PACKAGE VIII: 1.) COMPLETION OF 1 STY 2 CL SCHOOL BUILDING, (7.00M X 18.00M) MALAYUGAN ES, MALAYUGAN, FLORA, APAYAO 2.) COMPLETION OF 1 STY 2 CL SCHOOL BUILDING, (7.00M X 18.00M) MATAGUISI ES, MATAGUISI, PUDTOL, APAYAO
PACKAGE VIII: 1.) COMPLETION OF 1 STY 2 CL SCHOOL BUILDING, (7.00M X 18.00M) MALAYUGAN ES, MALAYUGAN, FLORA, APAYAO 2.) COMPLETION OF 1 STY 2 CL SCHOOL BUILDING, (7.00M X 18.00M) MATAGUISI ES, MATAGUISI, PUDTOL, APAYAO is a DPWH-tracked public work in Apayao 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱1,123,369.62. Status: Reported complete (DPWH). Contractor on record: ARESEF ENGINEERING. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
