Construction of Flood Mitigation Structure along Aringay River Basin, Main Stream (Kagaling River Section), Tuba, Benguet
Construction of Flood Mitigation Structure along Aringay River Basin, Main Stream (Kagaling River Section), Tuba, Benguet is a DPWH-tracked public work in TUBA (BENGUET), BENGUET, Cordillera Administrative Region. Reported contract value: ₱84,877,709.32. Status: Reported complete (DPWH). Contractor on record: MG SAMIDAN CONST. Figures trace to sumbong.
Total Contract Cost
