Roads17EB0060

NETWORK DEVELOPMENT OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, CROSSING MWCR (POLA)-CASAGUE-JCT ALAKAAC RD K0379 + 996 K0381 + 308, S00163MR, SANTA CRUZ, OCCIDENTAL MINDORO

NETWORK DEVELOPMENT OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, CROSSING MWCR (POLA)-CASAGUE-JCT ALAKAAC RD K0379 + 996 K0381 + 308, S00163MR, SANTA CRUZ, OCCIDENTAL MINDORO is a DPWH-tracked public work in Mindoro Occidental DEO, Region IV-B. Reported contract value: ₱35,945,766.17. Status: Reported complete (DPWH). Contractor on record: ARKY CONST AND SUPPLY. Figures trace to dpwh.

Mindoro Occidental DEO, Region IV-B
Region: Region IV-B

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱30,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-17-0000040 · ₱213,291 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17EB0060 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-02-21 → 2025-08-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: NETWORK DEVELOPMENT  OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, CROSSING MWCR (POLA)-CASAGUE-JCT ALAKAAC RD K0379 + 996  K0381 + 308, S00163MR, SANTA CRUZ, OCCIDENTAL MINDORO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Amnay Flood Control (Bagong Sikat Section), Santa Cruz, Occidental Mindoro
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0000040

₱213,291.00 · FY2017

Released to 0008 - Regional Office VIII Ter Oli (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

76 projects · ₱4.0B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-BALUD NATIONAL ROAD CONNECTING BARANGAY DANAO IN SUPPORT OF AGRIBUSINESS, BALUD, MASBATE PROVINCE

Region V, Region V

2018₱179.1M
Reported complete (DPWH)
No sat.

CONST./REPAIR/REHAB./IMPVT. OF SWANG-AGPANABAT ROAD, ROMBLON, ROMBLON STA.15+290-STA.15+603.35, STA.15+877.92-STA. 16+637.30 STA.16+895.50-STA. 17+208.80, STA.17+500.00-STA.-STA.17+857.80 STA. 18+295.80-STA.20+513.60, STA. 20+660.00-STA.21+617.00 W/EXCEPT

Region IV-B, Region IV-B

2016₱168.4M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS-MASBATE-CATAINGAN-PLACER ROAD, MASBATE PROVINCE

Region V, Region V

2018₱155.6M
Reported complete (DPWH)
No sat.

ROAD UPGRADING OF SIBUYAN CIRC RD K0023+563-K0025+487; K0025+524-K0026+198; K0027+1086-K0029+237; SI

Region IV-B, Region IV-B

2016₱146.2M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) OF SIBUYAN CIRCUM. RD., KO029+237-KO030+346; KO030+408-KO031+364; KO031+431-KO031+497; KO031+571-KO031+638; KO032+555-KO033+073; KO033+086-KO033+615; KO034+094-KO035+690; KO035+908-KO036+528, SIBUYAN IS., ROMBLON

Region IV-B, Region IV-B

2016₱145.8M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, SAN FERNANDO-SAN JACINTO-MONREAL ROAD, MASBATE, TICAO ISLAND, MASBATE

Region V, Region V

2018₱144.7M
Reported complete (DPWH)
View all 76 projects →

4. Implementation

Contract Amount

₱35,945,766.17

Progress

Reported complete (DPWH)

Start Date

May 19, 2017

Target End

October 16, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “NETWORK DEVELOPMENT OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, CROSSING MWCR (POLA)-CASAGUE-JCT ALAKAAC RD K0379 + 996 K0381 + 308, S00163MR, SANTA CRUZ, OCCIDENTAL MINDORO.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/2c6663c1-b731-4067-8354-6c3377366629

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionOccidental MindoroSanta CruzBarahan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.