CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT MOLINO RIVER, MOLINO 4, BACOOR, CAVITE (PHASE 2)
CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT MOLINO RIVER, MOLINO 4, BACOOR, CAVITE (PHASE 2) is a DPWH-tracked public work in Region IV-A, Region IV-A. Reported contract value: ₱48,241,249.84. Status: Past target date (DPWH On-Going). Contractor on record: E F CHUA CONST INC. Figures trace to dpwh.
Total Contract Cost




