th, p. 332 |
| Jun 6, 2025 | DPWH 06/10/2025 DPWH ########### 316 O 0.2670 0.3000 0.1500 0.0300 0.0330 0.0500 83.00% - On-Going | ₱144,650,000.00 | On-going | 95.4% | — | 40th, p. 332 |
| Jun 4, 2025 | DPWH | 29,700,000.000 (₱ thousands, as printed; flagged) | On-going | 80.9% | — | 40th, p. 332 |
| Mar 25, 2025 | DPWH | ₱96,399,387.00 | On-going | 85.6% | — | 39th (rev), p. 234 |
| Nov 12, 2024 | DPWH (JV) | ₱192,900,000.00 | On-going | 94.8% | — | 39th (rev), p. 234 |
| Nov 6, 2024 | DPWH | ₱57,899,804.00 | On-going | 98.1% | — | 40th, p. 332 |
| Jul 31, 2024 | DPWH (JV) | ₱173,600,000.00 | On-going | 97.3% | — | 38th, p. 93 |
| Jul 24, 2024 | DPWH | ₱96,400,000.00 | On-going | 95.9% | — | 38th, p. 263 |
| Apr 23, 2024 | DPWH (JV) | ₱96,024,531.00 | Completed | 93.9% | 93.8% | 38th, p. 261 |
Showing the 12 most recent of 23.
1 amount flagged: the printed value is implausible for a ₱-thousands column or disagrees with the DPWH award, so we show it as printed instead of converting it.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
- DPWH Infrastructure: 129 awards · ₱8,781,814,868.79
- City of Bais Infrastructure: 1 award · ₱4,927,900.47
- Municipality of San Francisco, Cebu Infrastructure: 1 award · ₱3,000,000.00
- 25NB0037₱96,399,809.12· 2025-10-06· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - AGUSAN DEL SUR 1ST
- Construction Project₱72,271,714.82· 2025-06-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 7TH DEO
- Construction Project₱72,274,997.07· 2025-06-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 7TH DEO
- 25HB0002₱71,436,415.00· 2025-05-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BOHOL 3RD DEO
- 25NB0038₱96,399,996.11· 2025-05-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - AGUSAN DEL SUR 1ST
- 25N0128₱24,965,400.00· 2025-05-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 6TH DEO
- 25HN0127₱94,565,000.00· 2025-05-20· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 6TH DEO
- 25NB0015₱96,399,447.95· 2025-05-15· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - AGUSAN DEL SUR 1ST
- 25HD0110₱4,945,000.00· 2025-03-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 2ND DEO
- 25H00024₱163,249,999.99· 2025-03-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ( REGIONAL OFFICE VI
- 25H00015₱98,899,999.99· 2025-03-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ( REGIONAL OFFICE VI
- 25HD0101₱9,645,000.00· 2025-03-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 2ND DEO
- 24H00181₱100,259,999.95· 2025-03-17· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ( REGIONAL OFFICE VI
- 25HN0137₱141,850,000.00· 2025-03-06· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 6TH DEO
- Construction Project₱57,799,980.00· 2025-02-28· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 7TH DEO
- 24H00169₱14,824,999.87· 2025-02-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ( REGIONAL OFFICE VI
- 25HD0059₱9,895,000.00· 2025-02-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 2ND DEO
- CONSTRUCTION PROJECT₱49,400,000.00· 2025-02-24· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - BOHOL 2ND DEO
- 25H00061₱4,899,999.93· 2025-02-13· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ( REGIONAL OFFICE VI
- Construction Project₱96,399,910.79· 2025-02-12· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 7TH DEO
- 25HN0053₱96,400,000.00· 2025-02-12· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 6TH DEO
- Construction Project₱96,399,998.92· 2025-02-12· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 7TH DEO
- 25HN0013₱125,350,000.00· 2025-02-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 6TH DEO
- 25HN0016₱72,275,000.00· 2025-02-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 6TH DEO
- 25HN0004₱96,400,000.00· 2025-02-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - CEBU 6TH DEO
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →