CONSTRUCTION OF FLOOD CONTROL STRUCTURE BANK PROTECTION ALONG AYUNGON RIVER WITH GUIMARAS STRAIT AS AN OUTFALL INCLUDING RECHANNELING, WIDENING AND DEEPENING OF RIVERBED SAN ENRIQUE-AYUNGON VALLADOLID SECTION, SAN ENRIQUE, VALLADOLID, NEGROS OCCIDENTAL
CONSTRUCTION OF FLOOD CONTROL STRUCTURE BANK PROTECTION ALONG AYUNGON RIVER WITH GUIMARAS STRAIT AS AN OUTFALL INCLUDING RECHANNELING, WIDENING AND DEEPENING OF RIVERBED SAN ENRIQUE-AYUNGON VALLADOLID SECTION, SAN ENRIQUE, VALLADOLID, NEGROS OCCIDENTAL is a DPWH-tracked public work in Negros Occidental 4th DEO, Negros Island Region. Reported contract value: ₱46,549,990.16. Status: Reported complete (DPWH). Contractor on record: SILVER DRAGON CONST. Figures trace to dpwh.
Total Contract Cost