JJ &J CONST & GEN SUPPLY is listed as a company organization in Philippine public procurement records on this site, with 34 linked DPWH project(s) totaling about ₱3,698,368,221.54. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
JJ &J CONST & GEN SUPPLY
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 34
- Total value
- ₱3,698,368,221.54
- Published flags
- 1
- Region
- Region VII · Region VII
Online presence
Google Maps: JJ&J Construction and General Supply★ 4.9 (9 reviews)Google Maps, 2026-10-22
Zone Sunlot, Lapu-Lapu, 6015 Cebu
Licensed officers (PCAB)
- Jay Alexander A. Ruiz · Authorized Managing Officer (PCAB license 30231) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for JJ &J CONST & GEN SUPPLY — not an accusation or finding of wrongdoing.
Score: 78.70 / 100 · Projects in sample: 34 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 60.7/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 60.7
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 25
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 34
- pastTargetOngoingProjects
- 8
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 34
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 34
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.1/100 · Weight: 11%
- projects
- 34
- componentScore
- 99.1
- flagsPerProject
- 0.03
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 34
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
33 geotagged projects — Open full map
- LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, BUILDINGS AND OTHER STRUCTURES, MULTI-PURPOSE/FACILITIES, EXPANSION OF RUNWAY AND ALL OTHER STRUCTURES AT CANG-ALWANG AIRPORT TO INCLUDE THE P18H00057 · ₱424,704,955.99 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, METRO CEBU EXPRESSWAY, INCLUDING ROW, CEBU, STA.00+000 TO 02+500, CEBU PROVINCE18H00046 · ₱276,396,965.70 · mapped
- CSSP , SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT CAMANCHILLES RIVER, BRGY.TALAVERA, TOLEDO CITY, CEBU24H00007 · ₱212,299,996.48 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, BARILI, CEBU23H00118 · ₱197,800,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (CEBU PROVINCIAL GOVERNMENT CENTER), BALAMBAN, CEB22H00024 · ₱193,000,000.00 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SANTA ANA RIVER, BARANGAY CAMPANGGA, BARILI, CEBU25H00031 · ₱183,333,710.00 · mapped
- MFO-3 MAINTENANCE AND CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURES, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, STA. ROSA CAUSEWAY, OLANGO ISLAND, LAPU-LAPU CITY LONE DISTRICT, OLANGO ISLAND, CEBU PROVINCE17H00021 · ₱144,712,674.53
- LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, NATIONAL ROADS AND BRIDGES, CONCRETING OF POBLACION-DOBDOB-TALAYONG TAYTAY ROAD CONNECTING POBLACION URBAN DISTRICT AND BADIAN-DALAGUETE NATIONAL ROAD, CEBU, STA.0+000-STA.0+659.68-STA.0+686.15-STA.4+46019H00022 · ₱127,620,923.72 · mapped
- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES- MAKATI-MANDALUYONG BRIDGE (B04891LZ) ALONG MAKATI- MANDALUYONG BRIDGE, CITIES OF MAKATI AND MANDALUYONG19O00032 · ₱127,000,608.99 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS BARILI-ALOGUINSAN COASTAL ROAD, CEBU, SECTION 1: STA.0+000-STA.1+035, SECTION 2: STA.0+000-STA.1+324, SECTION 320H00030 · ₱124,749,709.21 · mapped
- REHABILITATION/RECONSTRUCTION OF TOLEDO-PINAMUNGAHAN-ALOGUINSAN-MANTALONGON RD K0073+960-K0074+12223HF0118 · ₱101,325,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP), MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM, CONSTRUCTION OF MULTI-PURPOSE BUILDING (CEBU PROVINCIAL GOVERNMENT CENTER), PHASE II, BALAMBAN, CEB23H00076 · ₱98,699,999.95 · mapped
- REPAIR/REHABILITATION OF ROAD SLOPE PROTECTION ALONG CARCAR-BARILI ROAD, K0052+650 - K0052+94023HF0114 · ₱96,500,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BARILI - ALOGUINSAN COASTAL ROAD, PHASE 5, CEBU24H00027 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF BARILI-ALOGUINSAN BYPASS ROAD, BARILI, CEBU20HF0057 · ₱96,499,924.91 · mapped
- CONSTRUCTION OF ROAD SLOPE PROTECTION ALONG BARILI-ALOGUINSAN BYPASS RD., BRGY. HILAGASAN, BARILI, CEBU, STA. 0+000.00 - STA. 0+219.0022HF0077 · ₱96,497,907.40 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION OF TOLEDO-PINAMUNGAHAN-ALOGUINSAN-MANTALONGON RD - K0074 + 400 - K0074 + 800 WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE22HF0026 · ₱96,278,011.84 · mapped
- REPAIR/REHABILITATION OF ROADSIDE PROTECTION ALONG CEBU-BALAMBAN TRANSCENTRAL ROAD, K0036+100 - K0036+250 RS, K0037+400 - K0037+500 RS AND K0041+700 - K0041+75023HF0115 · ₱95,726,069.80 · mapped
- REHABILITATION OF FLOOD CONTROL STRUCTURE AT CAMANCHILLES RIVER, BRGY. CAPT. CLAUDIO, TOLEDO CITY24HF0106 · ₱94,570,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BARILI-ALOGUINSAN COASTAL ROAD, CEBU, STATION 0+000-STATION 1+722, CEBU PROVINCE21H00018 · ₱87,351,729.14 · mapped
- ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - TOLEDO-PINAMUNGAHAN- ALOGUINSAN-MANTALONGON RD - K0085 + 500 - K008625HF0069 · ₱81,825,000.00 · mapped
- Construction of Weir Dam at Sapangdaku River (Phase II), Barangay Daanglungsod - Barangay Dumlog, Toledo City, Cebu24HF0013 · ₱77,200,000.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE-SECONDARY ROADS-MACTAN CIRCUMFERENTIAL ROADS - K0011+235-K0013+043, K0035+440- K0035+591, LAPU-LAPU CITY, CEBU20HN0020 · ₱71,634,588.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS- MACTAN CIRCUMFERENTIAL RD - K0014 + (-962) - K0014 + 000, K0024 + 000 - K0025 + 065, LAPU-LAPU CITY22HN0019 · ₱67,550,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS, MACTAN CIRCUMFERENTIAL RD INCL ROW, K0015+900-K0017+377018H00020 · ₱58,835,861.23 · mapped
- ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM -ROAD WIDENING -SECONDARY ROADS- MACTAN CIRCUMFERENTIAL RD INCL. ROW-K0017+377-K0018+918H00044 · ₱57,980,194.73 · mapped
- Construction of Flood Mitigation Structure at Sapangdaku River (Tributary Area), Barangay Juan Climaco Sr., Toledo City, Cebu23HF0030 · ₱48,994,486.80 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BARANGAY KAMANS25HF0038 · ₱48,789,610.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY JAGBUAYA25HF0042 · ₱48,698,500.00 · mapped
- ASSET PRESERVATION OF NATIONAL ROADS, REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NAT16H00004 · ₱48,328,627.02 · mapped
- CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTION SYSTEM, WATER SUPPLY SYSTEM- CONSTRUCTION OF LEVEL III WATER SUPPLY PROJECT BIEN UNIDO, BOHOL21HC0042 · ₱40,133,187.40 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE ALONG TOLEDO-PINAMUNGAHAN-ALOGUINSAN-MANTALONGON RD - K0086+784 - K0087+54222HF0104 · ₱37,929,985.90 · mapped
- Rehabilitation of Flood Mitigation Structure at Sapangdaku River, Barangay Ilihan, Toledo City, Cebu23HF0039 · ₱19,599,992.80 · mapped
- Rehabilitation of Flood Mitigation Structure at Langoyon River, Tuburan, Cebu24HF0044 · ₱19,300,000.00 · mapped
Across government
No DepEd or DOH contract awards matched to this name in PhilGEPS records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
