CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BAGO RIVER, CAVAN-CULO SECTION (PHASE 2)
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BAGO RIVER, CAVAN-CULO SECTION (PHASE 2) is a DPWH-tracked public work in Negros Occidental 4th DEO, Negros Island Region. Reported contract value: ₱98,009,829.29. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: LEGACY CONST CORP FORMERLY: LEGACY CONST. Figures trace to dpwh.
Total Contract Cost