ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE-SECONDARY ROADS, ABRA-KALINGA ROAD (K0419+484-K0421+600)
ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE-SECONDARY ROADS, ABRA-KALINGA ROAD (K0419+484-K0421+600) is a DPWH-tracked public work in Abra DEO, Cordillera Administrative Region. Reported contract value: ₱19,599,994.88. Status: Reported complete (DPWH). Contractor on record: PHESCO INC 145. Figures trace to dpwh.
Total Contract Cost
