Roads20HN0020

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE-SECONDARY ROADS-MACTAN CIRCUMFERENTIAL ROADS - K0011+235-K0013+043, K0035+440- K0035+591, LAPU-LAPU CITY, CEBU

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE-SECONDARY ROADS-MACTAN CIRCUMFERENTIAL ROADS - K0011+235-K0013+043, K0035+440- K0035+591, LAPU-LAPU CITY, CEBU is a DPWH-tracked public work in Cebu 6th DEO, Region VII. Reported contract value: ₱71,634,588.00. Status: Reported complete (DPWH). Contractor on record: JJ &J CONST & GEN SUPPLY. Figures trace to dpwh.

Cebu 6th DEO, Region VII
Region: Region VII

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱3,000 (shared by many projects, not this project's own line)

    Possible match · score 0.79

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-BMB-E-20-0005751 · ₱8,048,816 · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱71,634,588 · JJ&J CONSTRUCTION AND GENERAL SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-03-17 → 2026-02-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱36,566,916 per km= 1.2x the Region VII median (n=215)

Contract cost ₱71,634,588 ÷ 1.959 km read from the DPWH title (“K0011+235-K0013+043; K0035+440- K0035+591”; K-post / station range length). National percentile: 66. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE-SECONDARY ROADS-MACTAN CIRCUMFERENTIAL ROADS - K0011+235-K0013+043, K0035+440- K0035+591, LAPU-LAPU CITY, CEBU

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 79%

UACS
18001
Amount
₱3,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Control Structure at Brgy. Poblacion, Cordova, Cebu
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-E-20-0005751

₱8,048,815.67 · FY2020

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

20HN0020

₱71,634,588.00 · JJ&J CONSTRUCTION AND GENERAL SUPPLY

Award / contract ref: 20HN0020

Contractor

C

34 projects · ₱3.7B total · 1 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, BUILDINGS AND OTHER STRUCTURES, MULTI-PURPOSE/FACILITIES, EXPANSION OF RUNWAY AND ALL OTHER STRUCTURES AT CANG-ALWANG AIRPORT TO INCLUDE THE P

Region VII, Region VII

2018₱424.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, METRO CEBU EXPRESSWAY, INCLUDING ROW, CEBU, STA.00+000 TO 02+500, CEBU PROVINCE

Region VII, Region VII

2018₱276.4M
Reported complete (DPWH)

CSSP , SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT CAMANCHILLES RIVER, BRGY.TALAVERA, TOLEDO CITY, CEBU

Region VII, Region VII

2024₱212.3M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, BARILI, CEBU

Region VII, Region VII

2023₱197.8M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (CEBU PROVINCIAL GOVERNMENT CENTER), BALAMBAN, CEB

Region VII, Region VII

2022₱193.0M
Past target date (DPWH On-Going)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SANTA ANA RIVER, BARANGAY CAMPANGGA, BARILI, CEBU

Region VII, Region VII

2025₱183.3M
Past target date (DPWH On-Going)
View all 34 projects →

4. Implementation

Contract Amount

₱71,634,588.00

Progress

Reported complete (DPWH)

Start Date

December 10, 2020

Target End

February 23, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)City of Lapu-LapuPajo
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.