Flood Control and Drainage24C00497

SUSTAINABLE INFRAS PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRAS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALANGAAN RIVER (DOWNSTREAM), BARANGAY CAMACHILE, DONA REMEDIOS TRINIDAD, BULACAN

SUSTAINABLE INFRAS PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRAS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALANGAAN RIVER (DOWNSTREAM), BARANGAY CAMACHILE, DONA REMEDIOS TRINIDAD, BULACAN is a DPWH-tracked public work in Region III, Region III. Reported contract value: ₱47,549,918.06. Status: Past target date (DPWH On-Going). Contractor on record: FIVE TRAVELLERS CONST INC. Figures trace to dpwh.

Region III, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2024 GAA. DBM GAA FY2024

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

10 projects · ₱312.6M total · 0 flags

Other projects by this contractor

No sat.

Construction of Flood Control Structure along Malangaan River (Upstream), Barangay Camachile, Doña Remedios Trinidad, Bulacan

DOÑA REMEDIOS TRINIDAD (BULACAN), BULACAN, Region III

2024₱48.2M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CALICANTO, SAN JUAN, B

Batangas 4th DEO, Region IV-A

2025₱44.1M
Past target date (DPWH On-Going)
No sat.

Construction of Revetment along Lawaye River (Palahanan Section), San Juan, Batangas

SAN JUAN (BATANGAS), BATANGAS, Region IV-A

2023₱39.2M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG LAWAYE RIVER (SICO 2.0 SECTION), SAN JU

Batangas 4th DEO, Region IV-A

2024₱38.6M
Past target date (DPWH On-Going)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PAMPANGA RIVER, BARANGAY ALUA, PHASE 1, SAN ISIDRO, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2025₱34.1M
Reported complete (DPWH)
No sat.

Construction of Flood Mitigation Structure along Lawaye River, Barangay Palahanan 2.0, San Juan, Batangas

SAN JUAN (BATANGAS), BATANGAS, Region IV-A

2022₱27.6M
Reported complete (DPWH)
View all 10 projects →

4. Implementation

Contract Amount

₱47,549,918.06

Progress

Past target date (DPWH On-Going)

Start Date

July 15, 2024

Target End

March 11, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.